CN202215008U - Novel assembly structure of ger - Google Patents

Novel assembly structure of ger Download PDF

Info

Publication number
CN202215008U
CN202215008U CN2011202428006U CN201120242800U CN202215008U CN 202215008 U CN202215008 U CN 202215008U CN 2011202428006 U CN2011202428006 U CN 2011202428006U CN 201120242800 U CN201120242800 U CN 201120242800U CN 202215008 U CN202215008 U CN 202215008U
Authority
CN
China
Prior art keywords
yurt
wallboard
roof system
splicing structure
light steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202428006U
Other languages
Chinese (zh)
Inventor
李卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011202428006U priority Critical patent/CN202215008U/en
Application granted granted Critical
Publication of CN202215008U publication Critical patent/CN202215008U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a novel assembly structure of a ger comprising wallboards and a roof. In plane view, the roof is in the shape of a regular polygon, and upper ends of the wallboards are corresponding to sides of the regular polygon. A ger main body can be formed by assembling the wallboards and the roof together. In the utility model, the prefabricated wallboards and the roof can be assembled together to form the ger main body on the spot, thereby the ger can be a permanent building, the construction process is simple, the construction costs can be saved, the efficiency can be improved, and the working time can be reduced.

Description

A kind of novel splicing structure of yurt
Technical field
The utility model relates to a kind of novel splicing structure of yurt.
Background technology
Yurt is the national traditional house of Mongolian nomadic people.Yurt is rounded, and sidewall is divided into several piece all around, and every high about 13 meters, compiles the brick work lid with wood strip.According to " black Da biographical sketch " record: " arched roof has two kinds: the system in Beijing, and use willow to be bone, think as southern net for catching beasts, can roll up easyproly, open the door in front, go up like umbrella frame, back down a key, the skylight of meaning all is clothing with the felt, horse back can carry.The system on meadow becomes hard circle surely with the willow group, and it is fixed that flog with felt in the footpath, can not roll up easyproly, and car is uploaded row." shortcoming of traditional yurt structure is: can not become permanent construction.
The utility model content
The utility model has been designed and developed a kind of novel splicing structure of yurt to above-mentioned technical problem.In the utility model, prefabricated wallboard and roof system are spliced into the yurt main body at the scene, make yurt become a kind of permanent construction, and work progress is simple, has saved construction cost, has improved efficient, has shortened man-hour.
The technical scheme that the utility model provides is:
A kind of novel splicing structure of yurt comprises wallboard and roof system, and the plan view of said roof system is a regular polygon, and wherein, the upper end of said wallboard is corresponding with the limit of the regular polygon of said roof system, and said wallboard and said roof system are spliced to form the yurt main body.
Preferably, the novel splicing structure of described yurt also comprises the bracing frame of vertical fixing in ground; Wherein, The summit of the regular polygon of said roof system is corresponding with a said bracing frame, and said roof system is fixed in the top of bracing frame, and said wallboard also is fixed in support frame as described above.
Preferably, in the novel splicing structure of described yurt, support frame as described above is a steelframe.
Preferably, in the novel splicing structure of described yurt, said wallboard has light steel frame, and the both sides of the light steel frame of said wallboard are sheet material, is heat insulating material between the light steel frame of said wallboard and the sheet material; Said roof system has light steel frame, and the both sides of the light steel frame of said roof system are sheet material, is heat insulating material between the light steel frame of said roof system and the sheet material.
Preferably, in the novel splicing structure of described yurt, the outside of said wallboard also is provided with side fascia; The outside of said roof system also is provided with side fascia.
Preferably, the novel splicing structure of described yurt also comprises the inner wall panel that is arranged in the said yurt main body, and said inner wall panel is fixedly connected on said wallboard or said adjacent inner wall panel.
The novel splicing structure of the described yurt of the utility model is spliced into the yurt main body at the scene with prefabricated wallboard and roof system, makes yurt become a kind of permanent construction; And work progress is simple; Save construction cost, improved efficient, shortened man-hour.
Description of drawings
Fig. 1 is the structural representation of the novel splicing structure of the described yurt of the utility model.
Fig. 2 is the structural representation of bracing frame of the novel splicing structure of the described yurt of the utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done further detailed description, can implement according to this with reference to the manual literal to make those skilled in the art.
As depicted in figs. 1 and 2; The utility model provides a kind of novel splicing structure of yurt; Comprise wallboard 2 and roof system 1, the plan view of said roof system 1 is a regular polygon, wherein; The upper end of said wallboard 2 is corresponding with the limit of the regular polygon of said roof system 1, and said wallboard 2 is spliced to form the yurt main body with said roof system 1.
The piece number of wallboard 2 equates that with the number on the limit of the regular polygon of roof system 1 polylith wallboard 2 and roof system 1 have been spliced to form the main body of yurt.
The novel splicing structure of described yurt; Also comprise the bracing frame 3 of vertical fixing in ground, wherein, the summit of the regular polygon of said roof system 1 is corresponding with a said bracing frame 3; Said roof system 1 is fixed in the top of bracing frame 3, and said wallboard 2 also is fixed in support frame as described above 3.
In the novel splicing structure of described yurt, support frame as described above 3 is a steelframe.
In the novel splicing structure of described yurt, said wallboard 2 has light steel frame, and the both sides of the light steel frame of said wallboard 2 are sheet material, is heat insulating material between the light steel frame of said wallboard 2 and the sheet material; Said roof system 1 has light steel frame, and the both sides of the light steel frame of said roof system 1 are sheet material, is heat insulating material between the light steel frame of said roof system 1 and the sheet material.
In the novel splicing structure of described yurt, the outside of said wallboard 2 also is provided with side fascia; The outside of said roof system 1 also is provided with side fascia.
The novel splicing structure of described yurt also comprises the inner wall panel that is arranged in the said yurt main body, and said inner wall panel is fixedly connected on said wallboard and/or said adjacent inner wall panel.
In the inside of yurt main body, can also constitute the room through inner wall panel is set.
Although the embodiment of the utility model is open as above; But it is not restricted to listed utilization in manual and the embodiment; It can be applied to the field of various suitable the utility model fully, for being familiar with those skilled in the art, can easily realize other modification; Therefore under the universal that does not deviate from claim and equivalency range and limited, the legend that the utility model is not limited to specific details and illustrates here and describe.

Claims (6)

1. the novel splicing structure of a yurt comprises wallboard and roof system, it is characterized in that; The plan view of said roof system is a regular polygon; Wherein, the upper end of said wallboard is corresponding with the limit of the regular polygon of said roof system, and said wallboard and said roof system are spliced to form the yurt main body.
2. the novel splicing structure of yurt as claimed in claim 1; It is characterized in that; Also comprise the bracing frame of vertical fixing in ground, wherein, the summit of the regular polygon of said roof system is corresponding with a said bracing frame; Said roof system is fixed in the top of bracing frame, and said wallboard also is fixed in support frame as described above.
3. the novel splicing structure of yurt as claimed in claim 2 is characterized in that, support frame as described above is a steelframe.
4. the novel splicing structure of yurt as claimed in claim 1 is characterized in that, said wallboard has light steel frame, and the both sides of the light steel frame of said wallboard are sheet material, is heat insulating material between the light steel frame of said wallboard and the sheet material; Said roof system has light steel frame, and the both sides of the light steel frame of said roof system are sheet material, is heat insulating material between the light steel frame of said roof system and the sheet material.
5. the novel splicing structure of yurt as claimed in claim 4 is characterized in that, the outside of said wallboard also is provided with side fascia; The outside of said roof system also is provided with side fascia.
6. the novel splicing structure of yurt as claimed in claim 1 is characterized in that, also comprises the inner wall panel that is arranged in the said yurt main body, and said inner wall panel is fixedly connected on said wallboard and/or said adjacent inner wall panel.
CN2011202428006U 2011-07-11 2011-07-11 Novel assembly structure of ger Expired - Fee Related CN202215008U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202428006U CN202215008U (en) 2011-07-11 2011-07-11 Novel assembly structure of ger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202428006U CN202215008U (en) 2011-07-11 2011-07-11 Novel assembly structure of ger

Publications (1)

Publication Number Publication Date
CN202215008U true CN202215008U (en) 2012-05-09

Family

ID=46014268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202428006U Expired - Fee Related CN202215008U (en) 2011-07-11 2011-07-11 Novel assembly structure of ger

Country Status (1)

Country Link
CN (1) CN202215008U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888301A (en) * 2016-04-19 2016-08-24 周玉刚 Mobile yurt
CN108952162A (en) * 2018-07-20 2018-12-07 呼和浩特市中朵兴泰远大建筑工业有限公司 A kind of method of construction of assembled yurt
CN112267712A (en) * 2020-11-27 2021-01-26 华丽联合高科技有限公司 Manufacturing method of assembled polygonal Mongolian yurt
CN112832560A (en) * 2020-12-31 2021-05-25 河南省腾程建筑工程有限公司 Wind load actual measurement room capable of changing building area

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888301A (en) * 2016-04-19 2016-08-24 周玉刚 Mobile yurt
CN108952162A (en) * 2018-07-20 2018-12-07 呼和浩特市中朵兴泰远大建筑工业有限公司 A kind of method of construction of assembled yurt
CN112267712A (en) * 2020-11-27 2021-01-26 华丽联合高科技有限公司 Manufacturing method of assembled polygonal Mongolian yurt
CN112832560A (en) * 2020-12-31 2021-05-25 河南省腾程建筑工程有限公司 Wind load actual measurement room capable of changing building area
CN112832560B (en) * 2020-12-31 2022-12-13 安徽新天柱工程规划设计研究院有限公司 Wind load actual measurement room capable of changing building area

Similar Documents

Publication Publication Date Title
CN202215008U (en) Novel assembly structure of ger
CN202190047U (en) Fabricated steel ground cable channel
CN205637372U (en) Energy -saving building
CN107217815A (en) A kind of resistance to compression, safety-type assembling type steel structure elevator
CN206571021U (en) A kind of tiger window-frame of assembled integrated house
CN2809102Y (en) Car parking roof using climbing vine
CN202310820U (en) Goat house for breeding goats
CN202857414U (en) Disassembling type sunlight greenhouse usable in summer and winter
CN102763577B (en) Dual-purpose demountable sunlight greenhouse used in winter and summer
CN202819154U (en) Greenhouse
CN201652695U (en) Stream guidance structure of natural ventilation device on roof
CN205143040U (en) Wet cob wall sunlight greenhouse that beats
CN201486182U (en) Sunlight aperture house
CN106703277A (en) Integrated house dormer frame structure
CN202969982U (en) Mobile board room
CN207568252U (en) A kind of underground machine room
CN103583271A (en) Method for manufacturing greenhouse roller shutter
CN202202494U (en) Corrugated solar cell tile
CN203393738U (en) Electric pole fixing structure free of stay wire and fixing foundation
CN201400960Y (en) Archaizing lu roof connecting body tile
CN208637997U (en) A kind of buried pipeline protective device
CN201507134U (en) Energy-saving and emission-reduction semi-underground garage
CN204899142U (en) Building body one deck exhaust pipe system and building body
CN202689612U (en) Hollow brick curing chamber
CN210325039U (en) Propaganda device is promoted to legal knowledge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Century Mansion integrated residential technology Co., Ltd.

Assignor: Li Weidong

Contract record no.: 2014990000536

Denomination of utility model: Novel assembly structure of ger

Granted publication date: 20120509

License type: Exclusive License

Record date: 20140714

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120509

Termination date: 20150711

EXPY Termination of patent right or utility model