CN202175498U - Hanger for wire spool - Google Patents

Hanger for wire spool Download PDF

Info

Publication number
CN202175498U
CN202175498U CN 201120285082 CN201120285082U CN202175498U CN 202175498 U CN202175498 U CN 202175498U CN 201120285082 CN201120285082 CN 201120285082 CN 201120285082 U CN201120285082 U CN 201120285082U CN 202175498 U CN202175498 U CN 202175498U
Authority
CN
China
Prior art keywords
hanger
channel
steel
lead dish
wire spool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120285082
Other languages
Chinese (zh)
Inventor
孙云
陈宏学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Original Assignee
Hubei Electric Transmission & Transformation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Electric Transmission & Transformation Engineering Co filed Critical Hubei Electric Transmission & Transformation Engineering Co
Priority to CN 201120285082 priority Critical patent/CN202175498U/en
Application granted granted Critical
Publication of CN202175498U publication Critical patent/CN202175498U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a hanger for a wire spool, which comprises two channel steel pieces of the same length and four lifting lugs, wherein the web plates of the two channel steel pieces are in parallel to and fixedly connected with each other, the lifting lugs are arranged on reinforcing plates which are arranged at the two ends of the channel steel pieces, and a plurality of steel plates are welded at the middle parts of the reinforcing plates of the two channel steel pieces to reinforce the channel steel pieces. When the hanger is used, the steel wires which are connected with the two ends of the steel bar in the center of the wire spool kept in parallel during the lifting process, and the steel wires connected onto the lifting hook of the crane are directly connected with the lifting lugs, so as to prevent the wire spool from being squeezed by the lifting steel wires and meet the requirement for keeping the wire spool intact after construction. The hanger is advantageous in simple and smart structure.

Description

Lead dish suspension bracket
Technical field
The utility model relates to the auxiliary Work tool that uses in the operation in the high-voltage fence engineering, relates in particular to a kind of lead dish suspension bracket that is used to lift by crane the lead dish.
Background technology
State net company releases new lead dish in ± 800kV makes progress lineman's journey, require the lead dish after construction, to reclaim, and guarantee the intact of lead dish.Adopt traditional lifting mode hoisting wirerope that the lead dish is produced the application force of extruding, consult shown in Figure 1ly, cause the damage of lead dish bigger, can not guarantee that the lead dish uses back requirement in working order in construction.
Existing another kind of lead dish suspension bracket; Consult shown in Figure 2; Though use this suspension bracket to avoid hoisting wirerope that the lead dish is pushed the damage that causes the lead dish, the suspension bracket of this structure uses very inconvenience satisfying ten minutes heaviness under the condition of burden requirement.
Summary of the invention
The utility model is to the problem of above existence, designs a kind ofly satisfying under the condition of burden requirement, and simplified structure makes suspension bracket more light, the good lead dish suspension bracket of service condition in practice of construction.
Be to realize above-mentioned purpose, a kind of lead dish of the utility model institute design-calculated suspension bracket comprises channel-section steel and four hangers of two equal in length, and the web of two channel-section steels is parallel to each other and captive joint, and hanger is installed on the gusset at channel-section steel two ends.
In technique scheme: the gusset middle part of said two channel-section steels is welded with the several piece steel plate.
Further, said hanger inner ring and outer ring are rounded, and the hanger both sides are equipped with reinforced rib, and an end of reinforced rib is captiveed joint with gusset.
Again further, the web justify align and the weld together of said two channel-section steels.
Utility model adopts technique scheme to have following advantage:
When the utility model uses; The rod iron two ends bonded assembly steel wire of lead disk center is keeping parallelism in the process of lifting; The bonded assembly steel wire directly is connected with hanger on the crane hook; Effectively avoided hoisting wirerope that the lead dish is caused extruding, guaranteed that the lead dish uses back requirement in working order in construction; The main body of lead dish suspension bracket is to be welded by two channel-section steels; The gusset middle part of channel-section steel evenly is welded with the several piece steel plate, and to reinforce the both sides channel-section steel, hanger is installed at the gusset two ends; And reinforced rib is installed in the hanger both sides, guaranteed the requirement of the big load of new lead dish (8.6 tons).In addition, the utility model is simple in structure, makes suspension bracket more light, and condition of service is good in practice of construction.
Description of drawings
Fig. 1 is existing a kind of lead dish suspension bracket running condition reference diagram;
Fig. 2 is existing another kind of lead dish hanger structure scheme drawing;
Fig. 3 is the main TV structure scheme drawing of the utility model;
Fig. 4 is the left TV structure scheme drawing of Fig. 3;
Fig. 5 is the plan structure scheme drawing of Fig. 3;
Fig. 6 is the running condition reference diagram of the utility model;
Among the figure: 1-channel-section steel (1-1-web, 1-2-gusset), 2-hanger, 3-steel plate, 4-reinforced rib, 5-rod iron, 6-steel rope, 7-lead dish, 8-crane hook.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the utility model is done further to specify.
Like Fig. 3, Fig. 4, shown in Figure 5; A kind of lead dish of the utility model design-calculated suspension bracket; Channel-section steel 1 and four hangers 2 of comprising two equal in length; The web 1-1 of two channel-section steels 1 is parallel to each other and captive joint, particularly among the embodiment, with the web 1-1 justify align and the weld together of two channel-section steels 1.
Four hanger 2 branches are installed on the gusset 1-2 at two channel-section steel 1 two ends, and the gusset 1-2 of two channel-section steel 1 both sides middle part evenly (adjacent two block plates 3 distance at interval is equal) is welded with several piece steel plate 3, is used to reinforce the dual-side of channel-section steel 1.Hanger 2 inner rings and outer ring are rounded, and hanger 2 both sides are equipped with reinforced rib 4, and an end of reinforced rib 4 is captiveed joint with gusset 1-2, and reinforced rib 1 is welded on four hangers 2 and the channel-section steel 1, strengthen intensity when playing connection and lifting.Also weld by reinforced rib 4 around the hanger lifting hole(eyelet), increase intensity.
During use, as shown in Figure 6, with the rod iron 5 two ends branches at lead dish 7 centers with steel rope 6 one end captive joints and sling; Steel rope 6 other end branches that connect rod iron 5 two ends are fixed on the hanger 2 of channel-section steel 1 two ends downside; Hanger 2 branches of channel-section steel 1 two ends upside are connected on the crane hook 8 with steel rope 6, because in the lifting process, the state of two hoisting wirerope 6 keeping parallelisms; Can not avoid causing the damage of lead dish to the extruding of lead dish; Integral structure has been guaranteed the requirement of the big load of new lead dish (8.6 tons) and simple in structure, and whole suspension bracket is light, and condition of service is good in practice of construction.

Claims (4)

1. lead dish suspension bracket is characterized in that: comprise channel-section steel (1) and four hangers (2) of two equal in length, the web (1-1) of two channel-section steels (1) is parallel to each other and captive joint, and hanger (2) is installed on the gusset (1-2) at channel-section steel (1) two ends.
2. lead dish suspension bracket according to claim 1 is characterized in that: gusset (1-2) middle part of said two channel-section steels (1) is welded with several piece steel plate (3).
3. lead dish suspension bracket according to claim 1 and 2 is characterized in that: said hanger (2) inner ring and outer ring are rounded, and hanger (2) both sides are equipped with reinforced rib (4), and an end of reinforced rib (4) is captiveed joint with gusset (1-2).
4. lead dish suspension bracket according to claim 1 and 2 is characterized in that: web (1-1) justify align and the weld together of said two channel-section steels (1).
CN 201120285082 2011-08-05 2011-08-05 Hanger for wire spool Expired - Lifetime CN202175498U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120285082 CN202175498U (en) 2011-08-05 2011-08-05 Hanger for wire spool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120285082 CN202175498U (en) 2011-08-05 2011-08-05 Hanger for wire spool

Publications (1)

Publication Number Publication Date
CN202175498U true CN202175498U (en) 2012-03-28

Family

ID=45865393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120285082 Expired - Lifetime CN202175498U (en) 2011-08-05 2011-08-05 Hanger for wire spool

Country Status (1)

Country Link
CN (1) CN202175498U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105565173A (en) * 2015-12-31 2016-05-11 上海市机械施工集团有限公司 Safe carrying pole frame lifting device for superheavy giant column double-crane lifting and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105565173A (en) * 2015-12-31 2016-05-11 上海市机械施工集团有限公司 Safe carrying pole frame lifting device for superheavy giant column double-crane lifting and use method thereof

Similar Documents

Publication Publication Date Title
CN204281108U (en) A kind of transfer crane
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN102070071A (en) Steel reinforcement cage hoisting method
CN202321966U (en) Special lifting appliance for multi-lifting-point high wire coil rod
CN201424846Y (en) Hold pole bearing rope fixture
CN202175498U (en) Hanger for wire spool
CN209339715U (en) A kind of girdle ring attachment device for electric power pole
CN205527291U (en) A frame type frame for hoisting two superimposed sheets
CN202280278U (en) Connecting special clamp of bearing rope
CN103663107A (en) Adjustable hoisting beam
CN102777036A (en) Air reverse mechanical joint construction method of super-long vertical reinforcement cage
CN207361602U (en) A kind of steel structure hoisting instrument
CN203513083U (en) Combined hanger special for bundled slender materials
CN202899735U (en) Lifting tool for high-pressure iron tower support
CN101402435B (en) Special sling for inner bore of step and its use method
CN210458987U (en) Soft temporary pocket hoisting device is changed to jib
CN203486789U (en) Portable dual-flat-arm floor type derrick
CN103738852A (en) Weight testing device of crane
CN203095395U (en) Steel plate lifting rigging
CN201961955U (en) Dual C-shaped lifting sling for rolling plate
CN204198259U (en) Tower cylinder suspender
CN202116190U (en) Hoisting tool of oversized casting
CN204645039U (en) The operation pylon of hole-drilling pile-filling machine
CN103303815A (en) Tower crane standard knot
CN204873599U (en) Efficient hoisting machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130121

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee before: Hubei Electric Power Transmission & Distribution Engineering Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20130121

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Patentee after: State Grid Corporation of China

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Patentee before: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120328