CN203452084U - Sleeve type bottom-conveying rear grouting device for later-inserted pipe - Google Patents
Sleeve type bottom-conveying rear grouting device for later-inserted pipe Download PDFInfo
- Publication number
- CN203452084U CN203452084U CN201320537085.8U CN201320537085U CN203452084U CN 203452084 U CN203452084 U CN 203452084U CN 201320537085 U CN201320537085 U CN 201320537085U CN 203452084 U CN203452084 U CN 203452084U
- Authority
- CN
- China
- Prior art keywords
- grouting
- pipe
- grouting pipe
- later
- steel sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 27
- 239000010959 steel Substances 0.000 claims abstract description 27
- 238000007569 slipcasting Methods 0.000 claims description 12
- 239000000203 mixture Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 5
- 239000004568 cement Substances 0.000 abstract description 4
- 238000003825 pressing Methods 0.000 abstract description 3
- 230000007547 defect Effects 0.000 abstract description 2
- 230000003014 reinforcing effect Effects 0.000 description 10
- 239000000463 material Substances 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 238000000280 densification Methods 0.000 description 2
- 125000006850 spacer group Chemical group 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 208000034189 Sclerosis Diseases 0.000 description 1
- 239000002390 adhesive tape Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a sleeve type bottom-conveying rear grouting device for a later-inserted pipe. Due to the fact that the construction process of a grouting pile adopted in existing construction has the defects of being limited, unreasonable in firmness, tedious and complex, pressing and grouting are carried out by a steel pipe which is inserted later on cement paste immediately on the situation that pressing and grouting of concrete are accomplished, and the concrete is in a flowing state, the concrete cannot achieve final setting hardening, and cannot constrain the pressure cement paste, and the effect for improving the bearing capacity of a single pile is not obvious. The sleeve type bottom-conveying rear grouting device for the later-inserted pipe comprises a grouting pipe (1), wherein the grouting pipe is installed in a tool type steel sleeve (2), a vibrating tamper (3) and a grouting pipe guiding head (4) are connected with the two ends of the tool type steel sleeve respectively, the other end of the vibrating tamper is connected with a lifting steel wire rope (5), the tool type steel sleeve is provided with a lifting grouting pipe opening (6), and the grouting pipe is provided with a grouting hole (7). The sleeve type bottom-conveying rear grouting device for the later-inserted pipe is applied to construction.
Description
technical field:
the utility model send rear intubate post-grouting device at the bottom of relating to a kind of bushing type.
background technology:
construction market a kind of technique used is < < auger stem center pump-injecting concrete pile-forming after-inserted pipe grouting device > > at present, this installs existent defect, after the steel pipe that inserts be immediately to carry out grouting methol pressing to have filled with under the mobile state of concrete, because concrete reaches final set sclerosis, press water mud is not had to restraint forces, to pile body, the densification completely of the stake end soil body, so to improving bearing capacity of single pile DeGrain.
another < < long auger presses filling stake grouting behind shaft or drift lining processing method and rearmounted Grouting Pipe device > > thereof to have several shortcomings to be: 1, limitation: described in the method claim 1 step 1: this postposition Grouting Pipe device and reinforcing cage link into an integrated entity, Grouting Pipe material requirements must be steel pipe, and slip casting steel pipe must be tied up, be welded on reinforcing cage, the length of current specifications regulation reinforcing cage is that stake is long by 2/3rds, Grouting Pipe just grows 1/3rd than reinforcing cage, increased span (L) value moment of flexure also strengthens thereupon, when lifting, slip casting steel pipe insufficient rigidity causes bending, there is no operability, if be equipped with crane, can increase considerably irrational cost.2, irrational fastness: described in the method right 7,10: taper pocketed thing is drawn and welded in above-mentioned pile grouting pipe and stake side Grouting Pipe and the colligation of spacer bars circle or the reinforcing cage lower end in welding and reinforcing cage garden week in to center of circle bending.Due at the bottom of Grouting Pipe needs dynamic driving to arrive, need enough rigidity and fastnesses to realize, the measure that employing is welded on reinforcing cage solves, also set up pocketed reinforcing bar material reinforcement of weld, solve a problem for stake bottom 1/3rd insufficient rigidity, irrational increased welding material, artificial, equipment, etc. cost.Attached workload is greater than groundwork amount.3, triviality: described in the method claim 5: this device comprises and be placed in pile body ring week at least, two pile grouting pipes, at least one pile side Grouting Pipe are welded on spacer bars circle and reveal all the details on reinforcing bar.Due to the unreasonable reinforcement cost that increased of slip casting penstock installation method, drilling & grouting piling concrete pile can construction diameter generally in 800mm, conventionally adopt a Grouting Pipe just can meet the demands, steel pipe of this invention cannot be located and be laid, so in order to meet smooth Laying injection pipe requirement, designed two slip casting steel pipes.Caused the upper irrationality of design and wasted.4, complexity: described in the method claim 1 step 7: cement paste is to go out from slip casting one way valve, in engineering practice, do not use one-way cock, in practice, practical operation is after the boring of Grouting Pipe bottom, directly with adhesive tape, just wraps and can meet slip casting requirement.
summary of the invention:
the purpose of this utility model is sent rear intubate post-grouting device at the bottom of being to provide a kind of bushing type.
above-mentioned object realizes by following technical scheme:
at the bottom of a kind of bushing type, send rear intubate post-grouting device, its composition comprises: Grouting Pipe, described Grouting Pipe is arranged in tool-type steel sleeve, and described tool-type steel sleeve two ends connect respectively vibrator and Grouting Pipe guide head, and the described vibrator other end connects lifting wire rope; Described tool-type steel sleeve has the slip casting of the hanging mouth of pipe, and described Grouting Pipe has injected hole.
at the bottom of described bushing type, send rear intubate post-grouting device, hang Grouting Pipe wire rope by hanging the slip casting mouth of pipe and connecting described Grouting Pipe on described tool-type steel sleeve.
the beneficial effects of the utility model:
1. the utility model send rear intubate post-grouting device device at the bottom of providing a kind of bushing type, can solve at concrete and flow under state, insert Grouting Pipe the instant cement injection densification soil body, to improving the unconspicuous problem of single pile bearing capacity, in short cast-with-pressure concrete pile during Laying injection pipe, both can adopt manpower also can adopt other auxiliary strength that Grouting Pipe is directly installed, have advantages of that work progress is easy, and that whole device also has cost is low, lay conveniently, manufacturing process is simple, reliable in quality, Grouting Pipe material has multiple choices, with low cost, increase social benefit, be convenient to the advantage of promoting.
the utility model is that Grouting Pipe is enclosed within after sending into design soil layer in tool-type steel sleeve and extracts steel sleeve; it is whole that to send into process direct; the speed of sending into is separately fast; and there is the protection of tool-type steel sleeve Grouting Pipe outside; tool-type steel sleeve can be reused, and operation independent operation does not relate to the reinforcement cost problem of reinforcing cage.
accompanying drawing explanation:
accompanying drawing 1 is structural representation of the present utility model.
the specific embodiment:
embodiment 1:
at the bottom of a kind of bushing type, send rear intubate post-grouting device, its composition comprises: Grouting Pipe 1, described Grouting Pipe is arranged in tool-type steel sleeve 2, and described tool-type steel sleeve two ends connect respectively vibrator 3 and Grouting Pipe guide head 4, and the described vibrator other end connects lifting wire rope 5; Described tool-type steel sleeve has the slip casting of the hanging mouth of pipe 6, and described Grouting Pipe has injected hole 7.
embodiment 2:
at the bottom of bushing type described in embodiment 1, send rear intubate post-grouting device, hang Grouting Pipe wire rope 8 by hanging the slip casting mouth of pipe and connecting described Grouting Pipe on described tool-type steel sleeve.
Claims (2)
1. at the bottom of a bushing type, send rear intubate post-grouting device, its composition comprises: Grouting Pipe, it is characterized in that: described Grouting Pipe is arranged in tool-type steel sleeve, described tool-type steel sleeve two ends connect respectively vibrator and Grouting Pipe guide head, and the described vibrator other end connects lifting wire rope; Described tool-type steel sleeve has the slip casting of the hanging mouth of pipe, and described Grouting Pipe has injected hole.
2. at the bottom of bushing type according to claim 1, send rear intubate post-grouting device, it is characterized in that: hang Grouting Pipe wire rope by hanging the slip casting mouth of pipe and connecting described Grouting Pipe on described tool-type steel sleeve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320537085.8U CN203452084U (en) | 2013-08-31 | 2013-08-31 | Sleeve type bottom-conveying rear grouting device for later-inserted pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320537085.8U CN203452084U (en) | 2013-08-31 | 2013-08-31 | Sleeve type bottom-conveying rear grouting device for later-inserted pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203452084U true CN203452084U (en) | 2014-02-26 |
Family
ID=50131975
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320537085.8U Expired - Fee Related CN203452084U (en) | 2013-08-31 | 2013-08-31 | Sleeve type bottom-conveying rear grouting device for later-inserted pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203452084U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103452115A (en) * | 2013-08-31 | 2013-12-18 | 曹兴明 | Casing pipe type bottom feeding post-pipe-plugging and post-grouting device and construction method |
CN103603679A (en) * | 2013-09-17 | 2014-02-26 | 中国神华能源股份有限公司 | Vault steel frame for support tunnel arch and tunnel construction method |
CN104314515A (en) * | 2014-10-23 | 2015-01-28 | 神华集团有限责任公司 | Method and device for sealing coal mine drilled hole |
CN113863330A (en) * | 2021-12-02 | 2021-12-31 | 中建八局第二建设有限公司 | Ultra-deep foundation pit narrow fertilizer groove concrete backfill structure and construction method |
CN115012288A (en) * | 2022-07-08 | 2022-09-06 | 杨夏青 | Highway subgrade maintenance road surface cementation of fissures device |
-
2013
- 2013-08-31 CN CN201320537085.8U patent/CN203452084U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103452115A (en) * | 2013-08-31 | 2013-12-18 | 曹兴明 | Casing pipe type bottom feeding post-pipe-plugging and post-grouting device and construction method |
CN103452115B (en) * | 2013-08-31 | 2016-06-22 | 曹兴明 | A kind of utilize send at the bottom of bushing type after intubate the construction method that post-grouting device carries out constructing |
CN103603679A (en) * | 2013-09-17 | 2014-02-26 | 中国神华能源股份有限公司 | Vault steel frame for support tunnel arch and tunnel construction method |
CN103603679B (en) * | 2013-09-17 | 2015-08-12 | 中国神华能源股份有限公司 | For arch crown steel frame and the method for tunnel construction of arch, supporting tunnel |
CN104314515A (en) * | 2014-10-23 | 2015-01-28 | 神华集团有限责任公司 | Method and device for sealing coal mine drilled hole |
CN113863330A (en) * | 2021-12-02 | 2021-12-31 | 中建八局第二建设有限公司 | Ultra-deep foundation pit narrow fertilizer groove concrete backfill structure and construction method |
CN113863330B (en) * | 2021-12-02 | 2022-02-22 | 中建八局第二建设有限公司 | Ultra-deep foundation pit narrow fertilizer groove concrete backfill structure and construction method |
CN115012288A (en) * | 2022-07-08 | 2022-09-06 | 杨夏青 | Highway subgrade maintenance road surface cementation of fissures device |
CN115012288B (en) * | 2022-07-08 | 2024-05-03 | 杨夏青 | Highway subgrade maintenance road surface cementation of fissures device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203452084U (en) | Sleeve type bottom-conveying rear grouting device for later-inserted pipe | |
CN101319498B (en) | Lattice type prefabricated prestressed underground continuous wall and its construction method | |
CN103452115B (en) | A kind of utilize send at the bottom of bushing type after intubate the construction method that post-grouting device carries out constructing | |
CN109837895A (en) | A kind of big pressure dispersing anchorage cable construction of depth | |
CN207567836U (en) | Compression test stake ess-strain comprehensive detection system | |
CN201770981U (en) | Tube-side injection grouting apparatus for simultaneous drilling pipe pile | |
CN102808422A (en) | Bonded post-tensioned prestressed construction method for cast-in-place reinforced concrete structure | |
CN102644284A (en) | Method and device for post grouting in pile bottom | |
CN106939791A (en) | One kind can prestress steel structure concrete pipe sheet and its construction method | |
CN102808414A (en) | Bonded post-tensioned prestressed anchoring construction method for cast-in-place concrete structure | |
CN103410144B (en) | Prestressed reinforcement piles set into rock and construction method | |
CN103572760B (en) | Bored grouting pile whole pile length vibrating construction method and device | |
CN111535302A (en) | Cast-in-place pile distributed pile side-rear grouting device, hydraulic grouting assembly and construction method | |
CN208563315U (en) | A kind of pile foundation grouting behind shaft or drift lining constructing device | |
CN104911999B (en) | Buried anchor construction method | |
CN204491617U (en) | A kind of static pressure or hammering concrete precast pipe pile pile bottom post-grouting device | |
CN203440820U (en) | Improved pouring pile end post-grouting device | |
CN203270584U (en) | One-way intercepting grouting head for grouting | |
CN203924070U (en) | Intubate grouting pile device after drilling & grouting piling concrete | |
CN206636571U (en) | One kind can prestress steel structure concrete pipe sheet | |
CN202577307U (en) | Post grouting device of pile foundation | |
CN114411700A (en) | Steel pile body for steel pipe grouting pile construction while sinking pipe and grouting | |
CN207062943U (en) | For slip casting structure outside the stake of steel-pipe pile | |
CN109403328B (en) | Perforated pipe grouting assembly and construction method | |
CN114525781A (en) | Prestressed rod core bag grouting combined anti-floating component and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160218 Address after: 150000 Xiangfang City, Heilongjiang province (formerly Power District) Chaoyang town Ping'an Village Patentee after: HEILONGJIANG HUAYAN PILING TECHNOLOGY R & D Co.,Ltd. Address before: 150046, No. 73-3, Heung Men street, Xiangfang District, Heilongjiang, Harbin Patentee before: Cao Xingming |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140226 |