CN205246388U - Mud sampling equipment - Google Patents

Mud sampling equipment Download PDF

Info

Publication number
CN205246388U
CN205246388U CN201521087967.4U CN201521087967U CN205246388U CN 205246388 U CN205246388 U CN 205246388U CN 201521087967 U CN201521087967 U CN 201521087967U CN 205246388 U CN205246388 U CN 205246388U
Authority
CN
China
Prior art keywords
cover
mud
sampling equipment
shadoof
pulling part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521087967.4U
Other languages
Chinese (zh)
Inventor
朱国春
黄睿
张凯
钟友元
张文彪
杨兆坤
邸凯强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing orient Nova survey and Design Co., Ltd.
Original Assignee
BEIJING NEW ORIENTAL STAR PETROCHEMICAL ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING NEW ORIENTAL STAR PETROCHEMICAL ENGINEERING Co Ltd filed Critical BEIJING NEW ORIENTAL STAR PETROCHEMICAL ENGINEERING Co Ltd
Priority to CN201521087967.4U priority Critical patent/CN205246388U/en
Application granted granted Critical
Publication of CN205246388U publication Critical patent/CN205246388U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model relates to a mud sampling equipment relates to a mud sampling equipment field, makes it take a sample to the mud that mud off dug the hole bottom of pore -forming bored concrete pile soon. Mud sampling equipment includes: barrel, upper cover, lower cover, shadoof and carry the portion of drawing, the upper shed department of barrel connects and has the guide bar that upwards extends, and the top of guide bar is provided with the dog, and the inside of barrel has coaxial guide sleeve, and guide sleeve is fixed in in the barrel through the support, the edge of upper cover has the guiding hole of sliding connection on the guide bar, and the upper cover can slide on the guide bar through the guiding hole to cover on the upper shed of barrel, or separate from the upper shed of barrel, the one end of shadoof is connected in the lower cover, and the other end passes guide sleeve and upper cover in proper order, carry the portion of drawing include with cover connection's the first portion of drawing of carrying, carry the portion of drawing with the second that the other end of shadoof is connected. Comparing the experience of evidence and confirming the data of mud, the data that the inspection obtained after the sample are more reliable.

Description

Mud sampling equipment
Technical field
The utility model relates to a kind of mud sampling equipment field, particularly relates to a kind of mud sampling and establishesStandby.
Background technology
In present architectural engineering, have the method for many ground processing, fill out as changed Sand-gravel-cushion Technioue, heavy-tamping method,Sand Pile Method, vibroflotation, Deep Mixing Method, reinforced concrete bored pile etc.
Reinforced concrete bored pile is as one of effective ways of ground processing, and armored concrete is filled withNote stake is divided into again dry hole by construction technology revolves and scrapes out hole pouring pile and mud off and revolve and scrape out hole pouring pile,Mud off revolve scrape out that hole pouring pile is applicable to cohesive soil, silt, sandy soil, bankets, rubble and weatheringRock stratum, due to its wide adaptability, advanced technology and being widely used, the quality of its pile quality can be straightConnect and affect the bearing capacity of building foundation and horizontal force, mud off sinks at the bottom of revolving the hole that scrapes out hole pouring pileThe thickness of slag, is the important indicator that determines its pile quality and bearing capacity, and thickness to sediment at the bottom of holeThe detection of index need to gather apart from 500mm place mud at the bottom of hole as sample, and density to this mud,Sand factor, viscosity etc. detect. But, the instrument that there is no at present to carry out hole bottom slurry sampling,Only can rule of thumb judge the thickness of sediment at the bottom of hole.
Utility model content
Main purpose of the present utility model is, provides a kind of mud sampling equipment of new structure, instituteThe technical problem solving is that the mud that can revolve at the bottom of the hole that scrapes out hole pouring pile mud off entersRow sampling.
The purpose of this utility model and solve its technical problem and realize by the following technical solutions.According to a kind of mud sampling equipment the utility model proposes, it comprises:
Cylindrical shell, the upper shed place connection of described cylindrical shell has upwardly extending guide post, described guide postTop be provided with block, the inside of described cylindrical shell has coaxial pilot sleeve, described pilot sleeveBe fixed in described cylindrical shell by support;
Upper cover, the edge of described upper cover has the pilot hole being slidably connected on described guide post, described inUpper cover can slide by pilot hole on described guide post, to cover in the upper shed of described cylindrical shell,Or separate from the upper shed of described cylindrical shell;
Lower cover;
Shadoof, one end is connected in described lower cover, the other end successively through described pilot sleeve and described inUpper cover;
Pulling part, described pulling part comprises the first pulling part and the second pulling part, described the first pulling partBe connected with described upper cover, described the second pulling part is connected with the other end of described shadoof.
The purpose of this utility model and solve its technical problem and also can adopt following technical measures further realExisting.
Preferably, aforesaid mud sampling equipment, the first wherein said pulling part comprises suspension ring, extremelyLack a rope and the first lining rope with length scale;
The first end of described rope is connected with described upper cover, the second end of described rope with described in hangRing connects, and one end of described the first lining rope is connected with described suspension ring, and the other end is for gripping;
Described the second pulling part is the second lining rope with length scale, one end of described the second pulling partBe connected with described shadoof, the other end is for gripping.
Preferably, aforesaid mud sampling equipment, wherein said lower cover is disc, described lower coverUpper surface is provided with the sealant of predetermined thickness, and the center of described lower cover is provided with and is connected with described shadoofConnecting hole.
Preferably, aforesaid mud sampling equipment, wherein said sealant is made up of rubber.
Preferably, aforesaid mud sampling equipment, wherein said guide post has two at least, described inGuide post interval predetermined angular is arranged on a week of described cylindrical shell upper shed;
Described guide post is cylindrical.
Preferably, aforesaid mud sampling equipment, wherein said support comprises at least three poles,Described pole is in same level, and one end of described pole is connected with described pilot sleeve outer wall, instituteState the other end of pole and the inwall of described cylindrical shell is connected.
Preferably, aforesaid mud sampling equipment, wherein said upper cover is circular arc, described upper coverShaft core position have through hole, the upper surface precalculated position of described upper cover has hanger, described hanger withDescribed the first pulling part connects.
Preferably, aforesaid mud sampling equipment, wherein said shadoof is cylindrical bar, described shadoofOne end with described lower cover for being threaded;
The other end of described shadoof has connecting ring, and described connecting ring is connected with described the second pulling part.
By technique scheme, the utility model mud sampling equipment at least has following advantages:
In technical solutions of the utility model, the global shape of mud sampling equipment is barrel shape, cylindrical shell upperOpening part is provided with upwardly extending guide post, and the upper cover of cylindrical shell can be slidably reciprocated on guide post,And there is block on the top of guide post, upper cover is in the time sliding into the top of guide post, and upper cover block keeps offFirmly can not continue upward sliding, realize upper cover covering and separating, the inside of cylindrical shell with respect to cylindrical shellBe provided with the pilot sleeve coaxial with cylindrical shell, and an one end is set is connected with lower cover, the other end successivelyThrough the shadoof of pilot sleeve and upper cover, lower cover can be realized with respect to cylinder under the control of shadoofThe covering and separating of body, in order to control the motion of the utility model mud sampling equipment in fill orifice,And control upper cover and lower cover with respect to the covering and separating of cylindrical shell, be connected respectively with on shadoof at upper coverFill orifice can be transferred to by the utility model mud sampling equipment in pulling part under the control of pulling partDesired depth position, and control the folding with respect to cylindrical shell of upper cover and lower cover, and then will need to detectMud running into tank, the sampling of taking out mud sampling equipment and complete mud from hole. Than existingIn technology, there is no special mud sampling equipment, only can rule of thumb judge the thickness of sediment at the bottom of hole, makeCan extract the mud sample of the desired depth position of fill orifice with mud sampling equipment of the present utility modelProduct, and then by the inspection to sampling mud, obtain the thickness data of sediment at the bottom of hole, check to obtain dataBeguine is more reliable according to the data of micro-judgment.
Above-mentioned explanation is only the general introduction of technical solutions of the utility model, in order to better understand this realityBy novel technological means, and can be implemented according to the content of description, below with the utility modelPreferred embodiment and coordinate accompanying drawing to be described in detail as follows.
Brief description of the drawings
Fig. 1 is that the open mode structure of a kind of mud sampling equipment of providing of the utility model embodiment is shownIntention;
Fig. 2 is that the closed state structure of a kind of mud sampling equipment of providing of the utility model embodiment is shownIntention.
Detailed description of the invention
The technology hand of taking for reaching predetermined utility model object for further setting forth the utility modelSection and effect, below in conjunction with accompanying drawing and preferred embodiment, to the mud sampling according to the utility model proposesIts detailed description of the invention of equipment, structure, feature and effect thereof, be described in detail as follows. In following explanationIn, the not necessarily same embodiment that different " embodiment " or " embodiment " refer to. In addition,Special characteristic, structure or feature in one or more embodiment can be combined by any suitable form.
As shown in Figure 1, a kind of mud sampling equipment that an embodiment of the present utility model proposes, itsComprise: cylindrical shell 1, upper cover 2, lower cover 3, shadoof 4 and pulling part 5, upper shed place of cylindrical shell 1Connect and have upwardly extending guide post 11, the top of guide post 11 is provided with block 111, cylindrical shell 1Inside there is coaxial pilot sleeve 12, pilot sleeve 12 is fixed in cylindrical shell by support; Upper cover2 edge has the pilot hole being slidably connected on guide post, and upper cover 2 can be by pilot hole in guidingOn bar 11, slide, to cover in the upper shed of cylindrical shell 1, or separate from the upper shed of cylindrical shell 1; CarryOne end of bar 4 is connected in lower cover 3, and the other end is successively through pilot sleeve 12 and upper cover 2; LiftPortion 5 comprises that the first pulling part 51 and 52, the first pulling parts 51, the second pulling part are connected with upper cover 2,The second pulling part 52 is connected with the other end of shadoof 4.
In use, sliding on the upwardly extending guide post that upper cover can connect in upper shed place of cylindrical shellMoving, shadoof one end connects lower cover, and the other end is successively through being arranged on inner barrel and coaxial the leading of cylindrical shellTo sleeve and upper cover, and the first pulling part in pulling part is connected with upper cover, the second pulling part withThe other end of shadoof connects. Concrete sampling operation is: first, detect according to the sounding instrument of drilling machineThe hole of fill orifice at the bottom of to the distance of the lower cover of mud sampling equipment of the present utility model, user's handling withThe second pulling part that shadoof connects, slowly transfers mud sampling equipment along the center of fill orifice, nowAs shown in Figure 2, the utility model mud sampling equipment is complete closed state, when mud sampling equipmentThe desired depth position of transferring to grout hole, stops transferring the second pulling part, lifts afterwards and top capThe first pulling part connecing, makes upper cover upward sliding on guide post, when the block of upper cover and guide post touchesTouch, the first pulling part is fixed to the first pulling part and second being now connected with upper cover and shadoof respectivelyPulling part is lifting mud sampling equipment simultaneously, continues to transfer the second pulling part, and lower cover is moved downwardThe distance of 100mm left and right, this action 3 to 5 times repeatedly, finally lifts the second pulling part by lower cover and cylinderBody fastens, and slowly promotes, and in the process promoting, upper cover and cylindrical shell fasten, by the mud envelope of samplingExist in bucket, promote mud sampling equipment to pouring into aperture, the mud of extraction is poured into pre-prepdIn vessel, can carry out next step detection to mud index.
Concrete, it is long generally at tens meters to 60 to 70 meter that the revolving of mud off scrapes out hole pouring pile stake,For ensureing quality and the bearing capacity of pile body, need to ensure that the sediment thickness index at the bottom of hole meets the demands, rootRequirement according in " technical code for building pile foundation ": before concrete perfusion, at the bottom of hole, 500mm is with interior mudSlurry relative density should be less than 1.25; Sand factor is not more than 8%; Viscosity is not more than 28s. So extractApart from the mud at 500mm place at the bottom of fill orifice, need the utility model mud sampling equipment to transfer toApart from the position at 500mm place at the bottom of fill orifice, now lower cover apart from fill orifice at the bottom of 500mm. To extractMud sample test, so mud does not meet code requirement, needs to change in fill orificeMud, and the mud after changing is sampled to detection, until the mud of sampling reaches " building pile foundationTechnical specification " in requirement, stop mud checking.
In technical solutions of the utility model, the global shape of mud sampling equipment is barrel shape, cylindrical shell upperOpening part is provided with upwardly extending guide post, and the upper cover of cylindrical shell can be slidably reciprocated on guide post,And there is block on the top of guide post, upper cover is in the time sliding into the top of guide post, and upper cover block keeps offFirmly can not continue upward sliding, realize upper cover covering and separating, the inside of cylindrical shell with respect to cylindrical shellBe provided with the pilot sleeve coaxial with cylindrical shell, and an one end is set is connected the other end with lower cover and wears successivelyCross the shadoof of pilot sleeve and upper cover, lower cover can be realized with respect to cylindrical shell under the control of shadoofCover and separate, in order to control the motion of the utility model mud sampling equipment in fill orifice, withAnd control upper cover and lower cover with respect to the covering and separating of cylindrical shell, be connected and carry respectively with on shadoof at upper coverDraw portion, under the control of pulling part, the utility model mud sampling equipment can be transferred to fill orificeDesired depth position, and control the folding with respect to cylindrical shell of upper cover and lower cover, and then needs are detectedMud running into tank, the sampling of taking out mud sampling equipment and complete mud from hole. Than existing skillIn art, there is no special mud sampling equipment, only can rule of thumb judge the thickness of sediment at the bottom of hole, useMud sampling equipment of the present utility model can extract the mud sample of the desired depth position of fill orifice,And then by the inspection to sampling mud, obtain the thickness data of sediment at the bottom of hole, check to obtain data beguineData according to micro-judgment are more reliable.
As shown in Figure 1, in the middle of concrete enforcement, wherein the first pulling part 51 comprises suspension ring 511, extremelyLack a rope 512 and the first lining rope 513 with length scale; First of rope 5112End is connected with upper cover 2, and the second end of rope 512 is connected with suspension ring 511, the first lining rope 513One end is connected with suspension ring 511, and the other end is for gripping; The second pulling part 52 is with length scaleThe second lining rope, one end of the second pulling part 52 is connected with shadoof 4, and the other end is for gripping.
Concrete, the rope of the first pulling part can be arranged to two, three or four, evenlyBeing connected to of distributing covers, and the other end of rope is all connected on suspension ring, like this by being connected toLining rope on suspension ring can be mentioned upper cover, and in the process promoting at upper cover, because upper cover is subject to evenly to divideThe pulling force of the rope of cloth, can deflection, straight up motion in upper cover ascending process. Because of firstPulling part and the second pulling part are all used the lining rope with length scale as lifting parts, thus underIn the process of side's the utility model mud sampling equipment, can know mud by the length scale on lining ropeThe distance that sampling equipment is transferred, realizes the sampling of the mud at 500mm place at the bottom of fill orifice hole of adjusting the distance.
Wherein lining rope can adopt the steel wire rope with length scale, or uses the Buddhist nun with length scaleLong Sheng, steel wire rope and nylon rope are high and cheap with respect to other materials intensity, can reduce this realityBy the cost of novel mud sampling equipment.
As described in Figure 1, in the middle of concrete enforcement, wherein lower cover 3 is disc, lower cover 3 upper surfacesThe sealant 31 that is provided with predetermined thickness, the center of lower cover 3 is provided with the connecting hole being connected with shadoof 4.
Concrete, for coordinating the shape of cylindrical shell, lower cover being designed to disc, the edge of lower cover is upwardsBending, the plate of similar people's dining, shadoof is connected with lower cover by the centre bore of lower cover, works as shadoofLift lower cover by the under shed capping of cylindrical shell time, the sealant hold-down barrel of lower cover upper surface,By the junction sealing of lower cover and cylindrical shell, the mud extracting can not established from the sampling of the utility model mudIn standby, spill.
As shown in Figure 1, in the middle of concrete enforcement, wherein sealant 31 is made up of rubber. Concrete,Under cover predetermined thickness sealant made by elastomeric material, because elastomeric material has certain elasticity,And corrosion-resistant, be suitable as very much encapsulant, when lower cover is subject to the pulling force of shadoof and is fastened on cylindrical shellWhen upper, the sealant of quality of rubber materials is under pressure and produces distortion, and then by the seam between cylindrical shell and lower coverGap blocks, and has realized the effect of sealing.
As shown in Figure 1, in the middle of concrete enforcement, wherein guide post 11 is cylindrical and has two at least,Guide post 11 interval predetermined angulars are arranged on a week of cylindrical shell 1 upper shed.
Concrete, upper cover will slide by the pilot hole on its body on guide post, so will leadBar is designed to cylindrical, guide post is easily processed and be convenient to upper cover to slide thereon, simultaneously in order to makeWhen upper cover slides on guide post, can smooth sliding not tilt, by guide post be designed to two, three,Four or more, and guide post is arranged on uniformly to a week of cylindrical shell upper shed.
As shown in Figure 1, in the middle of concrete enforcement, its medium-height trestle comprises at least three poles 121, pole121 in same level, and one end of pole 121 is connected with pilot sleeve 12 outer walls, pole 121The other end be connected with the inwall of cylindrical shell 1.
Concrete, connect the pilot sleeve outer wall other end by pole one end and connect cylinder inboard wall, will leadFix to sleeve, and all poles are all in same level, have ensured pilot sleeve and cylindrical shellCoaxially. When shadoof shadoof also on the axle center in cylindrical shell when the pilot sleeve, and then lift at shadoofWhen lower cover motion, lower cover moves up and down along the axle center of cylindrical shell, ensures that lower cover can be good with cylindrical shellCover.
As shown in Figure 1, in the middle of concrete enforcement, wherein upper cover 2 is circular arc, the axle center of upper cover 2Position has through hole, and the upper surface precalculated position of upper cover 2 has and can be connected with the first pulling part 51Hanger 21.
Concrete, the shape of upper cover is as the shape of the conventional pot cover of people, at the centre bit of its circular arcPut that have can be through the through hole of shadoof, and surface uniform setting is thereon connected with the first pulling partHanger, the first pulling part slides upper cover by lifting hanger on guide post.
As shown in Figure 1, in the middle of concrete enforcement, wherein shadoof 4 is cylindrical bar, one end of shadoof 4With lower cover 3 for being threaded; The other end of shadoof 4 has connecting ring 41, and connecting ring 41 and second is carriedDraw portion 52 to connect.
Concrete, shadoof can be round steel pipe or round steel bar, and screw thread can be passed through with lower cover in one end of shadoofDirectly connect, or the screwed first end of shadoof is through the lower cover nut of then screwing at its screw thread placeMode be connected with lower cover, at the other end of the shadoof connecting ring of burn-oning, the lining rope of the second pulling part canTie up on connecting ring and to realize and being connected of shadoof.
The above, be only preferred embodiment of the present utility model, not the utility model doneAny pro forma restriction, that according to technical spirit of the present utility model, above embodiment is done is anySimple modification, equivalent variations and modification, all still belong in the scope of technical solutions of the utility model.

Claims (8)

1. a mud sampling equipment, is characterized in that, it comprises:
Cylindrical shell, the upper shed place connection of described cylindrical shell has upwardly extending guide post, described guide postTop be provided with block, the inside of described cylindrical shell has coaxial pilot sleeve, described pilot sleeveBe fixed in described cylindrical shell by support;
Upper cover, the edge of described upper cover has the pilot hole being slidably connected on described guide post, described inUpper cover can slide by pilot hole on described guide post, to cover in the upper shed of described cylindrical shell,Or separate from the upper shed of described cylindrical shell;
Lower cover;
Shadoof, one end is connected in described lower cover, the other end successively through described pilot sleeve and described inUpper cover;
Pulling part, described pulling part comprises the first pulling part and the second pulling part, described the first pulling partBe connected with described upper cover, described the second pulling part is connected with the other end of described shadoof.
2. mud sampling equipment according to claim 1, is characterized in that,
Described the first pulling part comprises suspension ring, at least one rope and with first of length scaleLining rope;
The first end of described rope is connected with described upper cover, the second end of described rope with described in hangRing connects, and one end of described the first lining rope is connected with described suspension ring, and the other end is for gripping;
Described the second pulling part is the second lining rope with length scale, one end of described the second pulling partBe connected with described shadoof, the other end is for gripping.
3. mud sampling equipment according to claim 1, is characterized in that,
Described lower cover is disc, and described lower cover upper surface is provided with the sealant of predetermined thickness, described inThe center of lower cover is provided with the connecting hole being connected with described shadoof.
4. mud sampling equipment according to claim 3, is characterized in that,
Described sealant is made up of rubber.
5. mud sampling equipment according to claim 1, is characterized in that,
Described guide post has two at least, and described guide post interval predetermined angular is arranged on described cylindrical shellOne week of opening;
Described guide post is cylindrical.
6. mud sampling equipment according to claim 1, is characterized in that,
Described support comprises at least three poles, and described pole is in same level, described poleOne end is connected with described pilot sleeve outer wall, and the other end of described pole is connected with the inwall of described cylindrical shell.
7. mud sampling equipment according to claim 1, is characterized in that,
Described upper cover is circular arc, and the shaft core position of described upper cover has through hole, the upper table of described upper coverFace precalculated position has hanger, and described hanger is connected with described the first pulling part.
8. mud sampling equipment according to claim 1, is characterized in that,
Described shadoof is cylindrical bar, one end of described shadoof with described lower cover for being threaded;
The other end of described shadoof has connecting ring, and described connecting ring is connected with described the second pulling part.
CN201521087967.4U 2015-12-23 2015-12-23 Mud sampling equipment Active CN205246388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521087967.4U CN205246388U (en) 2015-12-23 2015-12-23 Mud sampling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521087967.4U CN205246388U (en) 2015-12-23 2015-12-23 Mud sampling equipment

Publications (1)

Publication Number Publication Date
CN205246388U true CN205246388U (en) 2016-05-18

Family

ID=55945461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521087967.4U Active CN205246388U (en) 2015-12-23 2015-12-23 Mud sampling equipment

Country Status (1)

Country Link
CN (1) CN205246388U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106053143A (en) * 2016-05-19 2016-10-26 中交二航局第三工程有限公司 Drilling pile slurry sampling device and sampling method
CN106087971A (en) * 2016-06-27 2016-11-09 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes paste-making method
CN106120712A (en) * 2016-06-27 2016-11-16 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes sizing device
CN106644571A (en) * 2017-01-23 2017-05-10 浙江省水利水电勘测设计院 Double-pipe bottom mud sampler
CN111551399A (en) * 2020-05-15 2020-08-18 中国葛洲坝集团第一工程有限公司 Pile hole bottom mud sampling device
CN111851609A (en) * 2020-07-15 2020-10-30 中国一冶集团有限公司 Simple manual liquid taking device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106053143A (en) * 2016-05-19 2016-10-26 中交二航局第三工程有限公司 Drilling pile slurry sampling device and sampling method
CN106053143B (en) * 2016-05-19 2019-04-19 中交二航局第三工程有限公司 Drilled pile slurry sampler and sampling method
CN106087971A (en) * 2016-06-27 2016-11-09 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes paste-making method
CN106120712A (en) * 2016-06-27 2016-11-16 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes sizing device
CN106120712B (en) * 2016-06-27 2018-05-04 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes sizing device
CN106644571A (en) * 2017-01-23 2017-05-10 浙江省水利水电勘测设计院 Double-pipe bottom mud sampler
CN111551399A (en) * 2020-05-15 2020-08-18 中国葛洲坝集团第一工程有限公司 Pile hole bottom mud sampling device
CN111851609A (en) * 2020-07-15 2020-10-30 中国一冶集团有限公司 Simple manual liquid taking device

Similar Documents

Publication Publication Date Title
CN205246388U (en) Mud sampling equipment
CN101713278B (en) One-pile double-machine construction method for drilling pouring pile hole formation
CN206845146U (en) A kind of water-stop and antipriming to be drawn water for Geology Drilling layering
CN107905218A (en) A kind of karst cave treatment method in the construction applied to Pile In Drill In Karst Terrain
CN107246007B (en) A kind of CFG of construction method
CN103233693B (en) Drilled pile pile foundation secondary pile hole cleaning device and clear hole method
CN110630321A (en) Goaf on-well filling equipment and method thereof
CN104912065A (en) Underwater anchor pile construction method
CN104265326A (en) Method for controlling soil deformation in large rectangular pipe jacking
CN102535472A (en) Pored-tube filling and high-pressure impacting extruding grouting method
CN103696430B (en) The construction technology of the recyclable steel-pipe pile of not slip casting
CN111254933B (en) Karst grouting construction method for sleeve valve pipe
CN109060440A (en) The micro- well-flushing sampling monitoring well in refuse landfill underground water multilayer position
CN106284311B (en) A kind of dry efficient construction technology of pore-forming cast-in-place concrete pile of rotary drilling rig
CN109577988B (en) Parallel construction method for blind inclined shaft of metal mine
CN104612188A (en) Slurry extractor and extraction method thereof
CN101672160A (en) Quick well formation device in soft soil layer
CN113404042A (en) Bridge pile position construction method
CN203891785U (en) Special joint pipe assembly for throwing of gravels in pipe of hydrogeological water well
CN109555559B (en) Water prevention and treatment technical method for thousand-meter-level blind shaft of metal mine
CN204551416U (en) A kind of bored pile pile crown concrete sampler
CN207600784U (en) Underground structure mud sampler
CN104931678A (en) Mine cemented filling slurry segregation degree detection and evaluation method
CN205100208U (en) Crowded, reaming reinforced concrete bored concrete pile composite pile of high water spray earth anger
CN210686054U (en) Goaf filling equipment on well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181101

Address after: 102628 B516, 4 floor, 6 building, 15 Jinyuan Road, Daxing District, Beijing.

Patentee after: Beijing orient Nova survey and Design Co., Ltd.

Address before: 100070 28, seven District, 188 tower, South Fourth Ring Road, Fengtai District, Beijing.

Patentee before: Beijing New Oriental Star Petrochemical Engineering Co., Ltd.

TR01 Transfer of patent right