CN202265307U - Hoisting device for reinforced concrete rebated pipe with large pipe diameter - Google Patents
Hoisting device for reinforced concrete rebated pipe with large pipe diameter Download PDFInfo
- Publication number
- CN202265307U CN202265307U CN2011203454173U CN201120345417U CN202265307U CN 202265307 U CN202265307 U CN 202265307U CN 2011203454173 U CN2011203454173 U CN 2011203454173U CN 201120345417 U CN201120345417 U CN 201120345417U CN 202265307 U CN202265307 U CN 202265307U
- Authority
- CN
- China
- Prior art keywords
- pipe
- ferro
- hanging piece
- hole
- rod iron
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to the technical field of building construction equipment and discloses a hoisting device for a reinforced concrete rebated pipe with large pipe diameter. The hoisting device comprises a reinforced concrete rebated pipe body. A hoisting hole is arranged in the middle of the reinforced concrete rebated pipe body, a steel stick hanging piece is cup jointed with the hoisting hole, the steel stick hanging piece is provided with an end cap and connected with a steel cable, and the steel cable is further connected with a steel hook. The hoisting device is fast in hoisting speed, precise in butt joint of pipe mouths, good in installing quality of hoisting and high in safety.
Description
Technical field
The utility model relates to the technical field of construction implement device.
Background technology
Chinese invention patent number: 92111998.4 disclose a kind of straight, the arc of straight, arc, garden tubular masonry, complete unit of automatic building block of group's cartridge type kind of being suitable for of a kind of lifting of cement concrete product, are made up of the cooperation facility of whole machine of building block and masonry; The whole machine of building block comprises list, controls cement laying machine more, and the building block machine goes up and down, moves machine; Fixing upright body; The fixing upright body that moves, the cross moving member that moves in length and breadth, piston-type switch flattens part; Connect part, it is characterized in that being fit to fix the disintegration of the solid of mobile operation position, the automatic operation of moving, going up and down and the right due limit working space of masonry, angle, mobile, the moving coordinating operation of up-down card; Complete unit of automatic building block of the present invention and operational method are suitable for and plaster, the operation or the making of briquetting (original name: sticking face or paste block) cement concrete product.
Generally adopt rope to reveal all the details when the hanging apparatus of prior art lifts and equal the method for hanging, both dangerous concerning lifting is installed, and also speed is docked than the ferro-concrete mouth of pipe in slow and the installation process, and difficulty is big, mouth of pipe butt joint is tight inadequately; The installation rear steel rope is difficult to take out.
The utility model content
The utility model purpose aims to provide a kind of hanging apparatus of big caliber ferro-concrete tongue and groove pipe.This hanging apparatus lifting speed is fast, and mouth of pipe butt joint is tighter, and the installation quality of lifting is good, and safety is higher.
For realizing above-mentioned purpose; The technical scheme that the utility model adopts is: a kind of hanging apparatus of big caliber ferro-concrete tongue and groove pipe, comprise ferro-concrete tongue and groove tube body, and be provided with hole for hoist in the middle of the said ferro-concrete tongue and groove tube body; Said hole for hoist is socketed with the rod iron hanging piece; Said rod iron hanging piece is equipped with plug, and said rod iron hanging piece is connected with steel cable, and said steel cable also is connected with the steel hook.
The hanging apparatus of said a kind of big caliber ferro-concrete tongue and groove pipe, the diameter of its rod iron hanging piece is littler than the diameter of hole for hoist.
The hanging apparatus of said a kind of big caliber ferro-concrete tongue and groove pipe, the diameter of its rod iron hanging piece is than the little 5-8 millimeter of diameter of hole for hoist.
The hanging apparatus of said a kind of big caliber ferro-concrete tongue and groove pipe, its plug diameter is greater than rod iron hanging piece diameter.
The hanging apparatus of said a kind of big caliber ferro-concrete tongue and groove pipe, the length of its rod iron hanging piece is than the long 50-100 millimeter of the degree of depth of hole for hoist.
The required machinery of hanging apparatus of this big caliber ferro-concrete tongue and groove pipe is that conventional mechanical, operating procedure are easy.This hanging apparatus lifting speed is fast, and mouth of pipe butt joint is tighter, and the installation quality of lifting is good, and safety is higher.Be provided with hole for hoist in the middle of the ferro-concrete tongue and groove pipe, effectively improved hoisted in position precision and safety, have advantages such as installation rate is fast, the duration short, concrete pipe is not fragile, installation quality is good, interface is tight.
Description of drawings
Scheme drawing in Fig. 1 the utility model specific embodiment;
Cutaway view in Fig. 2 the utility model specific embodiment.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is further described.
As depicted in figs. 1 and 2: a kind of hanging apparatus of big caliber ferro-concrete tongue and groove pipe; Comprise ferro-concrete tongue and groove tube body 1, hole for hoist 2, rod iron hanging piece 3, steel cable 4, steel hook 5, plug 6; Be provided with hole for hoist 2 in the middle of the said ferro-concrete tongue and groove tube body 1, said hole for hoist 2 is socketed with rod iron hanging piece 3, and said rod iron hanging piece 3 is equipped with plug 6; Said rod iron hanging piece 3 is connected with steel cable 4, and said steel cable 4 also is connected with steel hook 5.1 liang of middle side part of ferro-concrete tongue and groove tube body is arranged with hole for hoist 2, and hole for hoist 2 is buried conduit underground.Insert hole for hoist 2 with rod iron hanging piece 3 during lifting; Rod iron hanging piece 3 outer ends are provided with plug 6; Avoid lifting steel cable and skid off, hook with steel hook 5 the pipe shaft termination, forms the triangle knot hook of a balance and stability; Make the hanging apparatus of this big caliber ferro-concrete tongue and groove pipe effectively improve hoisted in position precision and safety like this, have advantages such as installation rate is fast, the duration short, concrete pipe is not fragile, installation quality is good, interface is tight.
A kind of hanging apparatus of big caliber ferro-concrete tongue and groove pipe; Comprise ferro-concrete tongue and groove tube body 1, hole for hoist 2, rod iron hanging piece 3, steel cable 4, steel hook 5, plug 6; Be provided with hole for hoist 2 in the middle of the said ferro-concrete tongue and groove tube body 1, said hole for hoist 2 is socketed with rod iron hanging piece 3, and said rod iron hanging piece 3 is equipped with plug 6; Said rod iron hanging piece 3 is connected with steel cable 4, and said steel cable 4 also is connected with steel hook 5.Wherein the diameter of rod iron hanging piece 3 is littler than the diameter of hole for hoist 2.The diameter of its rod iron hanging piece 3 is than the little 5-8 millimeter of diameter of hole for hoist 2.Its plug 6 diameters are greater than rod iron hanging piece 3 diameters.The length of its rod iron hanging piece 3 is than the long 50-100 millimeter of the degree of depth of hole for hoist 2.1 liang of middle side part of ferro-concrete tongue and groove tube body is arranged with hole for hoist 2, and hole for hoist 2 is buried conduit underground.Insert hole for hoist 2 with rod iron hanging piece 3 during lifting; Rod iron hanging piece 3 outer ends are provided with plug 6; Avoid lifting steel cable and skid off, hook with steel hook 5 the pipe shaft termination, forms the triangle knot hook of a balance and stability; Make the hanging apparatus of this big caliber ferro-concrete tongue and groove pipe effectively improve hoisted in position precision and safety like this, have advantages such as installation rate is fast, the duration short, concrete pipe is not fragile, installation quality is good, interface is tight.
Claims (5)
1. the hanging apparatus of one kind big caliber ferro-concrete tongue and groove pipe; Comprise ferro-concrete tongue and groove tube body, it is characterized in that, be provided with hole for hoist in the middle of the said ferro-concrete tongue and groove tube body; Said hole for hoist is socketed with the rod iron hanging piece; Said rod iron hanging piece is equipped with plug, and said rod iron hanging piece is connected with steel cable, and said steel cable also is connected with the steel hook.
2. according to the hanging apparatus of the said a kind of big caliber ferro-concrete tongue and groove pipe of claim 1, it is characterized in that the diameter of said rod iron hanging piece is littler than the diameter of hole for hoist.
3. according to the hanging apparatus of the said a kind of big caliber ferro-concrete tongue and groove pipe of claim 2, it is characterized in that the diameter of said rod iron hanging piece is than the little 5-8 millimeter of diameter of hole for hoist.
4. according to the hanging apparatus of the said a kind of big caliber ferro-concrete tongue and groove pipe of claim 1, it is characterized in that said plug diameter is greater than rod iron hanging piece diameter.
5. according to the hanging apparatus of the said a kind of big caliber ferro-concrete tongue and groove pipe of claim 1, it is characterized in that the length of said rod iron hanging piece is than the long 50-100 millimeter of the degree of depth of hole for hoist.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203454173U CN202265307U (en) | 2011-09-15 | 2011-09-15 | Hoisting device for reinforced concrete rebated pipe with large pipe diameter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203454173U CN202265307U (en) | 2011-09-15 | 2011-09-15 | Hoisting device for reinforced concrete rebated pipe with large pipe diameter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202265307U true CN202265307U (en) | 2012-06-06 |
Family
ID=46156115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203454173U Expired - Fee Related CN202265307U (en) | 2011-09-15 | 2011-09-15 | Hoisting device for reinforced concrete rebated pipe with large pipe diameter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202265307U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485410A (en) * | 2012-06-14 | 2014-01-01 | 中冶天工集团有限公司 | Installation and construction method for super-large-diameter reinforced concrete rebated pipe |
-
2011
- 2011-09-15 CN CN2011203454173U patent/CN202265307U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485410A (en) * | 2012-06-14 | 2014-01-01 | 中冶天工集团有限公司 | Installation and construction method for super-large-diameter reinforced concrete rebated pipe |
CN103485410B (en) * | 2012-06-14 | 2015-05-13 | 中冶天工集团有限公司 | Installation and construction method for super-large-diameter reinforced concrete rebated pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202265307U (en) | Hoisting device for reinforced concrete rebated pipe with large pipe diameter | |
CN203452084U (en) | Sleeve type bottom-conveying rear grouting device for later-inserted pipe | |
CN208844565U (en) | One kind cutting pile section point structure | |
CN201627200U (en) | Blockage-slurry strengthening earth anchor | |
CN201292853Y (en) | Pulp stopping plug for cable | |
CN110158588B (en) | Internal inclined root key type anchor cable and grouting method for anchor holes | |
CN113529724B (en) | Foundation pit concrete pouring construction method | |
CN204139627U (en) | The anti-wear cover cage of wire rope | |
CN201095831Y (en) | Beam-splitting U shaped prestressing force anchorage cable | |
CN207621485U (en) | A kind of prestressed concrete pipe mounting device | |
CN215715279U (en) | Pile head breaking device for concrete cast-in-place pile | |
CN204780928U (en) | Major diameter bored concrete pile concrete first set groundwater increment controlling means | |
CN203947478U (en) | A kind of novel pile tube pile follower equipment | |
CN203924070U (en) | Intubate grouting pile device after drilling & grouting piling concrete | |
CN204941343U (en) | The vertical anchor rod drilling device in tunnel | |
CN210767793U (en) | Detachable pre-embedded structure for fixing safety rope | |
CN202039373U (en) | Anchor rope hauling-down device | |
CN207524571U (en) | A kind of metallurgy automatic feeding device | |
CN210566650U (en) | Pipe pulling device for quick installation of pipeline | |
CN214993874U (en) | Pile foundation is complementary unit for grout | |
CN203960872U (en) | Pre-manufactured steel cage guiding embedding series of rocks system | |
CN204510845U (en) | A kind of hydraulically extensible tubular type masonry wall construction guiding device | |
CN205189418U (en) | Device is pour fast to constructional column | |
CN205906922U (en) | Pipeline drawing of patterns gallows | |
CN202595749U (en) | Underwater concrete elevation controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120606 Termination date: 20150915 |
|
EXPY | Termination of patent right or utility model |