High voltage iron tower sets up uses suspender
Technical field
The utility model relates to the construction tool in the high voltage iron tower assembling process of a kind of power construction field setting up ultra-high-voltage power line, refers in particular to and sets up the suspender that the high voltage iron tower steel pole is used.
Background technology
In transmission line of electricity, ultra high-tension transmission line need to set up with high voltage iron tower, four angle suspension towers that the main body of high voltage iron tower generally is comprised of four columns, and every root post is vertically assembled by some steel poles.When setting up the higher heavier members such as steel pole of high voltage iron tower, need to the members such as steel pole be lifted to hoist and traction machine the top of the steel pole of having holded up.In the lifting process, the unsettled pole that arranges in top of four groups of steel poles holding up need to assembled, the top of pole arranges pulley, the hoist and traction machine setting on the ground, on the ground at the center of four angle suspension towers a traction pulley is set also, the traction that arranges on the ground need to be fixed with several stay cords with pulley.The wire rope of the members such as lifting steel pole passes from the pulley on pole top, one end is connected on the steel pole of ground preparation lifting, then the pulley that the other end passes traction usefulness on the ground, four angle suspension tower centers is connected on the hoist and traction machine, hoist and traction machine is lifted to the top of pole by the pulling wire rope with members such as steel poles, thereby the top that is connected to the steel pole of having holded up is installed.When the lifting steel pole, existing lifting method is that wire rope is directly fastened on the flange of steel pole, then lifts by crane.This connected mode is both unstable also insecure, and is also very inconvenient during loading and unloading, causes easily the generation of construction accident, and in the process of lifting steel pipe, steel pipe need to carry out movement and the rotation of certain position, and is very difficult when causing lifting, and need to manually assist and adjust and control.
The utility model content
The utility model technical issues that need to address provide a kind of easy to loading and unloading, be connected firmly, suspender that working strength is high uses when setting up high-tension electricity steel tower lifting steel pole.
For solving the problems of the technologies described above, technical solution adopted in the utility model is: a kind of high voltage iron tower sets up uses suspender, comprise fixed head and lifting plate, the center of described fixed head is provided with the installing hole that connects the bolt that the steel pole flange uses, the bilateral symmetry of this installing hole arranges two blocks of vertical lifting plates with hole for hoist, is coated with the lifting bolt in the hole for hoist of two lifting plates.
The further improvement of the utility model concrete structure is: described fixed head is rectangular slab.
The further improvement of the utility model concrete structure is: the top of described lifting plate is for semicircle, and the bottom is rectangle.
The further improvement of the utility model concrete structure is: the both sides of the installing hole between described two lifting plates on the fixed head are welded with the strip connecting plate that supports two lifting plates.
The further improvement of the utility model concrete structure is: be welded with two blocks of large gusseted plates that are positioned at a middle little gusseted plate and are positioned at little gusseted plate both sides above the outside of described lifting plate, the fixed head.
Owing to adopted technique scheme, the obtained technological progress of the utility model is: high voltage iron tower of the present utility model is mainly used in the high voltage iron tower assembling process of power construction field setting up ultra-high-voltage power line with suspender, be a kind of easy to loading and unloading, be connected firmly, suspender that working strength is high.
The ad hoc structure of the flange that arranges according to high voltage iron tower steel pole two ends, with the lifting bolt between two lifting plates steel wire loop is connected on the suspender, then in the installing hole that the fixed head center arranges, install set bolt, the flange of this suspender with steel pole linked together, can lift by crane.This suspender is firmly stable in the use, but very convenient in cargo handling process, has guaranteed the safety and stability in the erection process.
The fixed head of this suspender adopts rectangular slab and top for semicircle, bottom are the lifting plate of rectangular slab, has not only guaranteed to be connected closely with steel pole, and at the plate face two lifting plates has been set, and more convenient the grade with wire rope with connecting band is connected during for lifting.
The gripper shoe of the strip connecting plate of the inboard welding of two lifting plates of the present utility model and the welding of lifting plate outer panel, can and lift the effect that plate plays reinforcement to fixed head, guarantee like this working strength of suspender in high voltage iron tower assembling erection process, guaranteed the safety of construction.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model side-looking structural representation;
Fig. 3 is the utility model plan structure schematic diagram.
Among the figure: 1, little gusseted plate, 2, large gusseted plate, 3, the lifting plate, 4, strip connecting plate, 5, installing hole, 6, hole for hoist, 7, fixed head, 8, the lifting bolt.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further details.
A kind of high voltage iron tower sets up uses suspender, as shown in drawings, comprise fixed head 7 and lifting plate 3, fixed head 7 is rectangular slab, the center of fixed head 7 is provided with installing hole 5, this installing hole is used for installing the bolt that connection steel pole flange is used, the bilateral symmetry of installing hole 5 arranges two blocks of vertical lifting plates 3, lifting plate 3 is vertical with fixed head 7, and with the Central Symmetry of installing hole 5, the top of lifting plate 3 be semicircle, and the bottom is rectangle, lifting plate 3 tops are provided with in the hole for hoist 6 of hole for hoist 6, two lifting plates 3 and are coated with lifting bolt 8.Two liftings are welded with strip connecting plate 4 between the plates 3, and strip connecting plate 4 is positioned at the both sides of installing hole 5, strip connecting plate 4 two ends and 3 welding of lifting plate, below and fixed head 7 welding.The outside at lifting plate 3 also is welded with gripper shoe, gripper shoe comprises a little gusseted plate 1 and two blocks of large gusseted plates 2, little gusseted plate 1 be positioned in the middle of hole for hoist below, large gusseted plate 2 is positioned at little gusseted plate 1 both sides, and little gusseted plate 1, large gusseted plate 2 are all and lifting plate 3, fixed head 7 continuous weldings.Strip connecting plate 4, little gusseted plate 1, large gusseted plate 2 pairs of liftings plate 3 and fixed head 7 play booster action.