CN204475085U - A kind of tune rail support for track switch construction - Google Patents
A kind of tune rail support for track switch construction Download PDFInfo
- Publication number
- CN204475085U CN204475085U CN201520100877.8U CN201520100877U CN204475085U CN 204475085 U CN204475085 U CN 204475085U CN 201520100877 U CN201520100877 U CN 201520100877U CN 204475085 U CN204475085 U CN 204475085U
- Authority
- CN
- China
- Prior art keywords
- leading screw
- track switch
- liner plate
- deck type
- girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The utility model relates to construction and lays a railway track and use device technique field, specifically a kind of tune rail support for track switch construction, comprise leading screw, deck type crossbeam, deck type crossbeam two ends are respectively equipped with a leading screw, deck type crossbeam comprises girder, nut and liner plate, and girder two ends offer circular hole, and nut and liner plate are located in this circular hole, liner plate center offers a circular hole, and leading screw is located at deck type crossbeam two ends by the circular hole at girder two ends and liner plate center.The utility model is lightweight, detachable, simple to operate, and operating efficiency is high, and deck type crossbeam can adjust its length according to track switch model, thus meets dissimilar track switch and construction needs.Secondly, deck type beam thickness of the present utility model is little, and between railway roadbed concrete, space is comparatively large, facilitates concrete construction operation.In addition, the rotatable lifting of the leading screw in the utility model, can need adjustment railroad turnout steel rail height according to scene, meet job requirements, easy to use, market prospects are optimistic.
Description
[technical field]
The utility model relates to construction and lays a railway track and use device technique field, specifically a kind of tune rail support for track switch construction.
[background technology]
Urban track traffic is an important component part of urban public transport, and along with development and the urbanization process quickening of national economy, the development of track traffic is also accelerated thereupon.The key of track traffic often and the important component part of duration node and track switch is constructed.
In current industry in railway, track traffic Turnout Monolithic Track Bed Construction, point components is supported, assembles, track condition adjustment, all need track switch to support to design height, and ensure that bearing surface becomes level.Track switch and double crossover construction in, point components is supported, assembles, track condition adjustment, all need track switch to support to design height, and ensure that bearing surface becomes level.Traditional technique is with hydraulic jack and chock or track jack lifting track switch, after building track switch supporting pier concrete, readjusts track condition thus carries out the concrete construction of track switch railway roadbed.When carrying out track switch railway roadbed once-pouring of concrete construction technology, conventional practice is loaded down with trivial details, and operating efficiency is lower, can not meet construction requirement.
[utility model content]
The utility model is exactly to solve the not enough and defects such as track switch construction is inconvenient, efficiency of construction is low in prior art, the tune rail support for track switch construction that a kind of novel structure, safe and reliable, easy to use and efficiency of construction are high is provided, comprise leading screw, deck type crossbeam, deck type crossbeam two ends are respectively equipped with a leading screw, deck type crossbeam comprises girder, nut and liner plate, girder two ends offer circular hole, nut and liner plate are located in this circular hole, liner plate center offers a circular hole, and leading screw is located at deck type crossbeam two ends by the circular hole at girder two ends and liner plate center.
Girder adopts 10# channel-section steel, its sectional dimension is 800mm × 100mm × 48mm, the Circularhole diameter at girder two ends is respectively 70mm, and the center of circle of circular hole is 50mm to the distance of two ends end points, and girder, nut and liner plate are welded to each other the deck type beam structure forming integral type.
Round nut adopts diameter to be the nonstandard round nut that the 45# steel of Φ 68mm manufactures M50 × 48mm, all heat-treats.
Liner plate adopt thickness be 5mm Q235 steel plate processing and fabricating integrally size be 100 × 100mm and the structure in Φ 70mm hole is opened at middle part, and all to heat-treat.
Leading screw adopts the 45# rod iron processing and fabricating of a Φ 50mm, all heat-treat, the sectional dimension of leading screw is Φ 50mm × 700mm, leading screw comprises the main part of regular length and the adjustment member of adjustable-length, wherein leading screw main part length is 500mm, 15mm through hole is bored at leading screw top, inserts adjustment instrument rotating threaded shaft, reaches the effect of adjusting pole.
Compared with the existing technology, its advantage is the utility model:
1. lightweight, detachable, simple to operate, operating efficiency is high;
2. deck type crossbeam can adjust its length according to track switch model, thus meets dissimilar track switch and construction needs;
3. deck type beam thickness is little, and between railway roadbed concrete, space is comparatively large, facilitates concrete construction operation;
4. the rotatable lifting of leading screw, can need adjustment railroad turnout steel rail height according to scene, meet job requirements.
[accompanying drawing explanation]
Fig. 1 is the primary structure schematic diagram of the utility model embodiment;
Fig. 2 (a) is the utility model embodiment main beam structure front view;
Fig. 2 (b) is the top view of the utility model Fig. 2 (a);
Fig. 3 is the nut structure figure of the utility model embodiment;
Fig. 4 is the lining plate structure figure of the utility model embodiment;
Fig. 5 is the screw structure schematic diagram of the utility model embodiment;
Fig. 6 is the using state schematic diagram of the utility model embodiment;
As shown in the figure, in figure: 1. deck type crossbeam 2. leading screw 3. leading screw main part 4. leading screw adjustment member 5. Control benchmark 6. design elevation 7. adjusts rail support 8. track centerline;
Fig. 1 is specified to be Figure of abstract of the present utility model.
[detailed description of the invention]
Below in conjunction with accompanying drawing, the utility model is described in further detail, and the structure of this device and principle are very clearly concerning the people of this specialty.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Tune rail props up in vertical civil engineering structure substrate by the utility model, by the adjustable leading screw supporting track switch of support both sides, utilizes the deadweight of track switch to form stable supporting system, coordinates cross binding to complete the track condition adjustment of solid concrete roabed track switch.As shown in Figure 1, its structure is divided into two parts: deck type crossbeam adopts can weld the every 50mm place perforate in channel-section steel two ends in length range, is welded into entirety in conjunction with feed screw nut and liner plate.The load-carrying members of this support of deck type crossbeam, adopt a 10# channel-section steel, two round nuts and two blocks of liner plates to be welded to each other and form, sectional dimension is 800mm × 100mm × 48mm.As shown in Fig. 2 (a) He Fig. 2 (b), the 10# channel-section steel circular hole that every 50mm place opens Φ 70mm in the length range of two ends is adopted to be made.Supporting two leading screws support track switch, realize the adjustment to track switch height by two rhizoid thick sticks in rotating nut.Leading screw is used for support track switch, adopt the 45# rod iron processing and fabricating of a Φ 50mm, all heat-treat, sectional dimension is Φ 50mm × 700mm, wherein screw part length is 500mm, and 10mm through hole is bored at leading screw top, inserts adjustment instrument rotating threaded shaft, reach the effect of adjusting pole, as shown in Figure 5.As shown in Figure 3, adopt diameter to be the nonstandard round nut that the 45# steel of Φ 68mm manufactures M50 × 48mm, all heat-treat.After railroad turnout steel rail connects, rail bearing support is arranged by every 3 ~ 4 switch ties, rail bearing support holds separate type on adopting, namely each bearing support only controls absolute altitude and the plan-position of one rail, railway switch or railway frog, the column of bearing support is processed with Ф 50 steel pipe, its top be deck type crossbeam heighten bolt, be liner plate bottom it, make bearing support can be firm fixing alone.As shown in Figure 4, liner plate adopts thickness to be that the Q235 steel plate of 5mm manufactures in the middle part of 100 × 100mm and opens Φ 70mm hole, all heat-treats.
The utility model channel-section steel and nut and liner plate soldering group are dressed up and are adjusted rail support, and length can be determined according to track switch model, and perforate on support rail plate also welds feed screw nut, can realize Height Adjustment by leading screw, coordinate track forces can by track switch modulation level state.For the bulk strength strengthening support rail plate sets liner plate, lower liner plate perforate is corresponding with support rail plate, is welded into entirety by feed screw nut, thus realizes the stable of support.Rotating threaded shaft adjustment track switch height, by track forces and " L " chi determination track original state, and is finally adjusted to and meets design requirement.
Using method of the present utility model is: after track switch being lifted proper height by track jack and hydraulic jack, below rail, place track switch adjust rail, after transferring rail, rail has held by support rail frame, utilizes two ends leading screw to coordinate track forces to need adjustment track switch height according to operation.
Operating procedure is as follows:
(1) with track jack, rail is lifted proper height;
(2) below rail, place track switch adjust rail;
(3) slowly transfer rail, pad adjusts rail to be paved by rail;
(4) need to promote or decline track switch height according to operation.
Rail pad rail bracket operation instruction:
(1) track switch adjusts rail to handle with care, prevents impact damage from deforming;
(2) carefully should check the connection state of each parts before using, peventing member connects loosening or damages;
(3) support rail frame screw and leading screw regularly should add lubrication oil;
(4) slowly should operate during operation, forbid firmly to knock mounting system.
(5) tackle leading screw during track switch railway roadbed concrete construction operation and take safeguard procedures, preventing pollution screw thread.
Claims (5)
1. the tune rail support for track switch construction, comprise leading screw, deck type crossbeam, it is characterized in that described deck type crossbeam two ends are respectively equipped with a leading screw, deck type crossbeam comprises girder, nut and liner plate, girder two ends offer circular hole, nut and liner plate are located in this circular hole, and described liner plate center offers a circular hole, and leading screw is located at deck type crossbeam two ends by the circular hole at girder two ends and liner plate center.
2. as claimed in claim 1 a kind of for track switch construction tune rail support, it is characterized in that described girder adopts 10# channel-section steel, its sectional dimension is 800mm × 100mm × 48mm, the Circularhole diameter at girder two ends is respectively 70mm, the center of circle of circular hole is 50mm to the distance of two ends end points, and described girder, nut and liner plate are welded to each other the deck type beam structure forming integral type.
3. a kind of tune rail support for track switch construction as claimed in claim 1, is characterized in that described round nut adopts diameter to be the nonstandard round nut that the 45# steel of Φ 68mm manufactures M50 × 48mm.
4. a kind of tune rail support for track switch construction as claimed in claim 1, it is characterized in that described liner plate adopt thickness be 5mm Q235 steel plate processing and fabricating integrally size be 100 × 100mm and middle part has the structure in Φ 70mm hole.
5. as claimed in claim 1 a kind of for track switch construction tune rail support, it is characterized in that described leading screw adopts the 45# rod iron processing and fabricating of a Φ 50mm, the sectional dimension of leading screw is Φ 50mm × 700mm, leading screw comprises the main part of regular length and the adjustment member of adjustable-length, wherein leading screw main part length is 500mm, 15mm through hole is bored at leading screw top, inserts adjustment instrument rotating threaded shaft, reaches the effect of adjusting pole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520100877.8U CN204475085U (en) | 2015-02-12 | 2015-02-12 | A kind of tune rail support for track switch construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520100877.8U CN204475085U (en) | 2015-02-12 | 2015-02-12 | A kind of tune rail support for track switch construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204475085U true CN204475085U (en) | 2015-07-15 |
Family
ID=53630888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520100877.8U Expired - Fee Related CN204475085U (en) | 2015-02-12 | 2015-02-12 | A kind of tune rail support for track switch construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204475085U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109338830A (en) * | 2018-08-31 | 2019-02-15 | 中铁上海工程局集团有限公司 | A kind of full working scope Fast Installation and the track condition tune rail bearing support of disassembly |
CN112726303A (en) * | 2020-12-31 | 2021-04-30 | 解廷伟 | Lower bearing type track lifting tool and subway track panel track lifting construction method adopting same |
-
2015
- 2015-02-12 CN CN201520100877.8U patent/CN204475085U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109338830A (en) * | 2018-08-31 | 2019-02-15 | 中铁上海工程局集团有限公司 | A kind of full working scope Fast Installation and the track condition tune rail bearing support of disassembly |
CN109338830B (en) * | 2018-08-31 | 2023-11-21 | 中铁上海工程局集团有限公司 | Rail-state rail-adjusting supporting frame capable of being installed and dismounted rapidly under all working conditions |
CN112726303A (en) * | 2020-12-31 | 2021-04-30 | 解廷伟 | Lower bearing type track lifting tool and subway track panel track lifting construction method adopting same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103452018B (en) | Track gauge correction method for double-block type ballastless track construction | |
CN206521678U (en) | Template fixed support device | |
CN207062660U (en) | Streetcar track state adjustment support pedestal | |
CN204475085U (en) | A kind of tune rail support for track switch construction | |
CN206554254U (en) | A kind of hinged column base structure of Steel Portal Frames | |
CN203729173U (en) | Track adjusting support structure for adjusting altitudes of track panels | |
CN104141264A (en) | Plate-type ballastless track laying precision keeping method | |
CN201794007U (en) | Plate-pressing device for railway ballastless track plate | |
CN203282598U (en) | Movable steel pedestal with adjustable jacking | |
CN103273567B (en) | Movable steel pedestal with adjustable jacking and construction method thereof | |
CN206693030U (en) | A kind of compound section steel box girder for high-speed railway | |
CN206956534U (en) | A kind of railway and track traffic suspended beam type Frame Pier | |
CN106436499B (en) | A kind of streetcar track mounting device and its installation and application | |
CN107881911A (en) | Spacing timber regulation system and its erection method at rail traffic bridge girder steel beam seam | |
CN210368464U (en) | Ballastless track structure with embedded lifting device | |
CN204212060U (en) | One falls beam steel work pad device | |
CN211571982U (en) | Factory building steel construction support column connecting device | |
CN114717956A (en) | Bridge pier column diaphragm construction umbrella-type support system | |
CN209853576U (en) | Multi-direction adjustable track fixing device | |
CN208305364U (en) | A kind of supertronic device of Prefabricated bar bottom pre-embedded steel slab | |
CN103741710B (en) | Without the construction method of parallels erection equipment | |
CN204298702U (en) | The vertical lifting tool of track plates | |
CN201635393U (en) | Movable bottom-formwork structure at precast beam slab bearer | |
CN206233259U (en) | A kind of supporting construction for carrying elevation regulator | |
CN104294764B (en) | Fall beam steel work pad device and utilize it to carry out the beam buttress construction technology that falls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150715 Termination date: 20190212 |