CN204551416U - A kind of bored pile pile crown concrete sampler - Google Patents

A kind of bored pile pile crown concrete sampler Download PDF

Info

Publication number
CN204551416U
CN204551416U CN201520233699.6U CN201520233699U CN204551416U CN 204551416 U CN204551416 U CN 204551416U CN 201520233699 U CN201520233699 U CN 201520233699U CN 204551416 U CN204551416 U CN 204551416U
Authority
CN
China
Prior art keywords
pile
suspension ring
pile crown
cylindrical shell
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520233699.6U
Other languages
Chinese (zh)
Inventor
曹振庆
张玉敏
李春晖
李玉涛
王宗明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Keda Infrastructure Co ltd
Original Assignee
KEDA GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KEDA GROUP CO Ltd filed Critical KEDA GROUP CO Ltd
Priority to CN201520233699.6U priority Critical patent/CN204551416U/en
Application granted granted Critical
Publication of CN204551416U publication Critical patent/CN204551416U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Piles And Underground Anchors (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

A kind of bored pile pile crown concrete sampler, comprise sample bucket, suspension ring, lining rope, base plate and baffle plate, described sample bucket is the cylindrical shell of both ends open, and the upper end of cylindrical shell connects suspension ring, lower end connecting bottom board; Described suspension ring connect lining rope, the central openings of described base plate and realize unidirectional to open or closed by the baffle plate being hinged on plate upper surface.A kind of bored pile pile crown concrete sampler of the present utility model, there is the advantages such as processing technology is simple, cost of production is low, wide accommodation, be applied to pile foundation construction, for constructor accurately judges that stake top concrete quality provides accurately, reliable foundation in early days, workmanship is played to mid-event control, accomplishes cost savings there is higher popularizing value.

Description

A kind of bored pile pile crown concrete sampler
Technical field
The utility model relates to the Grouting Pile Engineering of Drilling Hole of engineering construction field, relates to pile crown concrete sampling instrument during a kind of bored pile construction specifically.
Background technology
In building construction, in the Grouting Pile Engineering of Drilling Hole construction of Urban Bridge and highway bridge, traditional method adopts plummet to measure the concrete degree of depth, adopt is no problem for the bored pile of general medium-small diameter in this way, but for major diameter, the pile foundation filling concrete construction of ultra-deep, when mud skin is thicker or concrete top laitance is more, plummet is easily absorbed in pile crown, cause the data measured often lower than actual pile crown absolute altitude, thus cause the shaping rear pile crown of concreting larger, concrete is wasted, and cause abolishing of postorder pile crown also greatly to be improved with disposal cost, uneconomically also waste resource.
Also the high and top pile crown concrete degree of depth of useful stock detection pile crown concrete top mark and quality condition in engineering, but the method detects afterwards, the control in advance to concrete amount cannot be accomplished, and detect the pile foundation concrete degree of depth and quality, concrete sand building stones feel sensation can only be touched with feeler, intuitively cannot understand concrete sand building stones whether even, and not be suitable for design of pile top absolute altitude from the darker stake top concrete detection of drilling machine construction platform.
Utility model content
The utility model is exactly the shortcoming and defect for the concrete location method of conventional detection pile crown, for how accurately to calculate pile foundation concrete final demand amount in advance, control the super filling height of pile foundation, visit and get 0.5m pile foundation that construction technique normalizing specifies whether surpass filling scope inner concrete stone even, prevent pile crown too high or too low, ensure that construction quality saves construction cost, and propose a kind of novel bored pile pile crown concrete sampler.
The technical solution of the utility model is: comprise sample bucket, suspension ring, lining rope, base plate and baffle plate, and described sample bucket is the cylindrical shell of both ends open, and the upper end of cylindrical shell connects suspension ring, lower end connecting bottom board; Described suspension ring connect lining rope, the central openings of described base plate and realize unidirectional to open or closed by the baffle plate being hinged on plate upper surface.
Such scheme can more preferably:
The side of described cylindrical shell is fixed with one or more balancing weight, can select suitable counterweight according to actual conditions.
Described cylindrical shell is the seamless steel pipe of long 110mm, wall thickness 5mm, external diameter 120mm; Described base plate is the steel plate of radius 61mm, thick 1mm; Described hole is the circular hole of radius 20mm; Described baffle plate is the round plate of radius 23mm; Described suspension ring are the arc-shaped ring body that Φ 6 reinforcing bar is made; Described lining rope adopts steel matter lining rope (lining rope Material Strength is higher not easily to be extended, and data scalar is accurate).Its middle cylinder body and base plate and suspension ring are welded to connect respectively.
The operating principle of above-mentioned sampler is as follows: before the complete conduit of pile foundation concreting is not extracted, and uses when the pile crown absolute altitude that plummet measures arrives theoretical elevation location.During use, sampler is sunk in boring, sink in process and read lining rope scale, accurately to fish for the slag specimen sample of desired area.After sampler arrives assigned address, upper and lower Fast Activities lining rope, makes sample bucket repeatedly move up and down fast in hole.Now bottom of device single-way switch when sampler sinks upwards activity open and make slag specimen enter in sample bucket, when above carrying sample bucket, single-way switch moves downward automatically in closed condition, prevents slag specimen from flowing out.After so activity has got slag specimen twice repeatedly, above carry lining rope and sample bucket has been proposed, in hole, slag specimen is poured out observation.For ensureing that institute's sample thief is representative, get some position slag specimen more.As slag specimen in sample bucket has a large amount of stone, cement, represent this pile crown place, position concrete continuous, stone is even, pile crown is up-to-standard.As in bucket without stone or stone less, represent this position pile crown concrete quality poor, laitance is too much, need continue to build part concrete to ensure pile foundation quality.
A kind of bored pile pile crown concrete sampler of the present utility model, compared with traditional pile crown sniffer and method, has following remarkable advantage:
(1) the utility model is compared with traditional survey tool, and technological principle is simple, and process operation is simple, processes former material and is easy to get, and practical simple to operate, low production cost, has higher use value.
(2) the utility model is compared with traditional plummet, not only can measure pile crown elevation of top, can visit simultaneously and get this position pile crown slag specimen, accurately can judge a top bit concrete quality according to slag specimen.Concrete can be avoided to surpass and to fill with the waste of material caused that exceeds standard, the construction cost increase that the later stage causes because abolishing, lifting, bury tall and big pile crown.Can avoid equally filling with not enough because pile crown is super, stake top off quality and cause the later stage deeply to cut a hole pile crown, formwork secondary builds the construction cost caused increases.
(3) the utility model is applicable to works limit comparatively extensively, is not only applicable to shallow-layer land pile driving construction, is more suitable for pile foundation construction on deep water.
In sum, a kind of bored pile pile crown concrete sampler of the present utility model, there is the advantages such as processing technology is simple, cost of production is low, wide accommodation, be applied to pile foundation construction, for constructor accurately judges that stake top concrete quality provides accurately, reliable foundation in early days, workmanship is played to mid-event control, accomplishes cost savings there is higher popularizing value.
Accompanying drawing explanation
A kind of bored pile pile crown of Fig. 1 concrete sampler elevation;
A kind of bored pile pile crown of Fig. 2 concrete sampler lateral view;
A kind of bored pile pile crown of Fig. 3 concrete sampler top view.
In figure: 1, suspension ring, 2, sample bucket, 3, balancing weight, 4, rotating shaft, 5, automatically closed baffle plate, 6, base plate.
Detailed description of the invention
Below in conjunction with accompanying drawing and instantiation, the utility model is described in further detail, but not as restriction of the present utility model.
A kind of bored pile pile crown concrete sampler of the present utility model, sample bucket 2, the automatically a few part such as closed baffle plate 5 and base plate 6 fast 4 by lining rope, suspension ring 1, counterweight are formed; Wherein sample bucket 2 is the cylindrical shell of both ends open, and the quality that the upper end of cylindrical shell connection suspension ring, lower end connecting bottom board, surrounding are provided with the balancing weight 3(balancing weight of multiple steel can be selected as required, we preferably make sample bucket gross mass control at about 2.5kg), cylindrical shell is chosen as the seamless steel pipe of long 110mm, wall thickness 5mm, external diameter 120mm, base plate 6 is the steel plate of radius 61mm, thick 1mm, suspension ring 1 are the arc-shaped ring body that Φ 6 reinforcing bar is made, and cylindrical shell and base plate 6 and suspension ring 1 are welded to connect respectively; Suspension ring 1 connect steel matter lining rope; It is 20mm circular hole that the central authorities of base plate 6 open radius, and automatic closed baffle plate 5(radius is the round plate of 23mm, the radius slightly larger than hole) unidirectionally opening or closed of being hinged on that base plate 6 upper surface realizes circular hole by rotating shaft 4.
Above-mentioned bored pile pile crown concrete sampler make and use procedure as follows:
1, a kind of bored pile pile crown concrete sampler makes
The first step: choose raw material according to each component specification model of the utility model shown device;
Second step: according to the measure of the utility model shown device;
3rd step: each parts got ready are carried out welding assembly and make sampler, first rotating shaft 4 and base plate 6 are welded the polycrystalline substance being connected automatic closed baffle plate structure 5 apparatus for converting again, then the bottom of polycrystalline substance with sample bucket 2 is welded, afterwards at the welded top suspension ring 1 of sample bucket 2, assemble after full-page proof according to demand at the uniform multiple balancing weight 3 of sample bucket periphery.
2, a kind of bored pile pile crown concrete sampler uses
The first step: when carrying out underground pile filling concrete, by this apparatus, with to job site;
Second step: lining rope is connected with suspension ring 1, carry out tolerance with small band tape to lining rope scale and demarcate, lining rope gage length can be chosen according to the actual requirements, causes measurement error lining rope material to be required to be wire rope because sampler quality more greatly prevents lining rope from extending;
3rd step: after slag specimen position being fished in the placement of the utility model device in advance with lining rope, carries rapidly and below device fishes for slag specimen, and the scope that fluctuates not easily exceeds 20cm;
4th step: device is proposed stake holes, pours out slag specimen in device and carries out observe and decide pile crown concrete quality, for ensureing the representativeness of sample, can arrange several places sample point more.
Except the technical characteristic described in this manual, be the known technology of those skilled in the art.

Claims (3)

1. a bored pile pile crown concrete sampler, is characterized in that: comprise sample bucket, suspension ring, lining rope, base plate and baffle plate, described sample bucket is the cylindrical shell of both ends open, and the upper end of cylindrical shell connects suspension ring, lower end connecting bottom board; Described suspension ring connect lining rope, the central openings of described base plate and realize unidirectional to open or closed by the baffle plate being hinged on plate upper surface.
2. bored pile pile crown concrete sampler according to claim 1, is characterized in that: the side of described cylindrical shell is fixed with one or more balancing weight.
3. bored pile pile crown concrete sampler according to claim 1 and 2, is characterized in that: described cylindrical shell is the seamless steel pipe of long 110mm, wall thickness 5mm, external diameter 120mm; Described base plate is the steel plate of radius 61mm, thick 1mm; Described hole is the circular hole of radius 20mm; Described baffle plate is the round plate of radius 23mm; Described suspension ring are the arc-shaped ring body that Φ 6 reinforcing bar is made; Described lining rope adopts steel matter lining rope.
CN201520233699.6U 2015-04-17 2015-04-17 A kind of bored pile pile crown concrete sampler Expired - Fee Related CN204551416U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520233699.6U CN204551416U (en) 2015-04-17 2015-04-17 A kind of bored pile pile crown concrete sampler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520233699.6U CN204551416U (en) 2015-04-17 2015-04-17 A kind of bored pile pile crown concrete sampler

Publications (1)

Publication Number Publication Date
CN204551416U true CN204551416U (en) 2015-08-12

Family

ID=53826549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520233699.6U Expired - Fee Related CN204551416U (en) 2015-04-17 2015-04-17 A kind of bored pile pile crown concrete sampler

Country Status (1)

Country Link
CN (1) CN204551416U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105547758A (en) * 2015-12-02 2016-05-04 中国地质大学(武汉) Piston type deep part sampling device used during process of concrete pouring
CN109537652A (en) * 2019-01-18 2019-03-29 中冶建工集团有限公司 Cast-in-place pile concrete compactness inspection sampler and quality determining method
CN111549768A (en) * 2020-05-28 2020-08-18 中铁二十二局集团第三工程有限公司 Method for quickly and accurately controlling pile head height

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105547758A (en) * 2015-12-02 2016-05-04 中国地质大学(武汉) Piston type deep part sampling device used during process of concrete pouring
CN109537652A (en) * 2019-01-18 2019-03-29 中冶建工集团有限公司 Cast-in-place pile concrete compactness inspection sampler and quality determining method
CN109537652B (en) * 2019-01-18 2024-06-11 中冶建工集团有限公司 Cast-in-place pile concrete compactness detection sampling device and quality detection method
CN111549768A (en) * 2020-05-28 2020-08-18 中铁二十二局集团第三工程有限公司 Method for quickly and accurately controlling pile head height
CN111549768B (en) * 2020-05-28 2021-10-26 中铁二十二局集团第三工程有限公司 Method for quickly and accurately controlling pile head height

Similar Documents

Publication Publication Date Title
CN104110028B (en) A kind of dry operation boring is without the cast-in-place pile construction method of water law concrete perfusion
CN109555116A (en) A kind of high density karst intense development area fully-sleeved filled pile construction method
CN103266599B (en) The dry construction method of digging drilling pile of soil skerry ground churning driven
CN110318412A (en) A kind of solution cavity pile base construction method
CN204551416U (en) A kind of bored pile pile crown concrete sampler
CN106988302A (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN103266600A (en) Occlusion pile of full reinforcement pile and construction method thereof
CN106149684A (en) A kind of full-sleeve long screw auger drilling deposited pile construction method
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN103015427B (en) Hole pile underwater concrete pouring positioning device and positioning device thereof
CN112709529A (en) Radial grading pore-forming construction method and application of hard rock layer drilled pile
CN107503384A (en) Assembled underground continuous wall penetrating resistance test device
CN102912806A (en) Construction method of precipitation well
CN111395330A (en) Construction method for concrete cast-in-situ bored pile complete steel casing penetrating through underground gallery
CN107503344A (en) The construction method of turnover type merogenesis steel pile casting retaining wall manually digging hole filling pile
CN106284311B (en) A kind of dry efficient construction technology of pore-forming cast-in-place concrete pile of rotary drilling rig
CN105275024A (en) Method for detecting and reinforcing vertical bearing force of defective large-diameter socketed pile
CN108547331A (en) Caisson pile concrete elevation measures and superfilled control method
CN107059846A (en) Coordinate the super large draw ratio filling pile cage of reinforcement and drilling core checking method of drilling core checking
CN105780825B (en) A kind of pile foundation construction environmental Kuznets Curves and evaluation method based on autobalanced detection experiment
CN112878315A (en) End-bearing rotary-digging hole-forming cast-in-place pile based on Civil 3D technology and construction method
CN115404852B (en) Large-diameter rotary-digging bored pile and construction process thereof
CN207331781U (en) A kind of assembled underground continuous wall penetrating resistance test device
CN209941652U (en) Integral embedding device and embedding structure of pore pressure sensor
CN105839621B (en) A kind of implementation method of abrupt-change cross section and unlike material drilled pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Cao Zhenqing

Inventor after: Bo Lei

Inventor after: Zhang Yumin

Inventor after: Li Chunhui

Inventor after: Wang Zongming

Inventor before: Cao Zhenqing

Inventor before: Zhang Yumin

Inventor before: Li Chunhui

Inventor before: Li Yutao

Inventor before: Wang Zongming

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170623

Address after: 257000, the Yellow River Road, Dongying District, Shandong City, Dongying Province, planning five West Road Science and technology enterprise accelerator E2-4-403

Patentee after: SHANDONG KEDA INFRASTRUCTURE Co.,Ltd.

Address before: 257091 Shandong city of Dongying province Dongying District Front Street No. 65

Patentee before: KEDA GROUP Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

CF01 Termination of patent right due to non-payment of annual fee