CN202323865U - 一种新型护岸组合结构 - Google Patents

一种新型护岸组合结构 Download PDF

Info

Publication number
CN202323865U
CN202323865U CN 201120490612 CN201120490612U CN202323865U CN 202323865 U CN202323865 U CN 202323865U CN 201120490612 CN201120490612 CN 201120490612 CN 201120490612 U CN201120490612 U CN 201120490612U CN 202323865 U CN202323865 U CN 202323865U
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
steel
steel pipe
novel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120490612
Other languages
English (en)
Inventor
张齐焰
朱林祥
高志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Harbor Consultants
Original Assignee
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Harbor Consultants filed Critical CCCC Third Harbor Consultants
Priority to CN 201120490612 priority Critical patent/CN202323865U/zh
Application granted granted Critical
Publication of CN202323865U publication Critical patent/CN202323865U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本实用新型公开了一种新型护岸组合结构,该组合结构包括钢板桩、钢管桩以及钢筋混凝土承台,所述钢板桩沿河道侧护岸紧密连续设置,所述钢管桩分布设置在钢板桩靠岸侧,所述钢板桩和钢管桩之间通过钢筋混凝土承台连接形成受力整体。本实用新型结构可应用于航道及护岸工程,尤其是在施工场地受限、护岸紧邻已有建筑物、结构位移控制要求高的区段,具有良好效果。

Description

一种新型护岸组合结构
技术领域
本实用新型涉及一种护岸结构,具体涉及一种由钢板桩、钢管桩和现浇承台组成的新型护岸结构。
背景技术
内河航道整治工程,尤其是城区段河道的整治工程,对于提高河道通航条件,保障河道水流畅通,美化城市景观具有重大意义。然而,护岸施工过程中会遇到一系列技术难题,影响工程的顺利开展。主要的难题有以下几点:
(1)常规护岸结构的施工,不可避免的需要征地拆迁,增加了工程难度,提高了工程总投资费用;
(2)施工过程中的噪声和震动会影响居民正常生活的问题,危害房屋结构安全;
(3)城区段护岸紧邻已有建筑物,新建护岸结构的位移控制要求高。
长期以来钢板桩结构由于其施工简便,结构强度大,较多的应用于临时基坑支护和较深的水上围堰。由于钢板桩造价高,以及钢板桩本身的柔性结构,总体变形较大,其较少用于永久工程。
实用新型内容
本实用新型为了克服常规护岸结构的在城区段施工所存在的问题,而提供一种由钢板桩、钢管桩和现浇承台组成的护岸结构,采用静压施工钢板桩和钢管桩,在施工场地受限、临近居民生活区、结构位移控制要求高的区段具有良好的应用效果,具有施工简单,施工影响和干扰小,施工所需场地较少的特点。
为了达到上述目的,本实用新型采用如下的结构:
一种新型护岸组合结构,所述组合结构包括钢板桩、钢管桩以及钢筋混凝土承台,所述钢板桩沿河道侧护岸紧密连续设置,所述钢管桩分布设置在钢板桩靠岸侧,所述钢板桩和钢管桩之间通过钢筋混凝土承台连接形成受力整体。
在本实用新型的最优实例中,所述钢板桩和钢管桩匀距分布。
进一步的,所述钢筋混凝土承台的分段长度为10.0m~15.0m,分段间设20mm的伸缩缝。
进一步的,所述钢板桩泥面以上区段涂有防腐涂层。
根据上述方案得到的本实用新型采用钢板桩与钢管桩的组合护岸结构,该结构施工无需大量的土方开挖,可有效减少施工拆迁量,同时施工过程中可采用静压法施工,施工干扰小。该护岸结构还具有建成后结构位移小,保证护岸后方建筑物地基不受影响的优点。
附图说明
以下结合附图和具体实施方式来进一步说明本实用新型。
图1为本实用新型的断面示意图。
图2为本实用新型的桩位示意图。
图中标号说明:
1-钢板桩、2-钢管桩、3-现浇混凝土承台、4-栏杆、5-护岸前沿线、6-河道底边线、7-地基土、8-护岸顶面线、9-原有建筑物、10-天然泥面线、11-结构缝。
具体实施方式
为了使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本实用新型。
参见图1和图2,本实用新型提供的新型护岸组合结构,主要包括钢板桩1、钢管桩2以及钢筋混凝土承台3。
其中,钢板桩1沿河道侧护岸均匀的密排打入,钢管桩3在钢板桩靠岸侧均匀打入,钢板桩及钢管桩均可采用静压法施工,施工干扰小。
钢管桩2与钢板桩1之间采用钢筋混凝土承台3连接成受力整体,共同抵抗侧向土压力。
对于上述方案,本实用新型还提供进一步的优化方案:
钢筋混凝土承台3为多分段结构,其中分段长度为10.0m~15.0m,分段间设20mm的伸缩缝。
再者,钢板桩1泥面以上区段在沉桩前涂防腐涂层,增加组合护岸结构的耐久性。
基于上述方案,本实用新型的具体实施过程如下:
参见图1,施工时,采用静压法打入钢板桩1、钢管桩2,然和现浇混凝土承台3,将三者连成整体。钢板桩有效挡土,钢管桩可通过承台将钢板桩护岸拉住,减少由于钢板桩变形引起的侧向位移。
现浇混凝土承台3时,可在靠近护岸前沿线5附近设置栏杆4,防止行人及车辆落水。
完成护岸施工后,可进行墙前疏浚,形成新的河道底边线6;同时墙后有少量的墙后回填,形成护岸顶边线8。
整个组合换结构可有效抵抗墙后地基土7产生的侧向土压力,且施工简单,结构位移小。相对于拉锚板桩,该结构无需拉锚场地,在施工场地紧张的区段尤其适用。
参见图2,钢板桩1、钢管桩2和钢筋混凝土现浇承台3组成的护岸结构为统一整体,该结构需间隔10.0m~15.0m设置结构缝11,减少混凝土承台结构3的由于热胀冷缩产生的开裂。
同时钢板桩1在承台底至入土0.5m的距离内涂防腐涂料,增加结构的耐久性。
由上可知,本实用新型可在狭窄的施工场地开展施工,施工过程对周围居民和原有建筑物9的干扰小,护岸建成后结构位移小。
以上显示和描述了本实用新型的基本原理、主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。

Claims (4)

1.一种新型护岸组合结构,其特征在于,所述组合结构包括钢板桩、钢管桩以及钢筋混凝土承台,所述钢板桩沿河道侧护岸紧密连续设置,所述钢管桩分布设置在钢板桩靠岸侧,所述钢板桩和钢管桩之间通过钢筋混凝土承台连接形成受力整体。
2.根据权利要求1所述的一种新型护岸组合结构,其特征在于,所述钢板桩和钢管桩匀距分布。
3.根据权利要求1所述的一种新型护岸组合结构,其特征在于,所述钢筋混凝土承台的分段长度为10.0m~15.0m,分段间设20mm的伸缩缝。
4.根据权利要求1所述的一种新型护岸组合结构,其特征在于,所述钢板桩泥面以上区段涂有防腐涂层。
CN 201120490612 2011-11-30 2011-11-30 一种新型护岸组合结构 Expired - Fee Related CN202323865U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120490612 CN202323865U (zh) 2011-11-30 2011-11-30 一种新型护岸组合结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120490612 CN202323865U (zh) 2011-11-30 2011-11-30 一种新型护岸组合结构

Publications (1)

Publication Number Publication Date
CN202323865U true CN202323865U (zh) 2012-07-11

Family

ID=46435849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120490612 Expired - Fee Related CN202323865U (zh) 2011-11-30 2011-11-30 一种新型护岸组合结构

Country Status (1)

Country Link
CN (1) CN202323865U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088273A (zh) * 2014-06-25 2014-10-08 中交第三航务工程局有限公司 一种格型钢板桩主格1/4圆筒陆域预拼方法
CN106679619A (zh) * 2016-12-19 2017-05-17 长安大学 测试路桥过渡段台背沉降及路面面层层底弯拉应变的装置
CN106759105A (zh) * 2017-02-27 2017-05-31 中交第三航务工程勘察设计院有限公司 一种前疏排桩高桩承台护岸结构
CN108239963A (zh) * 2018-01-25 2018-07-03 中交第三航务工程勘察设计院有限公司 一种高桩承台式生态驳岸结构及其施工方法
CN108691299A (zh) * 2018-05-14 2018-10-23 中交第三航务工程勘察设计院有限公司 一种门架式护岸结构及施工方法
CN110241814A (zh) * 2019-05-24 2019-09-17 中交第三航务工程勘察设计院有限公司 一种钢筋混凝土与钢板桩组合结构

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088273A (zh) * 2014-06-25 2014-10-08 中交第三航务工程局有限公司 一种格型钢板桩主格1/4圆筒陆域预拼方法
CN104088273B (zh) * 2014-06-25 2016-01-27 中交第三航务工程局有限公司 一种格型钢板桩主格1/4圆筒陆域预拼方法
CN106679619A (zh) * 2016-12-19 2017-05-17 长安大学 测试路桥过渡段台背沉降及路面面层层底弯拉应变的装置
CN106679619B (zh) * 2016-12-19 2019-09-24 长安大学 测试路桥过渡段台背沉降及路面面层层底弯拉应变的装置
CN106759105A (zh) * 2017-02-27 2017-05-31 中交第三航务工程勘察设计院有限公司 一种前疏排桩高桩承台护岸结构
CN108239963A (zh) * 2018-01-25 2018-07-03 中交第三航务工程勘察设计院有限公司 一种高桩承台式生态驳岸结构及其施工方法
CN108691299A (zh) * 2018-05-14 2018-10-23 中交第三航务工程勘察设计院有限公司 一种门架式护岸结构及施工方法
CN110241814A (zh) * 2019-05-24 2019-09-17 中交第三航务工程勘察设计院有限公司 一种钢筋混凝土与钢板桩组合结构

Similar Documents

Publication Publication Date Title
CN202323865U (zh) 一种新型护岸组合结构
CN1837511B (zh) 一种双排围堰及其制作方法
CN102011391B (zh) 一种软弱地基的加固处理方法
CN104196034A (zh) 一种利用钢板桩作为支护围堰的基坑施工方法
CN101597904B (zh) 一种防水板桩围堰及其施工方法
CN103410156B (zh) 一种可回收直立式钢管前撑围护结构及其应用方法
CN103015367B (zh) 一种高效经济型驳岸的构筑方法
CN103911996B (zh) 临近既有建筑物钢板桩拔除施工方法
CN104164868A (zh) 支护凹凸咬合止水桩
CN101260664A (zh) 一种软土地基大型钢浮箱闸首的施工方法
CN103696416A (zh) 一种地基处理新方法
CN202689009U (zh) 一种钢板桩与管桩组合基坑支护结构
CN110055973B (zh) 施工空间受限时的高铁桥下基坑围护结构与止水方法
CN101892650B (zh) 复式海堤及其施工方法
CN1163654C (zh) 一种建筑基坑支护结构及其施工方法
CN106869153A (zh) 一种井点降水快速处理软地基的方法
CN207538055U (zh) 一种瘦断面折线型围堰结构
CN108411934B (zh) 浮式管桩、堤坝挡土结构及其施工方法
CN2878518Y (zh) 应力释放笼
CN205975551U (zh) 一种用于水中钢板桩施工的施工平台
CN206052770U (zh) 一种使用钻孔灌注桩结合压密注浆的挡土墙
CN204510181U (zh) 一种浅水区钻孔平台
CN103966997B (zh) 利用带钢套筒的灌注工程桩进行地基处理的施工方法
CN206655181U (zh) 一种复合式锚碇桩墙结构
CN208501613U (zh) 临近建筑物深河槽岸墙支护结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120711

Termination date: 20161130

CF01 Termination of patent right due to non-payment of annual fee