CN202595749U CN 201220159478 CN201220159478U CN202595749U CN 202595749 U CN202595749 U CN 202595749U CN 201220159478 CN201220159478 CN 201220159478 CN 201220159478 U CN201220159478 U CN 201220159478U CN 202595749 U CN202595749 U CN 202595749U
Authority
CN
China
Prior art keywords
main body
underwater concrete
concrete
absolute altitude
underwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220159478
Other languages
Chinese (zh)
Inventor
陈政民
金炯球
谢远彬
汪火旺
甘展致
肖光业
汪卫文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG GEOLOGICAL ENGINEERING Co Ltd
Original Assignee
GUANGDONG GEOLOGICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG GEOLOGICAL ENGINEERING Co Ltd filed Critical GUANGDONG GEOLOGICAL ENGINEERING Co Ltd
Priority to CN 201220159478 priority Critical patent/CN202595749U/en
Application granted granted Critical
Publication of CN202595749U publication Critical patent/CN202595749U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The utility model discloses an underwater concrete elevation controller, comprising a main body, wherein a plurality of sampling hoppers of which openings are upward are arranged on the main body. With the adoption of the underwater concrete elevation controller, the sampling hoppers are arranged on the main body; in such a way, after underwater concrete is completely poured for one time, a vertical hole is processed in a concrete body; next, the underwater concrete elevation controller is inserted into the hole and then taken out; at the moment, the sampling hoppers can bring out concrete samples at the corresponding depths respectively; and through the analysis about each sample, the pouring depth and the condensation degree of the existing concrete can be known, so that the elevation is controlled easily. The underwater concrete elevation controller is simple in structure, convenient to operate and correct to sample, and can be widely applied to the pouring of the underwater concrete.

Description

Underwater concrete absolute altitude controller
Technical field
The utility model relates to the auxiliary equipment of using in a kind of bored concrete pile foundation engineering.
Background technology
Along with development of city, the application of the underground space more and more widely, the operation of the underwater concrete perfusion simultaneously hollow stake degree of depth is also more and more darker.When concrete spouting was carried out in these deep empty stakes, grout pile top mark height often was difficult to control, and sometimes ultra concrete placing sometimes pours into less than intrinsic stake top mark high again.So, just have to carry out the operation of remedying in later stage, delayed the duration greatly, wasted cost of production again.Way commonly used is to multiply by certain coefficient again through theory of computation groundwater increment to confirm actual concrete spouting amount.But in the real work, tend to that to cause pouring into error bigger owing to factors such as construction technology, stratum differences, perfusion absolute altitude control effect is unsatisfactory.
The utility model content
The purpose of the utility model, thus be to provide a kind of underwater concrete absolute altitude controller that can accurately know the situation of the building control concrete absolute altitude of underwater concrete.
The solution that the utility model solves its technical problem is:
Underwater concrete absolute altitude controller comprises a main body, and said main body is provided with several openings sampling peck up.
As the further improvement of technique scheme, said main body distributes along the bearing of trend of main body for long straight shape member, sampling peck.
As the further improvement of technique scheme, said main body is the steel member, and sampling peck and main body are fixedly connected.
As the further improvement of technique scheme, the lower end of said main body is taper, and the end of this taper lower end is sharp comer or fillet.
As the further improvement of technique scheme, the upper end of said main body connects with a cable.
Perhaps, as the another kind improvement of technique scheme, the upper end of said main body connects with a montant.
The beneficial effect of the utility model is: the utility model is provided with sampling peck on main body; After finishing underwater concreting, on the concrete body, process vertical hole like this, the utility model is inserted in the hole reintroduces then; Sampling peck promptly can be taken the concrete sample of the corresponding degree of depth out of; Through analyzing each sample, just can know the current concrete cast degree of depth and condense degree, thereby control absolute altitude like a cork.The utility model is simple in structure, and is easy and simple to handle, and sampling accurately can be widely used in the underwater concreting operation.
Description of drawings
In order to be illustrated more clearly in the technical scheme among the utility model embodiment, the accompanying drawing of required use is done simple declaration in will describing embodiment below.Obviously, described accompanying drawing is a part of embodiment of the utility model, rather than whole embodiment, and those skilled in the art can also obtain other design schemes and accompanying drawing according to these accompanying drawings under the prerequisite of not paying creative work.
Fig. 1 is first kind of embodiment structural representation of the utility model;
Fig. 2 is second kind of embodiment structural representation of the utility model.
The specific embodiment
Below will combine embodiment and accompanying drawing that the technique effect of design, concrete structure and the generation of the utility model is carried out clear, intactly description, with purpose, characteristic and the effect of understanding the utility model fully.Obviously; Described embodiment is a part of embodiment of the utility model, rather than whole embodiment, based on the embodiment of the utility model; Other embodiment that those skilled in the art is obtained under the prerequisite of not paying creative work all belong to the scope that the utility model is protected.In addition, all connection/annexations of being mentioned in the literary composition are not to refer to that singly member directly joins, and are meant and can connect auxiliary through adding or reducing according to the practical implementation situation, form more excellent draw bail.
First kind of embodiment:
With reference to Fig. 1, underwater concrete absolute altitude controller comprises a main body 1, and said main body 1 is provided with several openings sampling peck 2 up.
Further as preferred embodiment, said main body 1 distributes along the bearing of trend of main body for long straight shape member, sampling peck 2.
Further as preferred embodiment, said main body 1 is the steel member, and sampling peck 2 is fixedly connected with main body 1.Particularly, said sampling peck 2 can adopt plastic rigid pipe to make, and main body 1 can adopt straight steel pipe or other long straight steel parts to make.With reference to Fig. 1, at the circumferential periphery of main body 1, mouth of pipe plastic rigid pipe section up just is set at a distance from a segment distance, the outer wall of pipe arcuation helps reducing the resistance of main body 1 tenesmus.In addition,, can on main body 1, process a pit mouth position earlier, and then will get hopper 2 and fixedly get on, reduce the vertical direction projected area of main body 1 as far as possible, also help the decline of main body 1 as finer manufacturing process.
Further as preferred embodiment, the lower end of said main body 1 is taper, and the end of this taper lower end is sharp comer or fillet.That is to say that sharp end can be processed in the lower end of main body 1, perhaps this sharp end being polished makes its rust slightly again, and the lower end of taper helps lowering concrete resistance.
Further as preferred embodiment, the upper end of said main body 1 connects with a cable 3.
Second kind of embodiment:
With reference to Fig. 2, the structure of all sites of underwater concrete absolute altitude controller is described identical with first kind of embodiment, but in the end, the upper end of said main body 1 is not to connect with cable 3, but connects with a montant 4.Cable 3 is in order to prolong the available depth of the utility model, lets the main body 1 darker place that can drop, and mostly it is to be applied in transfers the degree of depth darker the time, and if the below degree of depth is more shallow, then can adopt the connecting mode of above-mentioned montant 4.Certainly, the material of cable 3 may not be a fiber, can also be that the flexibility of one type of steel cable connects thing.
More than be that preferred embodiments to the utility model specifies; But the invention is not limited to said embodiment; Those of ordinary skill in the art also can make all equivalent modifications or replacement under the prerequisite of the utility model spirit, modification that these are equal to or replacement all are included in the application's claim institute restricted portion.

Claims (6)

1. underwater concrete absolute altitude controller, it is characterized in that: comprise a main body (1), said main body (1) is provided with several openings sampling peck (2) up.
2. underwater concrete absolute altitude controller according to claim 1 is characterized in that: said main body (1) distributes along the bearing of trend of main body for long straight shape member, sampling peck (2).
3. underwater concrete absolute altitude controller according to claim 2 is characterized in that: said main body (1) is the steel member, and sampling peck (2) is fixedly connected with main body (1).
4. underwater concrete absolute altitude controller according to claim 3 is characterized in that: the lower end of said main body (1) is taper, and the end of this taper lower end is sharp comer or fillet.
5. underwater concrete absolute altitude controller according to claim 1 is characterized in that: the upper end of said main body (1) connects with a cable (3).
6. underwater concrete absolute altitude controller according to claim 1 is characterized in that: the upper end of said main body (1) connects with a montant (4).
CN 201220159478 2012-04-16 2012-04-16 Underwater concrete elevation controller Expired - Fee Related CN202595749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220159478 CN202595749U (en) 2012-04-16 2012-04-16 Underwater concrete elevation controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220159478 CN202595749U (en) 2012-04-16 2012-04-16 Underwater concrete elevation controller

Publications (1)

Publication Number Publication Date
CN202595749U true CN202595749U (en) 2012-12-12

Family

ID=47313299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220159478 Expired - Fee Related CN202595749U (en) 2012-04-16 2012-04-16 Underwater concrete elevation controller

Country Status (1)

Country Link
CN (1) CN202595749U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644283A (en) * 2012-04-16 2012-08-22 广东省地质工程公司 Underwater concrete elevation controller

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102644283A (en) * 2012-04-16 2012-08-22 广东省地质工程公司 Underwater concrete elevation controller
CN102644283B (en) * 2012-04-16 2015-03-25 广东省地质工程公司 Underwater concrete elevation controller

Similar Documents

Publication Publication Date Title
CN205246388U (en) Mud sampling equipment
CN109208921A (en) The localization method of building element assembled sleeve embedded bar
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN210858067U (en) Assembled wall reserved steel bar positioning tool
CN201367588Y (en) Underwater concrete sampler
CN202595749U (en) Underwater concrete elevation controller
CN201538969U (en) Precast concrete board forming die
CN101250870B (en) Positioning device for filling pile reinforcement cage
CN202280152U (en) Structure for arranging embedded part at bottom of reinforced concrete plate
CN207685818U (en) It is a kind of it is repeatable utilize lead wall device
CN201236340Y (en) Novel tool type hanging steel bar
CN102644283A (en) Underwater concrete elevation controller
CN102704478A (en) Building anchor rod construction technology
CN204780928U (en) Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN204385780U (en) A kind of ultra-deep slurry drilled pile pile head elevation control device
CN202039379U (en) Automatic positioning device for installing steel pipe column in covering and excavation top-down-method (CCTDM) construction
CN108396734A (en) A kind of device of control Punching Borehole Cast-in-place Concrete Pile stake top concrete casting elevation
CN208346808U (en) A kind of device controlling Punching Borehole Cast-in-place Concrete Pile stake top concrete casting elevation
CN204001214U (en) High accuracy capital embedded board
CN203755682U (en) Secondary pouring form board constructing structure for small opening of concrete structure floor slab
CN202610796U (en) Concrete limit block for positioning reinforcement cage of underground continuous wall
CN202247856U (en) Earth borrowing annular pile for foundation treatment and underground foundation
CN208072393U (en) A kind of pile pile of the built-in slip casting pipe with piecing devices
CN106906751B (en) Especially big Cable stayed Bridge Main Tower segmental arc vertical prestressing construction method
CN205875750U (en) T style of calligraphy harrow

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Chen Zhengmin

Inventor after: Jin Jiongqiu

Inventor after: Xie Yuanbin

Inventor after: Wang Huowang

Inventor after: Gan Zhanzi

Inventor after: Xiao Guangye

Inventor after: Jiang Weiwen

Inventor before: Chen Zhengmin

Inventor before: Jin Jiongqiu

Inventor before: Xie Yuanbin

Inventor before: Wang Huowang

Inventor before: Gan Zhanzhi

Inventor before: Xiao Guangye

Inventor before: Wang Weiwen

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHEN ZHENGMIN JIN JIONGQIU XIE YUANBIN WANG HUOWANG GAN ZHANZHI XIAO GUANGYE WANG WEIWEN TO: CHEN ZHENGMIN JIN JIONGQIU XIE YUANBIN WANG HUOWANG GAN ZHANZI XIAO GUANGYE JIANG WEIWEN

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121212

Termination date: 20210416