Upper connecting block mounting platform of slicing rolling mill Download PDFInfo
- Publication number
- CN202290743U CN202290743U CN201120323069XU CN201120323069U CN202290743U CN 202290743 U CN202290743 U CN 202290743U CN 201120323069X U CN201120323069X U CN 201120323069XU CN 201120323069 U CN201120323069 U CN 201120323069U CN 202290743 U CN202290743 U CN 202290743U
- Authority
- CN
- China
- Prior art keywords
- full hall
- mounting platform
- block mounting
- contiguous block
- formula scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model relates to installation of rolling mills, particularly relates to a platform for mounting a framework of a rolling mill, and discloses an upper connecting block mounting platform of a slicing rolling mill. The upper connecting block mounting platform comprises a full hall scaffold, a guardrail is disposed at the top of the full hall scaffold, safety nets are fully laid on the periphery of the full hall scaffold, welding tubes are erected to form the top of the full hall scaffold, and double-layered bamboo gang boards are laid on the top of the full hall scaffold, and are bound on the welding tubes at the top of the full hall scaffold via iron wires. The upper connecting block mounting platform can guarantee smooth installation of upper connecting blocks, positioning keys and board connecting studs.
Description
Technical field
The utility model relates to milling train to be installed, and relates in particular to the platform that a kind of rolling-mill housing is installed usefulness.
Background technology
Along with the needs of the speed-raising and the national defense construction of national economy, China need make a collection of rolling mill and put into operation, and for country provides Wide and Thick Slab sheet material, the Wide and Thick Slab production line is all successively gone up by domestic for this reason each big steel group.The characteristics of wide and heavy plate mill equipment are exactly that equipment is heavy, add construction unit in order to reduce investment outlay, and the elevating capacity of driving not will consider the requirement of construction stage.
Make and operating expenses in order to reduce, employing be that burst is made, require three-dimensional at the scene assembling to adjust to the right place; Seem simply from assembled in situ, only a few bulk solids assemble, and are no problem in theory; But in practical operation, on solid space, adjust to installation accuracy, the reliable and secure connection of each parts puts in place; And column safety and stability, difficulty of construction is still very big.
The last contiguous block of milling train need carry out connecting bolt installation, contiguous block adjustment, the installation of horizontal key and entablature fitting operation.These needs of work are aloft accomplished, and common aerial construction method is for the workmen, and difficulty is big, and are dangerous high.
Summary of the invention
The utility model is intended to address the aforementioned drawbacks, and contiguous block mounting platform on a kind of burst milling train is provided.The utility model can guarantee that contiguous block and positioning key, memorial archway connect carrying out smoothly that double-screw bolt installs.
For addressing the above problem; Contiguous block mounting platform on a kind of burst milling train, it comprises: full hall formula scaffold, full hall formula scaffold top is provided with guardrail; Be covered with safety net all around; End face adopts welded pipe to set up and forms, and lays double-deck bamboo springboard on it, and pricks in the welded pipe at full hall formula scaffold top with the iron wire binding.
Contiguous block mounting platform on the described burst milling train, said full hall formula scaffold bottom is provided with headblock.
Contiguous block mounting platform on the described burst milling train, the joint height of each vertical rod of said full hall formula scaffold has nothing in common with each other.
Contiguous block mounting platform on the described burst milling train, the cross bar of said full hall formula scaffold is connected with buckle with vertical rod.
Contiguous block mounting platform on the described burst milling train, a said full hall formula scaffold is established the cornerite diagonal brace for four jiaos, bridging is established on four limits, whenever in the middle of all around establishes bridging at a distance from four row's vertical rods one along longitudinally, all diagonal braces and bridging all need by the end to pushing up continuous setting.
This practicality is new adopts full hall scaffold form, and is paved with safety net, and double-deck bamboo springboard is laid in the platform top, and with the iron wire binding firmly.The utility model is that installation personnel provides a safe and reliable construction site, and what contiguous block was installed in the assurance carries out smoothly.
Description of drawings
Below in conjunction with accompanying drawing the utility model is further described:
Fig. 1 is the utility model front view;
Fig. 2 is the utility model side view.
The specific embodiment
As depicted in figs. 1 and 2; Contiguous block mounting platform on a kind of burst milling train, it comprises: full hall formula scaffold 1, full hall formula scaffold 1 top is provided with guardrail 2; Be covered with safety net 3 all around; End face adopts welded pipe to set up and forms, and lays double-deck bamboo springboard 4 on it, and pricks in the welded pipe at full hall formula scaffold 1 top with the iron wire binding.
Contiguous block mounting platform on the described burst milling train, said full hall formula scaffold 1 bottom is provided with headblock 5.
Contiguous block mounting platform on the described burst milling train, the joint height of each vertical rod of said full hall formula scaffold 1 has nothing in common with each other.
Contiguous block mounting platform on the described burst milling train, the cross bar of said full hall formula scaffold 1 is connected with buckle with vertical rod.
Contiguous block mounting platform on the described burst milling train; Said full hall formula scaffold is established the cornerite diagonal brace for four jiaos; Bridging 5 is established on four limits, whenever in the middle of all around establishes bridging 6 at a distance from four row's vertical rods one along longitudinally, and all diagonal braces 5 all need by the end continuous setting to the top with bridging 6.
Claims (5)
1. contiguous block mounting platform on the burst milling train; It is characterized in that it comprises: full hall formula scaffold, full hall formula scaffold top is provided with guardrail; Be covered with safety net all around; End face adopts welded pipe to set up and forms, and lays double-deck bamboo springboard on it, and pricks in the welded pipe at full hall formula scaffold top with the iron wire binding.
2. contiguous block mounting platform on the burst milling train according to claim 1 is characterized in that, said full hall formula scaffold bottom is provided with headblock.
3. contiguous block mounting platform on the burst milling train according to claim 1 is characterized in that, the joint height of each vertical rod of said full hall formula scaffold has nothing in common with each other.
4. contiguous block mounting platform on the burst milling train according to claim 1 is characterized in that, the cross bar of said full hall formula scaffold is connected with buckle with vertical rod.
5. contiguous block mounting platform on the burst milling train according to claim 1; It is characterized in that; Said full hall formula scaffold is established the cornerite diagonal brace for four jiaos; Bridging is established on four limits, whenever in the middle of all around establishes bridging at a distance from four row's vertical rods one along longitudinally, all diagonal braces and bridging all need by the end to pushing up continuous setting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120323069XU CN202290743U (en) | 2011-08-31 | 2011-08-31 | Upper connecting block mounting platform of slicing rolling mill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201120323069XU CN202290743U (en) | 2011-08-31 | 2011-08-31 | Upper connecting block mounting platform of slicing rolling mill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202290743U true CN202290743U (en) | 2012-07-04 |
Family
ID=46359724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201120323069XU Expired - Fee Related CN202290743U (en) | 2011-08-31 | 2011-08-31 | Upper connecting block mounting platform of slicing rolling mill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202290743U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109530445A (en) * | 2018-10-29 | 2019-03-29 | 上海二十冶建设有限公司 | A kind of mill housing top platform modularization method for rapidly mounting |
-
2011
- 2011-08-31 CN CN201120323069XU patent/CN202290743U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109530445A (en) * | 2018-10-29 | 2019-03-29 | 上海二十冶建设有限公司 | A kind of mill housing top platform modularization method for rapidly mounting |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203559594U (en) | Combined type protection shed | |
CN101672118B (en) | Main workshop structure of large heat power plant | |
CN204266124U (en) | The pre-assembled moulding bed of large sections steel box-girder | |
CN202117074U (en) | Foundation bed steel structure for positioning and mounting base of tower crane | |
CN202925957U (en) | Instrumentalized extension-type safety protection shed | |
CN202290743U (en) | Upper connecting block mounting platform of slicing rolling mill | |
CN202866311U (en) | Construction stair protective barrier and veering connecting device | |
CN205475250U (en) | Pin -connected panel steel stair in foundation ditch | |
CN202416854U (en) | Table form concrete formwork device | |
CN204139631U (en) | The guard rail of building site fast demountable | |
CN206279783U (en) | Assembled construction safety channel | |
CN202577162U (en) | Combined-type steel pipe bracket | |
CN203223035U (en) | Unit body for combined type urgent repair tower for high voltage lines | |
CN204850517U (en) | System of pounding is prevented to spelling formula height -adjustable steel construction | |
CN207314793U (en) | Operating platform between a kind of regularization precast stair | |
CN208310404U (en) | Modular suspension moso bamboo ecology enclosure wall | |
CN208456149U (en) | Bracket for reinforcing bar binding | |
CN209976088U (en) | Assembled protection canopy | |
CN210790936U (en) | PC wallboard insert rack | |
CN203247546U (en) | Combined type suspended wall formwork for pouring dam inclined portion | |
CN206635797U (en) | A kind of positioning absolute altitude frame structure for tower crane foundation | |
CN207277373U (en) | A kind of riding track being used in foundation pit construction | |
CN207568333U (en) | A kind of economic and environment-friendly, repeatable assembled steel enclosing and enclosing component | |
CN202520326U (en) | Multifunctional construction platform | |
CN202031323U (en) | Multifunctional reinforcing plate of reinforced concrete early-disassembled beam template system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120704 Termination date: 20200831 |