CN109530445A - A kind of mill housing top platform modularization method for rapidly mounting - Google Patents

A kind of mill housing top platform modularization method for rapidly mounting Download PDF

Info

Publication number
CN109530445A
CN109530445A CN201811265165.6A CN201811265165A CN109530445A CN 109530445 A CN109530445 A CN 109530445A CN 201811265165 A CN201811265165 A CN 201811265165A CN 109530445 A CN109530445 A CN 109530445A
Authority
CN
China
Prior art keywords
milling train
roof panel
mill housing
top platform
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811265165.6A
Other languages
Chinese (zh)
Other versions
CN109530445B (en
Inventor
黄轶
宋文智
李丽昆
余启洋
洪陈超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201811265165.6A priority Critical patent/CN109530445B/en
Publication of CN109530445A publication Critical patent/CN109530445A/en
Application granted granted Critical
Publication of CN109530445B publication Critical patent/CN109530445B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B31/00Rolling stand structures; Mounting, adjusting, or interchanging rolls, roll mountings, or stand frames
    • B21B31/02Rolling stand frames or housings; Roll mountings ; Roll chocks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground
    • F16L1/0246Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Metal Rolling (AREA)
  • Machine Tool Units (AREA)

Abstract

The present invention relates to milling train installing area, specifically a kind of mill housing top platform modularization method for rapidly mounting;It is characterized in that: including step 1, assembling support is made;Step 2 assembles mill housing top platform frame;Step 3 installs related electromechanical tube apparatus on mill housing top platform;Step 4, hoisting platform are located on mill housing top platform support.This milling train top platform modularization method for rapidly mounting, compared with the installation of conventional mill roof panel, it according to on-site actual situations on mill housing roof panel equipment and pipeline formally install in advance on ground, then integral hoisting is in place.The method optimizes working procedure, reduce high altitude operation at the top of milling train, while carrying out the installation of milling train body equipment, the piping of milling train roof panel, wiring operation are unfolded simultaneously, and fluid pressure line connection can be carried out after milling train roof panel integral hoisting is in place and carries out fluid pressure line flushing work.Mill housing installation effectiveness is improved, the equipment set-up time is shortened.

Description

A kind of mill housing top platform modularization method for rapidly mounting
Technical field
The present invention relates to milling train installing area, specifically a kind of mill housing top platform modularization method for rapidly mounting.
Background technique
Cold continuous rolling, hot continuous rolling, single chassis, structure is complicated for multi-set of rolling mill memorial archway top platform, carries out below platform It is high altitude operation when operation, pipe distribution operation is carried out in narrow restricted clearance, construction speed is slow, and construction quality can not protect Card, directly affects entire milling equipment installation and debugging.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, a kind of mill housing top platform modularization Fast Installation side is provided Method.
In order to achieve the above object, the present invention is implemented as follows:
A kind of mill housing top platform modularization method for rapidly mounting, including
Step 1, assembling support is made, 1.5 meters of length, flange is arranged in one end can be connected with bolt and milling train roof panel support It connects;
Step 2, installation on ground entrance side milling train roof panel, outlet side milling train roof panel, two panels platform are bolted by connection, Milling train roof panel support spacing in measuring table bottom after the completion of assembly, it is necessary to meet the milling train roof panel support at the top of rolling-mill housing Center away from;
Step 3, entrance side milling train roof panel in place, outlet side milling train roof panel assembly are lifted on assembling support, passing through company Connecting bolt makes it be connected firmly;
Step 4, milling train roof panel railing is installed, since the piping of milling train roof panel lower hydraulic is more, for convenience of piping construction spelling Filling support height is 1.5 meters, in addition land thickness table top is higher away from ground, need to carry out edge protection in advance, can be convenient for The construction of subsequent roof panel operation;
Step 5, hydraulic valve platform in place, control entrance side and outlet side are hydraulic respectively for total two of milling train top platform hydraulic valve platform Equipment;
Step 6, accumulator in place, milling train top platform accumulator total two match with two hydraulic valve platforms;
Step 7, electrical long-distance control cabinet in place;
Step 8, fluid pressure line piping work is carried out;
Step 9, electric bridge installation is carried out;
Step 10, it hangs the mill housing roof panel memorial archway that hoisting rig lifting combines and is located in milling train top at the top of mill housing In stage support.
This milling train top platform modularization method for rapidly mounting, compared with the installation of conventional mill roof panel, it is according to scene Actual conditions on mill housing roof panel equipment and pipeline formally install in advance on ground, then integral hoisting is in place.This Method optimizes working procedure, reduces high altitude operation at the top of milling train, while carrying out the installation of milling train body equipment, milling train top Platform piping, wiring operation are unfolded simultaneously, and fluid pressure line connection can be carried out after milling train roof panel integral hoisting is in place and carries out liquid Pressure pipe road flushing work.Mill housing installation effectiveness is improved, the equipment set-up time is shortened.
Detailed description of the invention
Fig. 1 is each component layout schematic diagram of mill housing top platform
Fig. 2 is completed schematic diagram on ground for mill housing top platform
Fig. 3 is that mill housing top platform is installed to singlestandmill memorial archway schematic diagram
Fig. 4 is that mill housing top platform is installed to tandem mill memorial archway schematic diagram
In figure: 1 assembling support, 2 entrance side milling train roof panels, 3 outlet side milling train roof panels, 4 milling train roof panel supports, 5 Milling train roof panel railing, 6 hydraulic valve platforms, 7 accumulators, 8 electrical long-distance control cabinets, 9 fluid pressure lines, 10 electric bridges, 11 Hoisting rig, 12 mill housings.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
A kind of realization specific implementation of mill housing top platform modularization method for rapidly mounting comprises the steps of:
Step 1 makes assembling support 1, and length is made by 1.5 metric systems, and flange is arranged in one end can be flat with bolt and milling train top The connection of platform support;
Step 2,3,2 installation on ground entrance side milling train roof panel 2, outlet side milling train roof panel platforms are connected by connection bolt It connects, milling train roof panel support 4 spacing in measuring table bottom after the completion of assembly, it is necessary to which the 4 milling train tops met at the top of 8 rolling-mill housing are flat Platform support center away from;
Step 3 lifts entrance side milling train roof panel 2 in place, 3 assembly of outlet side milling train roof panel on assembling support 1, leads to Crossing connection bolt makes it be connected firmly;
Step 4 installs milling train roof panel railing 5, since the piping of milling train roof panel lower hydraulic is more, for convenience of piping construction 1 height of assembling support is 1.5 meters, in addition land thickness table top is higher away from ground, need to carry out edge protection, Fang Kebian in advance In the construction of subsequent roof panel operation;
Step 5, hydraulic valve platform 6 in place, milling train top platform hydraulic valve platform total 2 control entrance side and outlet side liquid respectively Press equipment;
Step 6, accumulator 7 in place, milling train top platform accumulator total 2 match with 2 hydraulic valve platforms;
Step 7, electrical long-distance control cabinet 8 in place;
Step 8 carries out 9 piping work of fluid pressure line;
Step 9 carries out electric bridge 10 and installs;
Step 10 hangs hoisting rig 11 and lifts the mill housing roof panel memorial archway combined and be located at the top of mill housing 12 and rolls On machine roof panel support 4.

Claims (1)

1. a kind of mill housing top platform modularization method for rapidly mounting, it is characterized in that: including
Step 1, assembling support is made, 1.5 meters of length, flange is arranged in one end can be connected with bolt and milling train roof panel support It connects;
Step 2, installation on ground entrance side milling train roof panel, outlet side milling train roof panel, two panels platform are bolted by connection, Milling train roof panel support spacing in measuring table bottom after the completion of assembly, it is necessary to meet the milling train roof panel support at the top of rolling-mill housing Center away from;
Step 3, entrance side milling train roof panel in place, outlet side milling train roof panel assembly are lifted on assembling support, passing through company Connecting bolt makes it be connected firmly;
Step 4, milling train roof panel railing is installed, since the piping of milling train roof panel lower hydraulic is more, for convenience of piping construction spelling Filling support height is 1.5 meters, in addition land thickness table top is higher away from ground, need to carry out edge protection in advance, can be convenient for The construction of subsequent roof panel operation;
Step 5, hydraulic valve platform in place, control entrance side and outlet side are hydraulic respectively for total two of milling train top platform hydraulic valve platform Equipment;
Step 6, accumulator in place, milling train top platform accumulator total two match with two hydraulic valve platforms;
Step 7, electrical long-distance control cabinet in place;
Step 8, fluid pressure line piping work is carried out;
Step 9, electric bridge installation is carried out;
Step 10, it hangs the mill housing roof panel memorial archway that hoisting rig lifting combines and is located in milling train top at the top of mill housing In stage support.
CN201811265165.6A 2018-10-29 2018-10-29 Modularized rapid installation method for top platform of mill housing Active CN109530445B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811265165.6A CN109530445B (en) 2018-10-29 2018-10-29 Modularized rapid installation method for top platform of mill housing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811265165.6A CN109530445B (en) 2018-10-29 2018-10-29 Modularized rapid installation method for top platform of mill housing

Publications (2)

Publication Number Publication Date
CN109530445A true CN109530445A (en) 2019-03-29
CN109530445B CN109530445B (en) 2023-03-24

Family

ID=65845411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811265165.6A Active CN109530445B (en) 2018-10-29 2018-10-29 Modularized rapid installation method for top platform of mill housing

Country Status (1)

Country Link
CN (1) CN109530445B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114207298A (en) * 2019-06-12 2022-03-18 Sms集团有限公司 Hydraulic control device in rolling mill structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0308643A2 (en) * 1987-09-25 1989-03-29 Sms Schloemann-Siemag Aktiengesellschaft Transport device for rolling mill stands or groups of stands
CN1843645A (en) * 2006-03-07 2006-10-11 中冶赛迪工程技术股份有限公司 Leveling machine
CN101391267A (en) * 2008-11-04 2009-03-25 北京首钢建设集团有限公司 On-line assembling entirety on-position assembling method of edge mill
CN101537973A (en) * 2009-04-21 2009-09-23 武汉冶建安装工程有限责任公司 Method for continuously hoisting rolling mill housings by hydraulic pushing and lifting
CN101664760A (en) * 2008-09-05 2010-03-10 中国二十冶建设有限公司 Method for adjusting housings outside single stand reversible rolling mill
CN102039315A (en) * 2009-10-23 2011-05-04 中冶天工建设有限公司 Method for installing large conical puncher device
CN202290743U (en) * 2011-08-31 2012-07-04 上海宝冶集团有限公司 Upper connecting block mounting platform of slicing rolling mill
CN105421792A (en) * 2015-12-15 2016-03-23 安徽伟宏钢结构集团股份有限公司 Lifting construction process of modular steel structural components

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0308643A2 (en) * 1987-09-25 1989-03-29 Sms Schloemann-Siemag Aktiengesellschaft Transport device for rolling mill stands or groups of stands
CN1843645A (en) * 2006-03-07 2006-10-11 中冶赛迪工程技术股份有限公司 Leveling machine
CN101664760A (en) * 2008-09-05 2010-03-10 中国二十冶建设有限公司 Method for adjusting housings outside single stand reversible rolling mill
CN101391267A (en) * 2008-11-04 2009-03-25 北京首钢建设集团有限公司 On-line assembling entirety on-position assembling method of edge mill
CN101537973A (en) * 2009-04-21 2009-09-23 武汉冶建安装工程有限责任公司 Method for continuously hoisting rolling mill housings by hydraulic pushing and lifting
CN102039315A (en) * 2009-10-23 2011-05-04 中冶天工建设有限公司 Method for installing large conical puncher device
CN202290743U (en) * 2011-08-31 2012-07-04 上海宝冶集团有限公司 Upper connecting block mounting platform of slicing rolling mill
CN105421792A (en) * 2015-12-15 2016-03-23 安徽伟宏钢结构集团股份有限公司 Lifting construction process of modular steel structural components

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114207298A (en) * 2019-06-12 2022-03-18 Sms集团有限公司 Hydraulic control device in rolling mill structure
JP2022535965A (en) * 2019-06-12 2022-08-10 エス・エム・エス・グループ・ゲゼルシャフト・ミト・ベシュレンクテル・ハフツング Fluid control device in rolling mill structure

Also Published As

Publication number Publication date
CN109530445B (en) 2023-03-24

Similar Documents

Publication Publication Date Title
CN103132458A (en) Overall installation method of double-body separable combined beam
CN105970819A (en) Installation construction method for steel anchor beams
CN104453248A (en) Complex irregular-shaped multi-layer net rack construction method based on layered modular assembling technology
CN101759098B (en) Crane beam frame construction method
CN105666079A (en) In-hole disassembly/assembly device and method of spiral conveyor of shield tunneling machine
CN107152078A (en) Articulated mounting and the construction method that steel vestibule welding interior stress is discharged using it
CN103967284B (en) The steel column installation method of reserved stigma docking
CN103173582A (en) Method for integral in-position mounting of blast-furnace five-way ball and eduction tubes thereof aloft
CN109530445A (en) A kind of mill housing top platform modularization method for rapidly mounting
CN106836836A (en) A kind of Flue Gas Desulphurization for Coal-burning Power Plant tower transforms secondary hydraulic lifting installation method
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN102720371B (en) Butt joint method for multiple upright posts of steel structure module and temporary butt joint fixing device
CN205393933U (en) Shield constructs dismouting device in quick -witted screw conveyer hole
CN105501391B (en) A kind of all-direction propeller is installed to the installation method of bottom of ship from building berth
CN105834272A (en) Method for mounting large aluminum plate drawing mill equipment in confined space
CN104329562B (en) A kind of movable hydraulic substation car
CN204038992U (en) A kind of erecting stage for subway busbar
CN112152130B (en) Construction method for quickly dismantling transformer directly connected with GIS equipment
CN204703530U (en) For the thrustor of Construction of Steel Structure
CN106286200A (en) Split type vacuum pump and installation method thereof
CN208327150U (en) New engineering machinery repairs platform
CN103148912A (en) Mounting bracket for mounting non-contact water level monitoring equipment
CN106903185A (en) The online method for rapidly mounting of Wide and Thick Slab plate-straightening machine
CN208194500U (en) Large-scale mobile building stones are crushed module device
CN204531100U (en) Adjustable curtain-wall grid system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant