CN202164837U - Integral moving house - Google Patents

Integral moving house Download PDF

Info

Publication number
CN202164837U
CN202164837U CN201120252510XU CN201120252510U CN202164837U CN 202164837 U CN202164837 U CN 202164837U CN 201120252510X U CN201120252510X U CN 201120252510XU CN 201120252510 U CN201120252510 U CN 201120252510U CN 202164837 U CN202164837 U CN 202164837U
Authority
CN
China
Prior art keywords
house
wall
unit
room
reinforcing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120252510XU
Other languages
Chinese (zh)
Inventor
李良元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201120252510XU priority Critical patent/CN202164837U/en
Application granted granted Critical
Publication of CN202164837U publication Critical patent/CN202164837U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

An integral moving house comprises a preset door opening and a preset window opening. A unit house is formed by enclosing a front side plate, a rear side plate, a left side plate, a right side plate, a top plate and a base plate. The front plate, the rear side plate, the left side plate, the right side plate, the top plate and the base plate adopt a reinforced concrete integral pouring structure. Reinforcing steel bars have three kinds, wherein a first kind is a plurality of positive direction reinforcing steel bars parallel to a front vertical face, a second kind is a plurality of side direction reinforcing steel bars parallel to a side vertical face, and a third kind is a plurality of horizontal reinforcing steel bars evenly distributed along the horizontal direction. All the positive direction reinforcing steel bars, the side direction reinforcing steel bars and the horizontal direction reinforcing steel bars are formed by welding one single reinforcing steel bar in end to end mode at positions except the preset door opening and the preset window opening. The connection positions of all the positive direction reinforcing steel bars, the side direction reinforcing steel bars and the horizontal direction reinforcing steel bars are in welded connection. The integral moving house has the advantages of being good in quake-proof performance, capable of moving integrally, convenient to splice and the like.

Description

The whole room that moves
Technical field
The utility model relates to building construction, is wholely to move the whole room that moves of the modular steel concrete of a plurality of assembly units specifically.
Background technology
The structure of conventional house mainly with brick mix, framework serves as that main structure forms, by planning again, original house can not move transhipment and abolished like the soil.Remaining constructional materials waste product almost except that rare reinforcing bar, can with and can not use by secondary.This building spends a large amount of manpowers, material resources and financial resources, because reasons in structure, the antidetonation grade in existing house is limited, breaks and caves in like the earthquake meeting, brings very big danger to the people.
The utility model content
The purpose of the utility model provides a kind of shock resistance integral body good, that can whole move, be convenient to assembly unit and moves the room.
This novel purpose is achieved in that a kind of integral body moves the room; Comprise door opening and the window opening reserved on the body of wall; Preceding body of wall, back wall, left body of wall, right body of wall, top board and base plate are synthetic into the house, unit; Preceding body of wall, back wall, left body of wall, right body of wall, top board and base plate adopt the integrated poured structure of steel bar concrete; Above-mentioned reinforcing bar has three kinds: first kind is the some forward muscle that are parallel to positive facade, and second kind is to be parallel to the plurality of side of side elevation to muscle, and the third is some horizontal bars that along continuous straight runs is uniformly distributed with; And above-mentioned all forward muscle, side direction muscle and horizontal bar are all adopting single steel bar to weld formation from beginning to end except the door opening of said reservation and all the other positions of window opening, and the junction of above-mentioned all forward muscle, side direction muscle and horizontal bar is adopted and is welded to connect.
Above-mentioned top board also integrated setting has sunbreaker.
The thickness of body of wall, back wall, left body of wall, right body of wall, top board and base plate is 120mm or 180mm before above-mentioned.
Above-mentioned all forward muscle, side direction muscle and horizontal bars are the indented bars of Φ 16mm.
The building size in said units house is: long 7.8m * wide 3.6m * high 3.0mm.
The said units house is two, and the left body of wall in first module house is connected through bolt with the right body of wall in house, Unit second, and is lined with seal gasket between the two.
The said units house is four; The left body of wall in first module house is connected through bolt with the right body of wall in house, Unit second; Be lined with seal gasket between the two; The left body of wall in house, Unit the 3rd is connected through bolt with the right body of wall in house, Unit the 4th, and is lined with seal gasket between the two, and house, Unit the 3rd and house, Unit the 4th place respectively on the top board in first module house and house, Unit second; The top board in first module house is connected through bolt with the base plate in house, Unit the 3rd, is lined with seal gasket between the two; The top board in house, Unit second is connected through bolt with the base plate in house, Unit the 4th, and is lined with seal gasket between the two.
Place, corner in the said units house is cast with concrete, is embedded with sewer pipe in the concrete.
Top, said units house is provided with coaming plate.
, frame type house mixed with existing brick compared, and the utlity model has following characteristics:
1, the structure of mobile house mainly forms with shape steel and concrete structure, and the soil is by planning again, this house can integral body repeatedly number move transhipment and using.A large amount of manpowers have been practiced thrift, material resources, financial resources.These room energy-conserving and environment-protective are a kind of novel practical rooms.
2, moving house-owner will form with monomer-type shape steel and the integrated poured structure of concrete.Adopt specialty to make point, reach energy-conservation, fast, reduce environment pollution, rapid transport and installation installed and got final product the household same day.During installation, can beat in advance on ground and bury ground underground, and will move the room and be fixed on the ground and get final product.
3, move that the room can prevent fires, shock resistance is good, how pipeclay does not rock, and can not cave in, and adopts seal gasket to flexibly connect between the monomer-type combined house, reaches the effect of using a soft approach to subdue a tough opponent.
4, move the room and can stack clay plantation plant on the roof, this soil reaches effect cool in summer and warm in winter in the protection room.Especially in cold belt or torrid areas, better effects if.
5, moving the room great advantage is to do the standard room, and is assemblied to form combination suite, combined building and assembled factory building, and plant can also be planted in the roof, and kart is parked on the roof.
Description of drawings
Fig. 1 is the plan view in house, unit.
Fig. 2 is the sectional view of Fig. 1 along the A-A line.
Fig. 3 is the sectional view of Fig. 1 along the A-B line.
Fig. 4 is the plan view that house, two unit shown in Figure 1 is bolted together.
Fig. 5 is the front view in this novel combination building.
The specific embodiment
Referring to Fig. 1, Fig. 2, Fig. 3; This integral body moves the house, unit in room: (contain forward and backward, left and right body of wall) on the body of wall and reserve door opening 5 and window opening 4; Preceding body of wall 15, back wall 16, left body of wall 12, right body of wall 13, top board 11 and base plate 14 are synthetic into the house, unit; Preceding body of wall, back wall, left body of wall, right body of wall, top board and base plate adopt the integrated poured structure of steel bar concrete; Above-mentioned reinforcing bar has three kinds: first kind is that the some forward muscle that are parallel to positive facade are for 103, the second kinds to be parallel to the plurality of side of side elevation to muscle 101, and the third is some horizontal bars 102 that along continuous straight runs is uniformly distributed with; And above-mentioned all forward muscle 103, side direction muscle 101 and horizontal bar 102 are all adopting single steel bar to weld formation from beginning to end except the door opening of said reservation and all the other positions of window opening, and the junction of above-mentioned all forward muscle, side direction muscle and horizontal bar is adopted and is welded to connect.Be that the forward muscle is parallel to positive facade, the side direction muscle is parallel to side elevation, and horizontal bar is parallel to bottom surface and end face.Top board 11 also integrated setting has sunbreaker 11a (referring to Fig. 2, independent arrangement of reinforcement in the sunbreaker).Before the thickness of body of wall 15, back wall 16, left body of wall 12, right body of wall 13, top board 11 and base plate 14 be 120mm or 180mm (its thickness can be adjusted according to demand, as 240mm etc.).All forward muscle, side direction muscle and horizontal bar are the indented bars of Φ 16mm (can between Φ 10 ~ Φ 24mm, select for use, or according to circumstances use other sizes).The building size in house, unit (in the body of wall center line) is: long 7.8m * wide 3.6m * high 3.0mm (it is long-pending that its building area promptly equals 7.8m * wide 3.6m, and the building area of self-contained flat also can be selected other size for use according to demand).
Referring to Fig. 4; The house, unit is two; The left body of wall in first module house (referring to Fig. 1, establishing preformed hole 12a, 12b on the left body of wall) connects through bolt with the right body of wall (the corresponding preformed hole of establishing on the right body of wall) in house, Unit second, and is lined with seal gasket 3 between the two.The house, unit is four; The left body of wall in first module house is connected through bolt with the right body of wall in house, Unit second; Be lined with seal gasket between the two; The left body of wall in house, Unit the 3rd is connected through bolt with the right body of wall in house, Unit the 4th, and is lined with seal gasket between the two, and house, Unit the 3rd and house, Unit the 4th place respectively on the top board in first module house and house, Unit second; The top board in first module house is connected through bolt with the base plate in house, Unit the 3rd, is lined with seal gasket between the two; The top board in house, Unit second is connected through bolt with the base plate in house, Unit the 4th, and is lined with seal gasket between the two.Certainly multiple compound mode can also be arranged, can be according to user demand and assembling combination in addition.
Among Fig. 4, first module room 1 and second self-contained flat, 2 internal condition demands are provided with partition wall and on the body of wall of front, rear, left and right, reserve door opening and window opening etc.Among Fig. 4, door opening 5 is opened on preceding body of wall, and among Fig. 2, window opening 4 is opened on back wall 16 (referring to Fig. 4).The size of door opening and window opening is selected for use according to demand by norm of construction.Referring to Fig. 4, the partition wall in the first module house will be divided into kitchen, washroom and parlor (containing the dining room) three parts within doors.
Referring to Fig. 4, self-contained flat place, corner within doors is cast with concrete 6, is embedded with sewer pipe 7 in the concrete.Sewer pipe stretches out base plate downwards, and 30~40cm height is upwards arranged.If when adopting the two superimposed combination, the sewer pipe in the house, unit of upper and lower layer connects and gets final product, and the self-contained flat roofing slab is provided with coaming plate 8.Coaming plate 8 is along four edge settings of self-contained flat roofing slab, perhaps along four outward flange settings of top board and sunbreaker.Fig. 5 illustrates, the positive facade in this novel combination building, and this combination building is combined by house, 8 unit, and this combination building is a four-layer structure, and the part of middle (five lattice laterally being arranged, lattice in the middle of referring to) is set up the space for stair.

Claims (9)

1. an integral body moves the room; Comprise; Door opening of reserving on the body of wall (5) and window opening (4); It is characterized in that: preceding body of wall (15), back wall (16), left body of wall (12), right body of wall (13), top board (11) and base plate (14) are synthetic into the house, unit, and preceding body of wall, back wall, left body of wall, right body of wall, top board and base plate adopt the integrated poured structure of steel bar concrete, and above-mentioned reinforcing bar has three kinds: first kind is the some forward muscle (103) that are parallel to positive facade; Second kind is to be parallel to the plurality of side of side elevation to muscle (101), and the third is some horizontal bars (102) that along continuous straight runs is uniformly distributed with; And above-mentioned all forward muscle (103), side direction muscle (101) and horizontal bar (102) are all adopting single steel bar to weld formation from beginning to end except the door opening of said reservation and all the other positions of window opening, and the junction of above-mentioned all forward muscle, side direction muscle and horizontal bar is adopted and is welded to connect.
2. integral body according to claim 1 moves the room, it is characterized in that: said top board (11) also integrated setting has sunbreaker (11a).
3. integral body according to claim 1 moves the room, it is characterized in that: the thickness of body of wall (15), back wall (16), left body of wall (12), right body of wall (13), top board (11) and base plate (14) is 120mm or 180mm before said.
4. integral body according to claim 3 moves the room, it is characterized in that: said all forward muscle (103), side direction muscle (101) and horizontal bars (102) are the indented bars of Φ 16mm.
5. integral body according to claim 4 moves the room, it is characterized in that: the architect's scale modest ability in house, said unit * wide * height is: 7.8m * 3.6m * 3.0m.
6. integral body according to claim 3 moves the room, it is characterized in that: house, said unit is two, and the left body of wall of first module house (1) is connected through bolt with the right body of wall in house, Unit second (2), and is lined with seal gasket between the two (3).
7. integral body according to claim 3 moves the room, it is characterized in that: house, said unit is four; The left body of wall in first module house is connected through bolt with the right body of wall in house, Unit second; Be lined with seal gasket between the two; The left body of wall in house, Unit the 3rd is connected through bolt with the right body of wall in house, Unit the 4th, and is lined with seal gasket between the two, and house, Unit the 3rd and house, Unit the 4th place respectively on the top board in first module house and house, Unit second; The top board in first module house is connected through bolt with the base plate in house, Unit the 3rd, is lined with seal gasket between the two; The top board in house, Unit second is connected through bolt with the base plate in house, Unit the 4th, and is lined with seal gasket between the two.
8. move the room according to the described integral body of the arbitrary claim of claim 1~7, it is characterized in that: said self-contained flat place, corner within doors is cast with concrete (6), is embedded with sewer pipe (7) in the concrete.
9. integral body according to claim 1 moves the room, it is characterized in that: said self-contained flat roof is provided with coaming plate (8).
CN201120252510XU 2011-07-18 2011-07-18 Integral moving house Expired - Fee Related CN202164837U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120252510XU CN202164837U (en) 2011-07-18 2011-07-18 Integral moving house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120252510XU CN202164837U (en) 2011-07-18 2011-07-18 Integral moving house

Publications (1)

Publication Number Publication Date
CN202164837U true CN202164837U (en) 2012-03-14

Family

ID=45800673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120252510XU Expired - Fee Related CN202164837U (en) 2011-07-18 2011-07-18 Integral moving house

Country Status (1)

Country Link
CN (1) CN202164837U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685351A (en) * 2019-10-21 2020-01-14 长沙远大住宅工业集团股份有限公司 Prefabricated module

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110685351A (en) * 2019-10-21 2020-01-14 长沙远大住宅工业集团股份有限公司 Prefabricated module

Similar Documents

Publication Publication Date Title
CN102383506B (en) Bidirectional intensively ribbed mold clamp wall body
US7913469B2 (en) Concrete load-bearing wall with compound heat-insulating layer
US8079189B2 (en) Structure system of concrete building for self-heat insulation
US8863447B2 (en) Hybrid geodesic structure
CN104831828B (en) Factorial praluction assembled energy-saving light composite board shape wall
US20070130841A1 (en) Construction module system and method
CN206971471U (en) One kind interval steel pipe and combined concrete shear wall system
CN105908867A (en) Cold-formed thin-wall section steel composite sheet steel shear wall
CN202324258U (en) Bidirectional multi-ribbed mortised wall
CN216405887U (en) Furred ceiling waterproof construction
CN202164837U (en) Integral moving house
CN201228458Y (en) Safe and anti-shock movable house
CN109610918A (en) The corrugated steel castle of shockproof anti-core
CN211923105U (en) Precast concrete externally-hung wallboard seam waterproof construction
CN110158761B (en) Multifunctional greening landscape node for each house under three-dimensional space
CN211775061U (en) Energy-saving hollow heat-insulation net wall
CN201050208Y (en) Earthquake-resisting room with wall, floor and roof adopting EPS steel mesh sandwich panel
CN209523311U (en) Low multi-story structure
CN102776988A (en) Thermal insulation fireproof anti-seismic integrated novel energy-saving roof board
CN206346540U (en) Compound underground garage
CN206328873U (en) A kind of modularization case room with Stilt layer
CN204531556U (en) RC circular pipe house
CN217518290U (en) Prefabricated structure house
CN104727489B (en) Novel industrialized production energy-efficient building roof board and manufacturing method
CN210563560U (en) Movable modular police duty equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120314

Termination date: 20130718