CN107217909A - Guywire tower hanging method and the frock using this method - Google Patents

Guywire tower hanging method and the frock using this method Download PDF

Info

Publication number
CN107217909A
CN107217909A CN201710500860.5A CN201710500860A CN107217909A CN 107217909 A CN107217909 A CN 107217909A CN 201710500860 A CN201710500860 A CN 201710500860A CN 107217909 A CN107217909 A CN 107217909A
Authority
CN
China
Prior art keywords
tower
fixed
lifting
guywire
hoisting fixture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710500860.5A
Other languages
Chinese (zh)
Inventor
王浩
支绍文
何龙
杨昺铖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dy-Link Engineering & Technology Co ltd
Original Assignee
Dy-Link Engineering & Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dy-Link Engineering & Technology Co ltd filed Critical Dy-Link Engineering & Technology Co ltd
Priority to CN201710500860.5A priority Critical patent/CN107217909A/en
Publication of CN107217909A publication Critical patent/CN107217909A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342Arrangements for stacking tower sections on top of each other

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses a kind of Guywire tower hanging method, bracing wire tower foundation is installed, in the side installation foundation pole of the bracing wire tower foundation, Guywire tower hoisting fixture is fixed on the basic pole, in the upper end fixed hoisting connecting tooling of basic tower section, the basic tower section is lifted by crane and is fixed on the basis of the Guywire tower by the Guywire tower hoisting fixture, the Guywire tower hoisting fixture is moved up and fixed with the basic tower section, in the upper end fixed hoisting connecting tooling of second segment tower section, the second segment tower section is lifted by crane by the Guywire tower hoisting fixture and the top of the basic tower section is fixed on, the Guywire tower hoisting fixture is moved up and fixed with the tower section of the top, coordinate the lifting for completing next section of tower section paragraph by paragraph by the Guywire tower hoisting fixture and the lifting connecting tooling.After adopting the above technical scheme, needing to set up scaffold by original and going the time for installing Guywire tower to be shorten to from 2 weeks 34 days, construction efficiency is considerably increased, construction cost is reduced.

Description

Guywire tower hanging method and the frock using this method
Technical field
The present invention relates to a kind of Guywire tower hanging method and using the frock of this method.
Background technology
In traditional KV Electric Transmissions, constructed for the steel tower of overhead transmission line, when the height of tower is beyond general After the hoisting depth of Lifting implementses, integral installation has difficulties, at this moment many by the way of dispersing member is assembled on the spot.This The method of kind successively installs brandreth, it is necessary to which the field work of long period, the workload of work high above the ground is big and the construction period is long, shadow Ring whole project progress.For the deficient area of place and equipment, the method for Guywire tower is installed using scaffold is set up by ten Divide difficulty.
The content of the invention
The problem to be solved in the present invention be to provide it is a kind of simple in construction, mounting means easily Guywire tower hanging method and Using the frock of this method.
In order to solve the above-mentioned technical problem, the present invention is adopted the following technical scheme that:Guywire tower hanging method, installs bracing wire Tower foundation, in the side installation foundation pole of the bracing wire tower foundation, Guywire tower slinger is fixed on the basic pole Dress, in the upper end fixed hoisting connecting tooling of basic tower section, is lifted by crane the basic tower section by the Guywire tower hoisting fixture And be fixed on the basis of the Guywire tower, the Guywire tower hoisting fixture is moved up and fixed with the basic tower section, second The upper end fixed hoisting connecting tooling of section tower section, the second segment tower section by the Guywire tower hoisting fixture lifted by crane and consolidated Due to the top of the basic tower section, the Guywire tower hoisting fixture is moved up and fixed with the tower section of the top, by described Guywire tower hoisting fixture coordinates the lifting for completing next section of tower section paragraph by paragraph with the lifting connecting tooling.
Using the Guywire tower hoisting fixture of above-mentioned Guywire tower hanging method, including lifting mobile jib, cantilever beam assembly and at least Two groups of hoop components, the cantilever beam assembly includes fix bar and cantilever beam support arm, and the cantilever beam assembly passes through the fixation Bar is fixed on the upper end of the lifting mobile jib, and the hoop component is sheathed on the lifting mobile jib.
The fix bar of the lifting mobile jib and the cantilever beam assembly is hollow pipe, and lifting steel wire rope is hung by described The die of the fix bar of dress mobile jib and the cantilever beam assembly is passed through, and a upper end from the fix bar of steel wire rope is passed And connection lifts joint behind the end of the cantilever beam support arm.
The hoop component includes sleeve pipe, end plate and U bolt, and described sleeve pipe is sheathed on the lifting mobile jib, described Sleeve pipe is fixed by connector with the end plate, the both ends of the U bolt and the end plate connection.
The inner ring of described sleeve pipe is provided with the retainer of collar shape, the retainer and is along the circumferential direction evenly equipped with needle roller.
The sleeve upper end of the hoop component of bottom is fixed with casing flange.
The hoop component of the top is fixed with hand frame, and the bottom of the lifting mobile jib is provided with hand Steel wire rope clip is fixed with transition piece, the hand frame.
It is described using the lifting connecting tooling of above-mentioned Guywire tower hanging method, including lifting connector and tower section connector Lifting connector includes the connecting plate that can be connected with the Guywire tower hoisting fixture, the tower section connector including can with it is described The connection pole of tower section connection.
The connector and the tower section connector of lifting by crane is respectively supporting plate connector and rotary connector, the supporting plate Connector includes backing board, connection mobile jib and connecting plate, and the backing board and the connecting plate are individually fixed in the connection master The two ends of bar, the rotary connector includes adpting flange, connecting tube and connection pole, and the adpting flange is fixed on described The end of connecting tube and with the connecting tube insertion, the connection pole is fixed on the periphery of the connecting tube, the connecting tube It is sheathed on the connection mobile jib.
Ball is provided between the backing board and the adpting flange.
After adopting the above technical scheme, needing to set up scaffold by original and going the time for installing Guywire tower to be shorten to from 2 weeks 3-4 days, construction efficiency is considerably increased, construction cost is reduced.
Brief description of the drawings
Fig. 1 is basic pole scheme of installation
Fig. 2 is Guywire tower hoisting fixture and basic pole scheme of installation
Fig. 3 is that Guywire tower hoisting fixture moves up scheme of installation
Fig. 4 is Guywire tower hoisting fixture lifting second segment tower section schematic diagram
Fig. 5 is that tower section lifting completes bracing wire schematic diagram
Fig. 6 is the structural representation of Guywire tower hoisting fixture one embodiment
Fig. 7 is the partial enlarged drawing at A in Fig. 6
Fig. 8 is the partial enlarged drawing at B in Fig. 6
Fig. 9 is the partial enlarged drawing at C in Fig. 6
Figure 10 is the explosive view of hoop component
Figure 11 is the structural representation of the hoop component of bottom
Figure 12 is the structural representation of the Guywire tower hoisting fixture using hand mode
Figure 13 is the structural representation for lifting by crane connecting tooling one embodiment
Figure 14 is the sectional view that Figure 13 lifts by crane connecting tooling
Figure 15 is the structural representation of supporting plate connector in Figure 13 embodiments
Figure 16 is the structural representation of rotary connector in Figure 13 embodiments
Embodiment
Guywire tower hanging method, install bracing wire tower foundation, the bracing wire tower foundation side installation foundation pole 6 (such as Shown in Fig. 1), Guywire tower hoisting fixture (as shown in Figure 6) is fixed on the basic pole, is fixed in the upper end of basic tower section 7 Connecting tooling 8 is lifted by crane, the basic tower section is lifted by crane by the Guywire tower hoisting fixture and the bracing wire tower foundation is fixed on Upper (as shown in Figure 2), the Guywire tower hoisting fixture is moved up and (as shown in Figure 3) is fixed with the basic tower section, second The upper end fixed hoisting connecting tooling of section tower section, the second segment tower section by the Guywire tower hoisting fixture lifted by crane and consolidated Due to the top (as shown in Figure 4) of the basic tower section, the Guywire tower hoisting fixture is moved up and consolidated with the tower section of the top It is fixed, the lifting that next section of tower section is completed paragraph by paragraph is coordinated (as schemed with the lifting connecting tooling by the Guywire tower hoisting fixture Shown in 5).
As shown in fig. 6, using the Guywire tower hoisting fixture of above-mentioned Guywire tower hanging method, including lifting mobile jib 1, cantilever Beam assembly 2 and three groups of hoop components 3, as shown in fig. 7, the cantilever beam assembly includes fix bar 21 and cantilever beam support arm 22, institute The upper end that cantilever beam assembly is fixed on the lifting mobile jib by the fix bar is stated, the hoop component is sheathed on described hang Fill the middle and lower part of mobile jib.
The fix bar 21 of the lifting mobile jib 1 and the cantilever beam assembly is hollow pipe, the end of the cantilever beam support arm Provided with pulley, lifting is passed through with steel wire rope by the die of the lifting mobile jib and the fix bar of the cantilever beam assembly, steel wire rope A upper end from the fix bar pass and behind the end (pulley) of the cantilever beam support arm connection lifting joint 23.The other end of the steel wire rope is connected by pulley with motor and decelerator 4.During installation, by assembly pulley using bolt with double Cap is fixed on a cantilever beam, and fixed pin shaft and split pin are spacing to steel wire rope progress, install steel wire rope, steel cord ends are fixed Wedge joint, is then inserted in lifting mobile jib 1 by cantilever beam.
As shown in Figure 10, the hoop component 3 includes sleeve pipe 31, end plate 32 and U bolt 33, and described sleeve pipe is sheathed on On the lifting mobile jib, described sleeve pipe is fixed by connector 34 with the end plate, the both ends of the U shapes bolt with it is described End plate connection.The inner ring of described sleeve pipe is provided with the retainer 35 of collar shape, the retainer and is along the circumferential direction evenly equipped with rolling Pin.
As shown in figure 11, the sleeve upper end of the hoop component of bottom is fixed with casing flange 36, the institute of bottom The lower end of lifting mobile jib 1 can be fixed on by casing flange 36 by stating hoop component.
In above-mentioned Guywire tower hanging method, moving up for Guywire tower hoisting fixture can be using being twisted mode manually.Specific method It is:Hoop component is moved up after unclamping, and lifting mobile jib is increased using hand, is then fixed hoop component with tower section, i.e., It can be used Guywire tower hoisting fixture that next section of tower section is installed.Concrete structure is as follows:
As shown in figure 8, the hoop component of the top is fixed with hand frame 51, as shown in figure 9, the lifting The bottom of mobile jib is provided with hand assembly pulley 52.D-shaped shackle 53 is fixed with the hand frame.During installation, by steel wire Cheese of restricting is arranged on hand frame 51, one of steel wire rope pass through hand assembly pulley 52 after be fixed on D-shaped shackle 53 On, then it is inserted in three hoop components (as shown in figure 12) at the top of lifting mobile jib.
It is described using the lifting connecting tooling of above-mentioned Guywire tower hanging method, including lifting connector and tower section connector Lifting connector includes the connecting plate that can be connected with the Guywire tower hoisting fixture, the tower section connector including can with it is described The connection pole of tower section connection.
Tower section is inevitably given to hoisting process and brings puzzlement certainly during to avoid lifting tower section, and lifting connecting tooling is set It is calculated as rotary structure.As shown in Figure 13, Figure 14, the lifting connector and the tower section connector are respectively supporting plate connection Part and rotary connector, as shown in figure 15, the supporting plate connector include backing board 81, connection mobile jib 82 and connecting plate 83, institute State backing board and the connecting plate is individually fixed in the two ends of the connection mobile jib, connecting plate 83 can be connected with lifting joint.Such as Shown in Figure 16, the rotary connector includes adpting flange 84, connecting tube 85 and connection pole 86, and the adpting flange is fixed In the end of the connecting tube and with the connecting tube insertion, the connection pole is fixed on the periphery of the connecting tube, connects Pole 86 is used to be connected with tower section.After connecting tube 85 is sheathed on connection mobile jib 82, backing board 81 can be with adpting flange 84 Contact.Ball 87 is provided between the backing board and the adpting flange.
The frock of Guywire tower hanging method of the present invention and use this method is mainly used in height and exceedes the loop wheel machine lifting limit Highly, have that place limits can not the mountain top that enters of machinery, used in the communication stayed tower in the environment such as forest.

Claims (10)

1. Guywire tower hanging method, it is characterised in that:Bracing wire tower foundation is installed, in the side installation foundation of the bracing wire tower foundation Pole, Guywire tower hoisting fixture is fixed on the basic pole, in the upper end fixed hoisting connecting tooling of basic tower section, is passed through The basic tower section is lifted by crane and is fixed on the basis of the Guywire tower by the Guywire tower hoisting fixture, and the Guywire tower is lifted Frock is moved up and fixed with the basic tower section, in the upper end fixed hoisting connecting tooling of second segment tower section, passes through the bracing wire The second segment tower section is lifted by crane and is fixed on the top of the basic tower section by tower hoisting fixture, by the Guywire tower hoisting fixture Move up and fixed with the tower section of the top, piecewise complete is coordinated with the lifting connecting tooling by the Guywire tower hoisting fixture The lifting of next section of tower section.
2. using the Guywire tower hoisting fixture of Guywire tower hanging method described in claim 1, it is characterised in that:Including lifting master Bar, cantilever beam assembly and at least two groups hoop components, the cantilever beam assembly include fix bar and cantilever beam support arm, the cantilever Beam assembly is fixed on the upper end of the lifting mobile jib by the fix bar, and the hoop component is sheathed on the lifting mobile jib On.
3. Guywire tower hoisting fixture according to claim 2, it is characterised in that:The lifting mobile jib and the cantilever beam group The fix bar of part is hollow pipe, and lifting steel wire rope is by the lifting mobile jib and the die of the fix bar of the cantilever beam assembly Pass through, a upper end from the fix bar of steel wire rope passes and lifting is connected behind the end of the cantilever beam support arm and connects Head.
4. Guywire tower hoisting fixture according to claim 2, it is characterised in that:The hoop component includes sleeve pipe, end plate And U bolt, described sleeve pipe be sheathed on it is described lifting mobile jib on, described sleeve pipe is fixed by connector with the end plate, the U The both ends of shape bolt and the end plate connection.
5. Guywire tower hoisting fixture according to claim 4, it is characterised in that:The inner ring of described sleeve pipe is provided with collar shape Needle roller is along the circumferential direction evenly equipped with retainer, the retainer.
6. Guywire tower hoisting fixture according to claim 4, it is characterised in that:The sleeve pipe of the hoop component of bottom Upper end is fixed with casing flange.
7. Guywire tower hoisting fixture according to claim 2, it is characterised in that:The hoop component of the top is fixed with Hand frame, the bottom of the lifting mobile jib, which is provided with hand transition piece, the hand frame, is fixed with steel wire rope Clip.
8. using the lifting connecting tooling of Guywire tower hanging method described in claim 1, it is characterised in that:Including lifting connector With tower section connector, the lifting connector includes the connecting plate that can be connected with the Guywire tower hoisting fixture, and the tower section connects Fitting includes the connection pole that can be connected with the tower section.
9. lifting connecting tooling according to claim 8, it is characterised in that:The lifting connector and tower section connection Part is respectively supporting plate connector and rotary connector, and the supporting plate connector includes backing board, connection mobile jib and connecting plate, described Backing board and the connecting plate are individually fixed in the two ends of the connection mobile jib, and the rotary connector includes adpting flange, connected Adapter and connection pole, the adpting flange be fixed on the end of the connecting tube and with the connecting tube insertion, the connection Pole is fixed on the periphery of the connecting tube, and the connecting pipe box are on the connection mobile jib.
10. lifting connecting tooling according to claim 9, it is characterised in that:The backing board and the adpting flange it Between be provided with ball.
CN201710500860.5A 2017-06-27 2017-06-27 Guywire tower hanging method and the frock using this method Pending CN107217909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710500860.5A CN107217909A (en) 2017-06-27 2017-06-27 Guywire tower hanging method and the frock using this method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710500860.5A CN107217909A (en) 2017-06-27 2017-06-27 Guywire tower hanging method and the frock using this method

Publications (1)

Publication Number Publication Date
CN107217909A true CN107217909A (en) 2017-09-29

Family

ID=59950474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710500860.5A Pending CN107217909A (en) 2017-06-27 2017-06-27 Guywire tower hanging method and the frock using this method

Country Status (1)

Country Link
CN (1) CN107217909A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083486A (en) * 2018-08-30 2018-12-25 长兴创智科技有限公司 A kind of more piece cement electric pole automatic assembling mounting device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009275395A (en) * 2008-05-14 2009-11-26 Avolon Systmes Corp Pile construction apparatus
CN101973501A (en) * 2010-10-20 2011-02-16 三一电气有限责任公司 Fan integral installation rotating holding mechanism
CN202899735U (en) * 2012-10-17 2013-04-24 国家电网公司 Lifting tool for high-pressure iron tower support
CN103243963A (en) * 2013-05-14 2013-08-14 国家电网公司 Method for steel pipe pole segmental hoisting by aid of suspended holding pole
CN103669978A (en) * 2013-12-24 2014-03-26 国家电网公司 Multifunctional hoop device for assembling embracing rods
CN203794500U (en) * 2014-02-24 2014-08-27 扬州国电通用电力机具制造有限公司 Tower hoisting device
CN203865836U (en) * 2014-06-13 2014-10-08 国网四川省电力公司双流县供电分公司 Hoisting tool in rigid connection with telegraph pole
CN203924874U (en) * 2014-06-26 2014-11-05 国家电网公司 Attaching pole is from lifting appliance
CN204199836U (en) * 2014-06-26 2015-03-11 国家电网公司 A kind of power tower group lifting component device and pole thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009275395A (en) * 2008-05-14 2009-11-26 Avolon Systmes Corp Pile construction apparatus
CN101973501A (en) * 2010-10-20 2011-02-16 三一电气有限责任公司 Fan integral installation rotating holding mechanism
CN202899735U (en) * 2012-10-17 2013-04-24 国家电网公司 Lifting tool for high-pressure iron tower support
CN103243963A (en) * 2013-05-14 2013-08-14 国家电网公司 Method for steel pipe pole segmental hoisting by aid of suspended holding pole
CN103669978A (en) * 2013-12-24 2014-03-26 国家电网公司 Multifunctional hoop device for assembling embracing rods
CN203794500U (en) * 2014-02-24 2014-08-27 扬州国电通用电力机具制造有限公司 Tower hoisting device
CN203865836U (en) * 2014-06-13 2014-10-08 国网四川省电力公司双流县供电分公司 Hoisting tool in rigid connection with telegraph pole
CN203924874U (en) * 2014-06-26 2014-11-05 国家电网公司 Attaching pole is from lifting appliance
CN204199836U (en) * 2014-06-26 2015-03-11 国家电网公司 A kind of power tower group lifting component device and pole thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109083486A (en) * 2018-08-30 2018-12-25 长兴创智科技有限公司 A kind of more piece cement electric pole automatic assembling mounting device

Similar Documents

Publication Publication Date Title
CN106930538A (en) The construction method that a kind of radial monolayer cable net is integrally lifted, progressively anchored in batches
CN202358849U (en) Small-size suspension crane
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN210528234U (en) Device for hoisting tower of wind generating set
CN105781210B (en) A kind of conical tower and its tool section assist punching construction method for lifting whole
CN107217909A (en) Guywire tower hanging method and the frock using this method
CN201703776U (en) Inverted lifting device of storage tank
CN212599995U (en) Welding installation equipment for hot-melt welded pipe
CN104947953B (en) A kind of 10kV transmission line cement poles replacing options and the interim bar of replacing
CN206917389U (en) Guywire tower hoisting fixture
CN104882267A (en) Method for adding angle ring to transformer coil assembly
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN202379655U (en) Gantry type hydraulic jacking device
CN104925687A (en) Electric lifting device and working method thereof
CN104773645A (en) Tool for lifting bearing end cover of permanent magnet directly-driven wind generator
CN205772956U (en) Novel tower crane counterweight is from dismantling device
CN205662256U (en) High rises pergola side and hangs a semi -portal bridge crane
CN104249979A (en) Guide rail type self-climb slewing crane
CN204778500U (en) Swing arm tower crane assists hoist mechanism
CN209853613U (en) Automatic air pipe hoisting device
CN204297913U (en) Ammonia convertor special hanger
CN103640986B (en) Wind power generation stepped adhesion type He Zui hangs
CN201298682Y (en) transformer substrate isolating switch lifting appliance
CN107814310A (en) A kind of installation method of mixer and the device for installing mixer
CN201857225U (en) Hoisting device for bridge crane frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170929