CN202148683U - 钢筋混凝土烟囱无井架施工装置 - Google Patents

钢筋混凝土烟囱无井架施工装置 Download PDF

Info

Publication number
CN202148683U
CN202148683U CN201120222671U CN201120222671U CN202148683U CN 202148683 U CN202148683 U CN 202148683U CN 201120222671 U CN201120222671 U CN 201120222671U CN 201120222671 U CN201120222671 U CN 201120222671U CN 202148683 U CN202148683 U CN 202148683U
Authority
CN
China
Prior art keywords
motor
crossbeam
motor frame
workbench
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120222671U
Other languages
English (en)
Inventor
李呈坤
郭雪芳
陈翠萍
方拥政
刘绍明
段光明
任卫东
郭新保
黄湘辉
马国防
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co., Ltd., Xinjiang Production and Construction Corp.
Original Assignee
FIFTH BUILDING INSTALLATION ENGINEERING CO LTD OF XINJIANG PRODUCTION CONSTRUCTION CORPS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FIFTH BUILDING INSTALLATION ENGINEERING CO LTD OF XINJIANG PRODUCTION CONSTRUCTION CORPS filed Critical FIFTH BUILDING INSTALLATION ENGINEERING CO LTD OF XINJIANG PRODUCTION CONSTRUCTION CORPS
Priority to CN201120222671U priority Critical patent/CN202148683U/zh
Application granted granted Critical
Publication of CN202148683U publication Critical patent/CN202148683U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

一种钢筋混凝土烟囱无井架施工装置,包括加强模板5、6、工作台1,所述的工作台设在至少有四根钢梁3构成的台架上,每一根钢梁3的两端下方均设有工作台提升装置,所述的工作台提升装置,包含大梁10、电机17、螺杆16、电机架15,钢梁3与工作台提升装置中的大梁10相连,大梁上设有大梁挡块11、大梁升降螺母12、滚轮和电机架15,电机17设在电机架15上,螺杆16与电机轴相连且与大梁升降螺母12相配,电机架15与大梁间设有滚轮13,电机架15上设有电机架挡块14,加强模板6上设有挡块销孔7。本实用新型省工省时、操作简便且安全、可靠。

Description

钢筋混凝土烟囱无井架施工装置
技术领域
本实用新型属于建材领域,尤其是涉及一种钢筋混凝土烟囱无井架施工装置。
背景技术
当前,钢筋混凝土烟囱建筑中,多采用井架施工,这种施工方法不仅需大量的井架构件,井架的塔建也十分费时、费工,工作量非常大,不仅如此,由于是高空作业,在这么大的工作量中安全保障十分困难,伤亡事故时有发生。
发明内容
本实用新型的目的在于提供一种无井架、省工省时、操作简便且安全、可靠的钢筋混凝土烟囱无井架施工装置。
本实用新型包括加强模板5、6、工作台1,其特征在于所述的工作台设在至少有四根钢梁3的台架上,每一根钢梁3的两端下方均设有工作台提升装置,工作台中央设有天井19,天井下端与钢梁间设有钢梁支撑杆18,所述的工作台提升装置,包含大梁10、电机17、螺杆16、电机架15,钢梁3与工作台提升装置中的大梁10相连,大梁上设有大梁挡块11、大梁升降螺母12、滚轮和电机架15,电机17设在电机架15上,螺杆16与电机轴相连且与大梁升降螺母12相配,电机架15与大梁间设有滚轮13,电机架15上设有电机架挡块14,加强模板6上设有挡块销孔7。
工作时,烟囱建筑到人站在地面无法操作时,架设此装置,提升时,先向电机架挡块14下方的加强模板6上挡块锁孔7上插上挡销,开动电机使其正转,和电机轴相连的螺杆通过大梁升降螺母11将大梁上提,和大梁相连的钢梁及其上的工作台随之上提,至所需高度时仃下电机,此时,向大梁挡块11下方、加强模板6的锁孔7上插上挡销,并拨出电机架挡块14下方的加强模板6上挡块锁孔7上的挡销,再使电机反转,由于大梁被大梁挡块11和挡销锁死,故迫使电机架15沿大梁向上滑动,至所需高度时在电机架挡块14下方的加强模板6上的挡块锁孔7上插上挡销,再需提升大梁时,取出大梁挡块11下方的加强模板6上挡块锁孔7上挡销,再使电机正转,如此反复操作便实现工作台的升降,直至烟囱顶部。
本实用新型省工省时、操作简便且安全、可靠的。
附图说明
图1为主视结构示意图。
图2为图1的A向局部结构示意图。
图3为图1的俯视结构示意图。
图4为台架的结构示意图。
图5为图4的B向结构示意图。
图中所示:1.为工作台,2.为烟囱内的钢筋,3.为幅射梁,4.为内外加强模板间的联接螺杆,5.为外加强模板,6.为内加强模板,7.为内加强模板上的销孔,8.为烟囱,9. 大梁上的滑轮,10.为大梁,11.为大梁挡块,12.为大梁升降螺母,13.为电机架滚轮,14.为电机架挡块,15.为电机架,16.为螺杆,17.为电机,18. 为钢梁支撑杆,19.为天井。
具体实施方式
实施例1:
本实施例包括加强模板5、6、工作台1,其特征在于所述的工作台设在至少有四根钢梁3按幅射状构成的台架上,每一根钢梁3的两端下方均设有工作台提升装置,工作台中央设有天井19,天井下端与钢梁间设有钢梁支撑杆18,所述的工作台提升装置,包含大梁10、电机17、螺杆16、电机架15,钢梁3与工作台提升装置中的大梁10相连,大梁上设有大梁挡块11、大梁升降螺母12、滚轮和电机架15,电机17设在电机架15上,螺杆16与电机轴相连且与大梁升降螺母12相配,电机架15与大梁间设有滚轮13,电机架15上设有电机架挡块14,加强模板6上设有挡块销孔7。
实施例2:
本实施例与实施例1区别在于设有8根钢梁。
实施例3:
本实施例与实施例1区别在于设有12根钢梁。

Claims (1)

1.一种钢筋混凝土烟囱无井架施工装置,包括加强模板(5)(6)、电机(17)、螺杆(16)、工作台(1),其特征在于所述的工作台设在至少有四根钢梁3构成的台架上,每一根钢梁3的两端下方均设有工作台提升装置,工作台中央设有天井(19),天井下端与钢梁间设有钢梁支撑杆(18),所述的工作台提升装置,包含大梁(10)、电机(17)、螺杆(16)、电机架(15),钢梁(3)与工作台提升装置中的大梁(10)相连,大梁上设有大梁挡块(11)、大梁升降螺母(12)、滚轮和电机架(15),电机(17)设在电机架(15)上,螺杆(16)与电机轴相连且与大梁升降螺母(12)相配,电机架(15)与大梁间设有滚轮(13),电机架(15)上设有电机架挡块(14),加强模板(6)上设有挡块销孔(7)。
CN201120222671U 2011-06-28 2011-06-28 钢筋混凝土烟囱无井架施工装置 Expired - Fee Related CN202148683U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120222671U CN202148683U (zh) 2011-06-28 2011-06-28 钢筋混凝土烟囱无井架施工装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120222671U CN202148683U (zh) 2011-06-28 2011-06-28 钢筋混凝土烟囱无井架施工装置

Publications (1)

Publication Number Publication Date
CN202148683U true CN202148683U (zh) 2012-02-22

Family

ID=45589746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120222671U Expired - Fee Related CN202148683U (zh) 2011-06-28 2011-06-28 钢筋混凝土烟囱无井架施工装置

Country Status (1)

Country Link
CN (1) CN202148683U (zh)

Similar Documents

Publication Publication Date Title
CN104564104B (zh) 一种用于隧道衬砌的台车系统
CN201158933Y (zh) 一种高层外挑结构维修脚手架装置
CN202627493U (zh) 用于电梯井施工的组合模板
CN204402504U (zh) 一种隧道钢模板衬砌台车
CN103485574B (zh) 一种造粒塔塔顶钢筋混凝土结构施工方法
CN202347842U (zh) 一种高层建筑液压爬升模板装置
CN204590555U (zh) 装配式电梯井施工平台
CN104499706B (zh) 电梯井模板平台及其施工方法
CN204001416U (zh) 用于施工厂房的可拼装式桁架
CN203834370U (zh) 圆拱涵拱圈钢模台车
CN202148683U (zh) 钢筋混凝土烟囱无井架施工装置
CN210127644U (zh) 一种用于建筑工程模板拆除施工的伸缩式撬棍
CN204983582U (zh) 一种多功能装修平台
CN206800968U (zh) 电梯井电动液压施工平台装置
CN202882375U (zh) 电梯井井道工具式脚手架操作平台
CN203130100U (zh) 隧道檐壁施工台车
CN104453217A (zh) 一种电梯井整体模板升模施工方法
CN205367560U (zh) 可移动式简易起吊装置
CN203924695U (zh) 一种间冷塔提模装置
CN103669219B (zh) 多肢高墩同滑施工装置
CN203175387U (zh) 用于钢板筒仓壁的快装直爬梯
CN204920224U (zh) 一种新型早拆模板拆模器
CN206329349U (zh) 一种隧道衬砌用封堵模架
CN205188844U (zh) 一种排架模板体系
CN205953375U (zh) 可拆卸及自由组合的塔吊附着顶升平台

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: XINJIANG BEIXIN CONSTRUCTION ENGINEERING (GROUP) C

Free format text: FORMER OWNER: XINJIANG PRODUCTION AND CONSTRUCTION CORPS THE 5TH CONSTRUCTION + INSTALLATION ENGINEERING COMPANY

Effective date: 20140418

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Chengkun

Inventor after: Huang Xianghui

Inventor after: Ma Guofang

Inventor after: Lei Yi

Inventor after: Guo Xuefang

Inventor after: Chen Cuiping

Inventor after: Fang Yongzheng

Inventor after: Liu Shaoming

Inventor after: Duan Guangming

Inventor after: Ren Weidong

Inventor after: Guo Xinbao

Inventor before: Li Chengkun

Inventor before: Ma Guofang

Inventor before: Guo Xuefang

Inventor before: Chen Cuiping

Inventor before: Fang Yongzheng

Inventor before: Liu Shaoming

Inventor before: Duan Guangming

Inventor before: Ren Weidong

Inventor before: Guo Xinbao

Inventor before: Huang Xianghui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI CHENGKUN GUO XUEFANG CHEN CUIPING FANG YONGZHENG LIU SHAOMING DUAN GUANGMING REN WEIDONG GUO XINBAO HUANG XIANGHUI MA GUOFANG TO: LI CHENGKUN LEI YI GUO XUEFANG CHEN CUIPING FANG YONGZHENG LIU SHAOMING DUAN GUANGMING REN WEIDONG GUO XINBAO HUANG XIANGHUI MA GUOFANG

Free format text: CORRECT: ADDRESS; FROM: 832000 SHIHEZI, XINJIANG UYGUR AUTONOMOUS REGION TO: 830000 URUMQI, XINJIANG UYGUR AUTONOMOUS REGION

TR01 Transfer of patent right

Effective date of registration: 20140418

Address after: 830000 No. 113 Xinmin Road, the Xinjiang Uygur Autonomous Region, Urumqi

Patentee after: Construction Engineering Co., Ltd., Xinjiang Production and Construction Corp.

Address before: 832000 No. five, 164 North Road, the Xinjiang Uygur Autonomous Region, Shihezi Province

Patentee before: The Fifth Building Installation Engineering Co.,Ltd. Of Xinjiang Production Construction Corps

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120222

Termination date: 20170628

CF01 Termination of patent right due to non-payment of annual fee