CN210858067U - Assembled wall reserved steel bar positioning tool - Google Patents

Assembled wall reserved steel bar positioning tool Download PDF

Info

Publication number
CN210858067U
CN210858067U CN201921324813.0U CN201921324813U CN210858067U CN 210858067 U CN210858067 U CN 210858067U CN 201921324813 U CN201921324813 U CN 201921324813U CN 210858067 U CN210858067 U CN 210858067U
Authority
CN
China
Prior art keywords
sleeve
seted
reinforcing bar
slide
assembled wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921324813.0U
Other languages
Chinese (zh)
Inventor
王川
李小慧
封利军
郭腾
吴祺
彭景祥
张有振
杨雷刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction North Group Co ltd
Original Assignee
Beijing Urban Construction North Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction North Group Co ltd filed Critical Beijing Urban Construction North Group Co ltd
Priority to CN201921324813.0U priority Critical patent/CN210858067U/en
Application granted granted Critical
Publication of CN210858067U publication Critical patent/CN210858067U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a reinforcing bar positioning tool is reserved to assembled wall, including the device body, the spout has been seted up to device body lower surface, and the inside block of spout is fixed with the slide, and the both sides of slide are provided with spacing cardboard, and positioning screw has been seted up to one side of one of them spacing cardboard, and it has the location knob screw to peg graft in the positioning screw, and the slide below is provided with the sleeve, and the reinforcing bar trepanning has been seted up to the sleeve bottom, and the inner wall nestification of reinforcing bar trepanning has the cover to fill up. The utility model is suitable for a location of assembled wall reserved steel bar, through cup joint the device well sleeve on the embedded bar that exposes on the assembly vertical member building, the embedded bar top that exposes on the one hand can prevent to expose for a long time on the assembly vertical member building leads to the reinforcing bar corrosion serious, influence the reinforcing bar quality, on the other hand can prevent that the embedded bar that exposes on the assembly vertical member building from shifting in the removal, transportation or the in-process position of assembly from appearing, lead to the phenomenon that can't realize accurate assembly.

Description

Assembled wall reserved steel bar positioning tool
Technical Field
The utility model belongs to the technical field of building engineering, specifically be an assembled wall reserves reinforcing bar positioning tool.
Background
With the continuous progress of the building industry, the assembly type buildings are popularized more and more in China, and the implementation of the assembly type buildings is greatly promoted all over the world. The prefabricated wall body upper portion reserved steel bar is used for carrying out effectual being connected with the prefabricated wall body of upper strata, and does not carry out any processing to prefabricated wall body reserved steel bar of assembled in the construction, nevertheless all probably causes the condition of aversion to the reserved steel bar in transportation, hoist and pour the in-process, causes the later stage wall body installation in-process problem to appear, also can influence certain construction progress in addition.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to solve the problem among the background art, provide a reinforcing bar positioning tool is reserved to assembled wall body.
The utility model adopts the technical scheme as follows:
the utility model provides an assembled wall reserves reinforcing bar positioning tool, includes the device body, the spout has been seted up to device body lower surface, the inside block of spout is fixed with the slide, the both sides of slide are provided with spacing cardboard, one of them the location screw has been seted up to one side of spacing cardboard, it has the location knob screw to peg graft in the location screw, the slide below is provided with the sleeve, the reinforcing bar trepanning has been seted up to the sleeve bottom, the inner wall nestification of reinforcing bar trepanning has the cover to fill up, the mouth of vibrating has been seted up to device body upper surface.
The vibrating openings are arranged in a plurality of numbers, and the vibrating openings are distributed at equal intervals.
Wherein, the vertical section of the chute adopts a cross structure.
The top of the sleeve is provided with a threaded jack, a threaded rod is sleeved in the threaded jack, and the top of the threaded rod is welded to the bottom of the sliding plate.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. the utility model discloses in, through set up the device on the vertical component of assembled is building, cup joint the device on the embedded bar that exposes on the vertical component of assembled is building with the sleeve, on the one hand can prevent that the embedded bar top that exposes on the vertical component of assembled is building from exposing for a long time and leading to the reinforcing bar corrosion serious, influence the reinforcing bar quality, on the other hand can prevent that the embedded bar that exposes on the vertical component of assembled is building removing, the skew appears in the in-process position of transportation or assembly, lead to the phenomenon that can't realize accurate assembly, this in-process pollution reinforcing bar top that can prevent the concrete simultaneously pouring.
2. The utility model discloses in, the slide slip block at sleeve top can change every telescopic position through sliding slide in the spout of device body top, and such structure sets up telescopic position can be according to the embedded bar position slide adjusting position of assembled vertical member building in the device for the device's application scope is wider.
3. The utility model discloses in, threaded jack has been seted up at telescopic top, has cup jointed the threaded rod in the threaded jack, and the top welding of threaded rod can change telescopic height in the slide bottom, rotates the sleeve to make the device can be applicable to some uneven assembled vertical member buildings in embedded steel bar end, further strengthened the device's application scope.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is a top view of the present invention;
FIG. 3 is a schematic view of the installation structure of the middle sleeve of the present invention;
fig. 4 is a schematic view of the vertical section of the middle sleeve of the present invention.
The labels in the figure are: 1. a sleeve; 2. positioning the knob screw; 3. a slide plate; 4. a chute; 5. a device body; 6. a vibrating port; 7. positioning the screw hole; 8. a limiting clamping plate; 9. a threaded rod; 10. a threaded receptacle; 11. trepanning the reinforcing steel bars; 12. and (5) sleeving a cushion.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the invention.
Referring to fig. 1-3, a reinforcing bar positioning tool is reserved to assembled wall, including device body 5, spout 4 has been seted up to device body 5 lower surface, the inside block of spout 4 is fixed with slide 3, slide 3's both sides are provided with spacing cardboard 8, positioning screw 7 has been seted up to one side of one of them spacing cardboard 8, it has location knob screw 2 to peg graft in the positioning screw 7, slide 3 below is provided with sleeve 1, reinforcing bar trepanning 11 has been seted up to sleeve 1 bottom, reinforcing bar trepanning 11's inner wall nestification has sleeve gasket 12, device body 5 upper surface has been seted up and has been vibrated mouthful 6, the perpendicular cross-shaped structure of cross section adoption of spout 4, it is provided with a plurality ofly altogether to vibrate mouthful 6, and a plurality of mouth 6 equidistance.
By adopting the technical scheme:
the device is arranged on the assembled vertical component building, and the sleeve 1 in the device is sleeved on the embedded steel bars exposed on the assembled vertical component building, so that on one hand, the top of the embedded steel bars exposed on the assembled vertical component building can be prevented from being exposed for a long time to cause serious corrosion of the steel bars and influence on the quality of the steel bars, and on the other hand, the embedded steel bars exposed on the assembled vertical component building can be prevented from being deviated in position in the moving, transporting or assembling process to cause the phenomenon that accurate assembly cannot be realized;
because the upper surface of the device body 5 is equidistantly provided with the plurality of vibrating openings 6, the poured concrete can be conveniently vibrated when the assembled vertical member building is poured through the vibrating openings 6;
the 3 slip blocks of slide at sleeve 1 top are in spout 4, can change every sleeve 1's position through slide 3, and such structure sets up sleeve 1's position among the device can be according to the embedded bar position sliding adjustment position of assembled vertical member building for the device's application scope is wider.
The top of sleeve 1 is seted up threaded jack 10, and threaded rod 9 has been cup jointed in threaded jack 10, and the top welding of threaded rod 9 is in slide 3 bottoms.
By adopting the technical scheme:
the height of the sleeve 1 can be changed by rotating the sleeve 1, so that the device can be suitable for fabricated vertical member buildings with uneven embedded steel bar ends, and the application range of the device is further widened.
The operating principle, refer to fig. 1-4, during the use, at first slide 3 according to the position of the pre-buried reinforcing bar of assembled vertical component building, make each sleeve 1 position and the position one-to-one of the pre-buried reinforcing bar of assembled vertical component building in the device, screw the location knob screw 2 and fix a position sleeve 1 again, then rotate each sleeve 1, make the height of every sleeve 1 correspond with its pre-buried reinforcing bar that corresponds, then with each sleeve 1 plug bush in its corresponding pre-buried reinforcing bar top on the device, accomplish the installation of the device after, can vibrate the concrete that assembled vertical component building was pour through the mouth of vibrating 6.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (4)

1. The utility model provides an assembled wall reserved steel bar positioning tool, includes device body (5), its characterized in that: spout (4) have been seted up to device body (5) lower surface, spout (4) inside block is fixed with slide (3), the both sides of slide (3) are provided with spacing cardboard (8), one of them location screw (7) have been seted up to one side of spacing cardboard (8), it has positioning knob screw (2) to peg graft in location screw (7), slide (3) below is provided with sleeve (1), reinforcing bar trepanning (11) have been seted up to sleeve (1) bottom, the inner wall nestification of reinforcing bar trepanning (11) has sleeve gasket (12), mouth of vibrating (6) have been seted up to device body (5) upper surface.
2. An assembled wall precast concrete bar positioning tool as claimed in claim 1, wherein: the vibrating openings (6) are arranged in a plurality, and the vibrating openings (6) are distributed at equal intervals.
3. An assembled wall precast concrete bar positioning tool as claimed in claim 1, wherein: the vertical section of the sliding groove (4) adopts a cross structure.
4. An assembled wall precast concrete bar positioning tool as claimed in claim 1, wherein: the top of the sleeve (1) is provided with a threaded jack (10), a threaded rod (9) is sleeved in the threaded jack (10), and the top of the threaded rod (9) is welded to the bottom of the sliding plate (3).
CN201921324813.0U 2019-08-15 2019-08-15 Assembled wall reserved steel bar positioning tool Active CN210858067U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921324813.0U CN210858067U (en) 2019-08-15 2019-08-15 Assembled wall reserved steel bar positioning tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921324813.0U CN210858067U (en) 2019-08-15 2019-08-15 Assembled wall reserved steel bar positioning tool

Publications (1)

Publication Number Publication Date
CN210858067U true CN210858067U (en) 2020-06-26

Family

ID=71300716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921324813.0U Active CN210858067U (en) 2019-08-15 2019-08-15 Assembled wall reserved steel bar positioning tool

Country Status (1)

Country Link
CN (1) CN210858067U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832534A (en) * 2020-12-29 2021-05-25 河北省建筑科学研究院有限公司 Assembly type steel bar positioning template designed by positioning sliding groove and use method
CN113323408A (en) * 2021-06-16 2021-08-31 陈金凤 Heat-insulating construction process for external wall of fabricated building
CN114892992A (en) * 2022-06-24 2022-08-12 北京博大新元房地产开发有限公司 Precision control device and construction process for embedded steel bars of assembled wall conversion layer

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112832534A (en) * 2020-12-29 2021-05-25 河北省建筑科学研究院有限公司 Assembly type steel bar positioning template designed by positioning sliding groove and use method
CN113323408A (en) * 2021-06-16 2021-08-31 陈金凤 Heat-insulating construction process for external wall of fabricated building
CN113323408B (en) * 2021-06-16 2022-06-21 福建省二建建设集团有限公司 Construction process of assembled building outer wall
CN114892992A (en) * 2022-06-24 2022-08-12 北京博大新元房地产开发有限公司 Precision control device and construction process for embedded steel bars of assembled wall conversion layer
CN114892992B (en) * 2022-06-24 2024-04-02 北京博大新元房地产开发有限公司 Precision control device for embedded bars of assembled wall conversion layer and construction process

Similar Documents

Publication Publication Date Title
CN210858067U (en) Assembled wall reserved steel bar positioning tool
CN209538688U (en) A kind of curved surface Shimizu concrete template support construction
CN210066759U (en) Pile core concrete pouring device
RU2769634C1 (en) Device for making hollow concrete products, a method for making hollow concrete products and a hollow concrete structure
CN209723008U (en) Cushion cap foundation depth rim of a cup template
CN205669210U (en) Steel building concrete cup-shaped foundation inner bore die carrier
CN213449381U (en) Gap jointing device is built by laying bricks or stones to landscape building
CN210369938U (en) A can have enough to meet need sleeve for pouring stake core
CN209493945U (en) A kind of distribution device and connection structure of deep basal pit huge foundation underplate concrete
CN202595749U (en) Underwater concrete elevation controller
JP6530034B2 (en) Pile head processing device
CN112726585B (en) Concrete pipe pile splicing device
CN211109322U (en) Construction waste pipeline transportation device
CN207498938U (en) A kind of prefabricated pile cover for being suitable for concrete tubular pile, steel-pipe pile
CN217840095U (en) Inspection well pouring platform and device
CN211172669U (en) Concatenation formula shale sintering environmental protection perforated brick
CN205876346U (en) Integral template of pouring of tunnel invert and short side wall
CN206158120U (en) Multi -functional floating screed ware
CN214520882U (en) Manufacturing device for aluminum mould wall bolt hole plugging block
CN216839925U (en) Civil engineering construction concrete built-in fitting
JPS6315449Y2 (en)
CN217552693U (en) Culvert pipe prefabricated distributor and suit
CN207609176U (en) A kind of pan feeding conduit for casting concrete
CN218264225U (en) Die for integrally pouring and molding ditch bottom slope-seeking drainage ditch
CN211164557U (en) Triangular concrete block manufacturing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant