CN202215169U - Pump circulating construction device and in-water pile construction system - Google Patents

Pump circulating construction device and in-water pile construction system Download PDF

Info

Publication number
CN202215169U
CN202215169U CN2011202966140U CN201120296614U CN202215169U CN 202215169 U CN202215169 U CN 202215169U CN 2011202966140 U CN2011202966140 U CN 2011202966140U CN 201120296614 U CN201120296614 U CN 201120296614U CN 202215169 U CN202215169 U CN 202215169U
Authority
CN
China
Prior art keywords
mud
pump
slurry
construction
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202966140U
Other languages
Chinese (zh)
Inventor
杨国强
刘永福
孙新瑞
杜佐龙
夏扬帆
朱长亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
Roads & Bridges Co Ltd Of Cccec
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Roads & Bridges Co Ltd Of Cccec filed Critical Roads & Bridges Co Ltd Of Cccec
Priority to CN2011202966140U priority Critical patent/CN202215169U/en
Application granted granted Critical
Publication of CN202215169U publication Critical patent/CN202215169U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a pump circulating construction device, which comprises a slurry supplementing assembly and a slurry extracting assembly, wherein the slurry supplementing assembly comprises a slurry pump arranged in a slurry pond and a slurry supplementing pipeline which is connected with the slurry pump and extends into a well hole from the slurry pump. The slurry extracting assembly comprises a sandrock pump arranged in a slurry pond and a slurry extracting pipeline which is connected with the sandrock pump and used for conveying slurry. The utility model further discloses an in-water pile construction system which comprises the pump circulating construction device. The problem of well leakage is solved by utilizing a simple mechanism, follow-up construction can be operated according to normal positive cycle construction methods, leaking stoppage treatment can be not performed on well leakage within an applied range, construction is performed directly according to an original construction process, and construction time and cost are saved.

Description

Pump circulation construction equipment and water king-pile construction system
Technical field
The utility model relates to a kind of water king-pile construction equipment, particularly a kind of pump circulation construction equipment.
Background technology
In the water during pile driving construction, because a variety of causes, occur the growth of long casing bottom leaky or bedrock fracture sometimes and stratum seepage (formal name used at school is called leakage) occurs.When leakage occurring, the improper decline of mud face in the well, well head can't return slurry, and the direct circulation construction can't continue.
Seepage treatment in the pile foundation pore forming process is got up very complicated, and cost is high.At first to carry out leak stopping, need a large amount of mud materialses; Next is that leak stopping will spend the long engineering time; The 3rd is because the viscosity of loss circulation material is big, has increased the difficulty of follow-up construction greatly.
Because during pile driving construction, platform is higher in the water, the inside and outside head difference of casing is big, handles difficulty more when leakage rain occurring.
Summary of the invention
The purpose of the utility model is the defective that overcomes prior art, and water king-pile leakage problems provides a kind of pump circulation construction equipment.
Technical scheme of the present invention comprises:
A kind of pump circulation construction equipment comprises:
The mud supplemental component comprises that the slush pump that is located in the mud pit replenishes pipeline with the mud that is connected with this slush pump and extend to this wellhole from this slush pump;
Mud extracts assembly, comprises the gravel pump that is located in the wellhole and is connected with this gravel pump, the mud extraction pipeline of slurry conveyed.
Wherein, this mud replenishes pipeline and extends to drill bit.Mud ditch provides from this mud and extracts the mud path of pipeline to this mud pit, and vibrosieve is arranged on this mud path.This gravel pump is located at balance liquid level below, and preferably, this gravel pump is located at one meter, balance liquid level below.
Technical scheme of the present invention also comprises:
A kind of water king-pile construction system comprises wellhole and mud pit, in this wellhole, is provided with the construction drill bit, and this system also comprises:
The mud supplemental component comprises that the slush pump that is located in this mud pit replenishes pipeline with the mud that is connected with this slush pump and extend to this wellhole from this slush pump;
Mud extracts assembly, comprises the gravel pump that is located in this wellhole and is connected with this gravel pump, the mud extraction pipeline of slurry conveyed.
Wherein, this mud replenishes pipeline and extends to drill bit.Mud ditch provides from this mud and extracts the mud path of pipeline to this mud pit, and vibrosieve is arranged on this mud path.This gravel pump is located at balance liquid level below, and preferably, this gravel pump is located at one meter, balance liquid level below.
Positive progressive effect of the present invention is: utilize simple mechanism to solve the leakage problem; Follow-up construction can be by normal direct circulation job practices operation; Can not carry out leak stopping for the leakage in the scope of application and handle, directly construct, practice thrift engineering time and cost by former construction technology.
Description of drawings
Fig. 1 is the utility model schematic representation of apparatus.
The specific embodiment
Below in conjunction with the accompanying drawing illustrated embodiment the utility model is elaborated.
The pile foundation direct circulation is constructed must guarantee following condition: pile foundation breast wall is stable during the balance liquid level, the retaining wall when quality of mud fluid can guarantee construction is stable and return the slurry requirement and well head returns slurry.
Shown in preceding, when leakage occurring in the construction, the improper decline of mud face in the well, well head can't return slurry, and the direct circulation construction can't continue.After leakage appearred in the water king-pile, because outside head effect, liquid level dropped to and just no longer descends after the external water plane is consistent in the well.
The principle of the utility model is to adopt the direct circulation of double pump mud, mainly is to utilize slush pump that the mud for preparing is passed the leakage section through conduit, is injected into the position of Hot work in progress, thereby satisfies the condition of direct circulation construction.
As shown in Figure 1, the device of the utility model comprises that mud supplemental component 100 and mud extract assembly 200.
This mud supplemental component 100 comprises the slush pump 110 that is located in the mud pit 20 and replenishes pipeline 120 from the mud that this slush pump 110 extends to drill bit 30 wellhole 10; The slurry transportation that the additional pipeline 120 of this mud is got these slush pump 110 pumps arrives this drill bit 30, misses the mud that goes with additional well.
This mud extracts that assembly 200 comprises the gravel pump 210 that is located in the wellhole 10 and is connected with this gravel pump 210, the mud extraction pipeline 220 of slurry conveyed.This mud extracts pipeline 220 sandstone is drawn on the mud ditch 40, utilizes vibrosieve 50 to filter out rock ballast, and the slurry transportation after mud ditch 40 will filter is in this mud pit 30.
Wherein, this gravel pump 210 is located near balance liquid level (below), returns slurry so that form well head.
As spillage takes place, the binary cycle system that adopts slush pump 110 and gravel pump 210 to form carries out anti-slag construction.By slush pump 110 mud in the mud pit 20 is evacuated in the wellhole 10, the mouth of pipe that mud replenishes pipeline 120 is fixed on the drill bit 30, bring to the hole by drill bit 30 at the bottom of.
By little hoist engine gravel pump 210 is transferred following 1 meter of water level (balance liquid level) to the wellhole.Opening gravel pump 210 is evacuated to mud in the hole in the mud pit; Dsah-pot can be installed at gravel pump mouth of pipe place; After buffering, filter on slurry flows to vibrosieve 50, the mud after the filtration flow in the mud pit 20 through mud ditch 40, so forms the circulating system of mud.
The utility model is applicable to that leakage is not more than 30m 3The geology feelings portion condition of/h, pile foundation is good, the situation of no soft layer,
Although the utility model is described according to its preferred implementation, there are the change, displacement and the various substitute equivalents that fall in the utility model scope.Here the example that provides only is illustrative, rather than to the restriction of the utility model.
For the sake of simplicity, this manual has omitted the description to known technology.

Claims (10)

1. pump circulation construction equipment is characterized in that this device comprises:
The mud supplemental component comprises:
Be located at the slush pump in the mud pit;
The mud that is connected with this slush pump and extends to this wellhole from this slush pump replenishes pipeline;
Mud extracts assembly, comprising:
Be located at the gravel pump in the wellhole;
Be connected with this gravel pump, the mud of slurry conveyed extracts pipeline.
2. pump circulation construction equipment according to claim 1 is characterized in that, this mud replenishes pipeline and extends to drill bit.
3. pump circulation construction equipment according to claim 1 and 2 is characterized in that, mud ditch provides from this mud and extracts the mud path of pipeline to this mud pit, and vibrosieve is arranged on this mud path.
4. pump circulation construction equipment according to claim 3 is characterized in that, this gravel pump is located at balance liquid level below.
5. pump circulation construction equipment according to claim 4 is characterized in that, this gravel pump is located at one meter, balance liquid level below.
6. a water king-pile construction system comprises wellhole and mud pit, in this wellhole, is provided with the construction drill bit, it is characterized in that this system also comprises:
The mud supplemental component comprises:
Be located at the slush pump in this mud pit;
The mud that is connected with this slush pump and extends to this wellhole from this slush pump replenishes pipeline;
Mud extracts assembly, comprising:
Be located at the gravel pump in this wellhole;
Be connected with this gravel pump, the mud of slurry conveyed extracts pipeline.
7. water king-pile construction system according to claim 6 is characterized in that, this mud replenishes pipeline and extends to this construction drill bit.
8. according to claim 6 or 7 described water king-pile construction systems, it is characterized in that mud ditch provides from this mud and extracts the mud path of pipeline to this mud pit, vibrosieve is arranged on this mud path.
9. water king-pile construction system according to claim 8 is characterized in that, this gravel pump is located at balance liquid level below.
10. water king-pile construction system according to claim 9 is characterized in that, this gravel pump is located at one meter, balance liquid level below.
CN2011202966140U 2011-08-16 2011-08-16 Pump circulating construction device and in-water pile construction system Expired - Lifetime CN202215169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202966140U CN202215169U (en) 2011-08-16 2011-08-16 Pump circulating construction device and in-water pile construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202966140U CN202215169U (en) 2011-08-16 2011-08-16 Pump circulating construction device and in-water pile construction system

Publications (1)

Publication Number Publication Date
CN202215169U true CN202215169U (en) 2012-05-09

Family

ID=46014429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202966140U Expired - Lifetime CN202215169U (en) 2011-08-16 2011-08-16 Pump circulating construction device and in-water pile construction system

Country Status (1)

Country Link
CN (1) CN202215169U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704872A (en) * 2012-06-29 2012-10-03 中铁大桥局集团第四工程有限公司 Gas-lift reverse circulation slurry circulation system
CN105672920A (en) * 2016-03-24 2016-06-15 上海市机械施工集团有限公司 Gas lift reverse circulation liquid level control device and control method
CN105863531A (en) * 2016-05-27 2016-08-17 安徽科恩新能源有限公司 Slurry collection device of ground source heat pump
CN107143282A (en) * 2017-07-14 2017-09-08 冯克俊 A kind of hole-forming device of building lot construction slurry-sucking
CN114307336A (en) * 2021-11-24 2022-04-12 中国建筑一局(集团)有限公司 Be used for aquatic pile foundation construction mud and drilling slag filtering separation device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704872A (en) * 2012-06-29 2012-10-03 中铁大桥局集团第四工程有限公司 Gas-lift reverse circulation slurry circulation system
CN102704872B (en) * 2012-06-29 2014-12-10 中铁大桥局集团第四工程有限公司 Gas-lift reverse circulation slurry circulation system
CN105672920A (en) * 2016-03-24 2016-06-15 上海市机械施工集团有限公司 Gas lift reverse circulation liquid level control device and control method
CN105672920B (en) * 2016-03-24 2018-06-26 上海市机械施工集团有限公司 A kind of gas lift reverse circulation leveling device and control method
CN105863531A (en) * 2016-05-27 2016-08-17 安徽科恩新能源有限公司 Slurry collection device of ground source heat pump
CN107143282A (en) * 2017-07-14 2017-09-08 冯克俊 A kind of hole-forming device of building lot construction slurry-sucking
CN114307336A (en) * 2021-11-24 2022-04-12 中国建筑一局(集团)有限公司 Be used for aquatic pile foundation construction mud and drilling slag filtering separation device

Similar Documents

Publication Publication Date Title
CN202215169U (en) Pump circulating construction device and in-water pile construction system
CN106837274B (en) A method of oil displacement agent injection oil reservoir being improved into recovery ratio using pressure break
CN103485345A (en) Construction method for covering layer closed porthole high-pressure curtain grouting
CN204252967U (en) Hot dry rock multi cycle heating system
CN102434124A (en) Successive-compounding-process based plugging method for well drilling
CN105887886A (en) Strong karst development stratum curtain grouting construction method
CN102704872A (en) Gas-lift reverse circulation slurry circulation system
CN104632152A (en) Injection increase and pressure reduction system for water injection wells of ultralow permeability oilfield and method thereof
CN107387035A (en) Gas injection High Pressure Drain system in a kind of well
CN113653531B (en) Method for dredging low-permeability roof water
CN107227740A (en) The construction method that limestone cave cell wall is closed in construction of diaphragm wall
CN201443382U (en) Downhole dosing device
CN107387121B (en) Novel double-liquid grouting full-hydraulic coupling control system
CN204042855U (en) The auto water compensating device for boiler of carbon dioxide oil recovery pressure injection equipment
CN103899283A (en) Gravel pump gravel filling method
CN102278116B (en) Device and method for manufacturing underground frozen wall in cold areas in winter
CN202228038U (en) Pipe string for plugging shallow-layer sleeve leakage water injection well
CN107461182A (en) Layering fracturing sand control method
CN107558950A (en) Orientation blocking method for the closing of oil shale underground in situ production zone
CN202228060U (en) Pressure-relief liquid injection device for producing well
CN203891785U (en) Special joint pipe assembly for throwing of gravels in pipe of hydrogeological water well
CN203846996U (en) Well drilling device
CN104594369A (en) High-pressure group hole replacement grouting method and structure in karst region
CN206448273U (en) A kind of continuous steel frame aqueduct GG2# pier foundation grouting systems
CN205348204U (en) Light well point precipitation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CO.

Free format text: FORMER OWNER: ROAD AND BRIDGE BRANCH CHINA STATE CONSTRUCTION CIVIL CONSTRUCTION CO., LTD.

Effective date: 20140915

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200120 PUDONG NEW AREA, SHANGHAI TO: 200122 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20140915

Address after: 200122 Pudong New Area Century Avenue, Shanghai, No. 27, layer 1568

Patentee after: China Construction Eighth Engineering Division Co., Ltd.

Address before: 200120 Shanghai, Pudong South Road, No. 1036, long Yu building, building, floor, 27

Patentee before: ROADS & BRIDGES CO., LTD. OF CCCEC

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120509