CN202144598U - 一种下沉式地下构筑物 - Google Patents

一种下沉式地下构筑物 Download PDF

Info

Publication number
CN202144598U
CN202144598U CN201120229858U CN201120229858U CN202144598U CN 202144598 U CN202144598 U CN 202144598U CN 201120229858 U CN201120229858 U CN 201120229858U CN 201120229858 U CN201120229858 U CN 201120229858U CN 202144598 U CN202144598 U CN 202144598U
Authority
CN
China
Prior art keywords
steel
wall
sunk type
type underground
underground structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120229858U
Other languages
English (en)
Inventor
邹宗煊
邹荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WENZHOU CHANGCHENG FOUNDATION ENGINEERING Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201120229858U priority Critical patent/CN202144598U/zh
Application granted granted Critical
Publication of CN202144598U publication Critical patent/CN202144598U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

一种下沉式地下构筑物,与现有技术一样,都具有钢筋混凝土的板、梁、柱、墙,其特征在于:在构筑物周边设有止水帷幕,在周边墙下端设有刃脚,在底板标高土层上下设有水泥土挡土墙,在周边墙的内墙下端设有牛腿,在牛腿与各柱下并列两台升降装置,将构筑物载荷传给工程桩或抗拔桩,边挖土边让构筑物慢速平稳下沉,并继续向上施工构筑物第二层至全部构筑物,直至构筑物沉到设计标高。与构筑物大开挖相比,省去造价昂贵的基坑支护,与逆作法相比,则施工更方便,造价更低,其适用于我国广大城市建设。

Description

一种下沉式地下构筑物
技术领域
本实用新型涉及一种建筑基础领域,尤其涉及一种下沉式地下构筑物。
背景技术
随着我国城市规模、城市建设和居住人口的快速发展,城市地下空间被不断挖掘与利用,地下构筑物面积也越来越大,层数也由一二层向多层发展。目前,地下构筑物的施工绝大部分采用大开挖法:先施工地下构筑物的支护工程,然后,开挖至地下构筑物最低点,由下往上逐层施工;极少部分构筑物为赶工期或在闹市区无法大开挖,则采用逆作法施工,先施工地表层,再向下和向上逐层施工。二者各有利弊,前者存在需要价格昂贵的基坑支护,施工工期长;后者施工工期短,造价低,但施工较困难,尤其是土层开挖。
发明内容
本实用新型所要解决的技术问题是:提供一种下沉式地下构筑物及其施工方法,能减少城市建设投资,该构筑物施工不用基坑支护,施工方便,工期短。
本实用新型所采用的技术方案是:一种下沉式地下构筑物,与现有技术一样,都具有钢筋混凝土的板、梁、柱、墙,其特征是构筑物周边设止水帷幕,在周边墙下端设有水平外延20-200cm,垂直长20-300cm的刃脚,刃脚为钢筋混凝土,刃脚端部设钢削泥板,在构筑物底板标高土层上下1-15m设有防涌土的水泥土挡土墙或钢板桩,在周边墙的内墙下端或外墙上端设有牛腿,在牛腿与各柱下并列两台升降装置,墙下承台工程桩或抗拔桩顶标高设计到地面,柱下承台工程桩标高设计至地面或采用逐节拆卸组合钢支撑接至柱下升降装置。
本实用新型进一步技术方案是:所述水泥土挡土墙为搅拌桩或粉喷桩,所述钢板桩是在墙内边施工边向下打入,所述升降装置为螺旋升降机或千斤顶,所述逐节拆卸的钢支撑每节高度等同于升降装置的行程。
构筑物荷载通过升降装置传给工程桩或抗拔桩,为节约柱下钢支撑的投资,采用一柱双升降装置,在下一节支撑柱上有50-200mm的孔洞用于穿过承接另一台升降装置承受荷载的钢棒,即当一台升降装置行程用完,在下一节钢支撑孔洞穿过钢棒安装另一台升降装置支撑构筑物柱子荷载,拆卸无行程升降装置下面一节钢支撑,再重新顶升行程,卸去临时用于支撑的升降装置,开始再次下沉构筑物。
上述一种下沉式地下构筑物施工,依次包括以下施工步骤:
(1)、施工地下构筑物的工程桩;
(2)、施工构筑物周边止水帷幕和防坑底涌泥的水泥土挡土墙;
(3)、把逐节拆卸的钢支撑从地面打至工程桩桩顶,在墙下、柱下支撑点安放两台升降装置;
(4)、制作该构筑物最底一层的钢筋绑扎、焊牛腿、焊钢削泥板、支模、浇注混凝土与养护,并在每两柱间的梁和墙上安置水平尺;
(5)、在构筑物的混凝土强度达到后,在场地内降水与构筑物内挖土外运;
(6)、构筑物下沉时,先将牛腿下的工程桩采用钢扎匝抱紧,通过升降装置与牛腿连接,升降装置规格50-200吨,每一支撑点下并列两台互换支撑的升降装置;
(7)、下沉中所有升降设备统一调控,采用步进电机或人工操作保证构筑物慢速水平下沉,两柱间沉降差控制在1-20mm;
(8)、上一层地下构筑物按现有技术继续向上施工;
(9)、继续向下挖土沉降构筑物,使构筑物下沉至设计标高;。
(10)、在构筑物内按现有技术自下而上完成底板承台与各层及顶层楼面板施工。
一种下沉式地下构筑物与现有技术相比,具有明显优越性:与大开挖施工相比,省去造价昂贵的基坑支护和支护工程施工时间;与逆作法施工相比,该施工更方便,造价更低,其适用于我国广大城市建设。
下面结合附图以及具体实施方式对本实用新型作进一步说明。
附图说明
图1是本实用新型实施例示意图。
图面说明:1.地表杂土层,2.刃脚的钢削泥板,3.刃脚,4.钢筋混凝土梁,5.牛腿,6.升降机,7.待建构筑物,8.钢筋混凝土柱,9.水平尺,10.钢筋混凝土外墙,11.钢扎匝,12.作牵拉反力桩的工程桩,13.止水帷幕,14.防涌泥水泥土挡土墙,15.工程桩,16.淤泥层,17.逐节拆卸的钢支撑。
具体实施方式
如图1所示实施例,一种下沉式地下构筑物具有钢筋混凝土的板、梁(4)、柱(8)、墙(10),其特征是构筑物周边墙下端设有外延80cm,长100cm的刃脚(3),刃脚(3)为钢筋混凝土,其端部设钢削泥板(2),构筑物底板的设计标高的土层上3m,下6m设有防涌土的水泥土挡土墙(14),在构筑物周边设止水帷幕(13),在构筑物周边墙(10)和柱下(8)设有升降装置(6),在构筑物周边墙的内墙下端设牛腿(5),下沉、牵拉或顶升构筑物的反力桩采用构筑物周边墙下工程桩(12),升降装置(6)采用螺旋升降机。
上述一种下沉式地下构筑物实施例施工步骤为:
(1)、施工地下构筑物的工程桩(15);
(2)、施工构筑物周边止水帷幕(13)和防坑底涌泥的水泥土挡土墙(14);
(3)、把逐节拆卸的钢支撑(17)从地面打至工程桩(15)桩顶,在墙下、柱下支撑点安放两台升降装置;
(4)、制作该构筑物最底一层的钢筋绑扎、焊牛腿、支模、浇注混凝土与养护,并在每两柱间的梁(4)和墙(10)上安置水平尺(9);
(5)、在构筑物的混凝土强度达到后,在场地内降水与构筑物内挖土(1)外运;
(6)、构筑物向下沉降时,先将牛腿(3)下的工程桩(12)采用钢扎匝(11)抱紧,通过升降装置(6)与牛腿(3)连接,升降装置(6)规格100吨,每一支撑点下并列两台互换支撑的升降装置;
(7)、下沉中所有升降装置(6)统一调控,采用步进电机或人工操作保证构筑物慢速水平下沉,两柱间沉降差控制在1-20mm;
(8)、上一层地下构筑物(7)按现有技术继续向上施工;
(9)、继续向下挖土(16)沉降构筑物,使构筑物下沉至设计标高;。
(10)、在构筑物内按现有技术自下而上完成底板承台与各层及顶层楼面板施工。

Claims (2)

1.一种下沉式地下构筑物,具有钢筋混凝土的板、梁、柱、墙,其特征在于:在构筑物周边设有止水帷幕,周边墙下端设有水平外延20-200cm,垂直长20-300cm的刃脚,刃脚为钢筋混凝土,刃脚端部设钢削泥板,构筑物底板标高土层上下1-15m设有防涌土的水泥土挡土墙或钢板桩,在周边墙的内墙下端或外墙上端设有牛腿,在牛腿与各柱下并列两台升降装置,墙下承台工程桩或抗拔桩桩顶标高设计到地面,柱下承台工程桩标高设计至地面或采用逐节拆卸组合钢支撑接至柱下升降装置。
2.根据权利要求1所述的一种下沉式地下构筑物,其特征在于:所述水泥土挡土墙为搅拌桩或粉喷桩,所述钢板桩是在墙内边施工边向下打入,所述升降装置为螺旋升降机或千斤顶,所述逐节拆卸的钢支撑每节高度等同于升降装置的行程。 
CN201120229858U 2011-06-21 2011-06-21 一种下沉式地下构筑物 Expired - Fee Related CN202144598U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120229858U CN202144598U (zh) 2011-06-21 2011-06-21 一种下沉式地下构筑物

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120229858U CN202144598U (zh) 2011-06-21 2011-06-21 一种下沉式地下构筑物

Publications (1)

Publication Number Publication Date
CN202144598U true CN202144598U (zh) 2012-02-15

Family

ID=45580531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120229858U Expired - Fee Related CN202144598U (zh) 2011-06-21 2011-06-21 一种下沉式地下构筑物

Country Status (1)

Country Link
CN (1) CN202144598U (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535535A (zh) * 2012-02-28 2012-07-04 中建三局建设工程股份有限公司 带地下室多高层建筑地面预筑托降基底预压后固施工方法
CN102561393A (zh) * 2012-03-06 2012-07-11 长乐杭辉日用品有限公司 拼装式地下构建物及其建造方法
CN105297889A (zh) * 2015-10-20 2016-02-03 重庆交通大学 利用黄土地貌逆作法施工框架结构的房屋建造方法
CN106498969A (zh) * 2016-10-20 2017-03-15 兰州理工大学 空间框架式钢沉箱支挡结构的施工方法
WO2020198897A1 (zh) * 2019-04-04 2020-10-08 问延煦 一种沉墙施工法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535535A (zh) * 2012-02-28 2012-07-04 中建三局建设工程股份有限公司 带地下室多高层建筑地面预筑托降基底预压后固施工方法
CN102561393A (zh) * 2012-03-06 2012-07-11 长乐杭辉日用品有限公司 拼装式地下构建物及其建造方法
CN102561393B (zh) * 2012-03-06 2014-05-14 长乐杭辉日用品有限公司 拼装式地下构建物及其建造方法
CN105297889A (zh) * 2015-10-20 2016-02-03 重庆交通大学 利用黄土地貌逆作法施工框架结构的房屋建造方法
CN106498969A (zh) * 2016-10-20 2017-03-15 兰州理工大学 空间框架式钢沉箱支挡结构的施工方法
CN106498969B (zh) * 2016-10-20 2018-10-16 兰州理工大学 空间框架式钢沉箱支挡结构的施工方法
WO2020198897A1 (zh) * 2019-04-04 2020-10-08 问延煦 一种沉墙施工法
US20220195687A1 (en) * 2019-04-04 2022-06-23 Yanxu WEN Wall sinking construction method
US11746493B2 (en) * 2019-04-04 2023-09-05 Yanxu WEN Wall sinking construction method

Similar Documents

Publication Publication Date Title
CN102127974B (zh) 既有建筑下方新增地下室的设计和施工方法
CN105386408B (zh) 深水桥梁桩基施工方法
CN203145038U (zh) 格构柱式塔吊基础
CN104453274B (zh) 利用支护结构和托换结构支撑既有建筑物地下增层方法
CN102900090A (zh) 一种防涌水防地面下沉不倾斜干作业沉井及其施工方法
CN102191777B (zh) 钢板桩围堰结构及其逆做法施工方法
CN202144598U (zh) 一种下沉式地下构筑物
CN201546227U (zh) 用于支撑基坑围护桩墙和地下室结构外墙的钢支撑梁
CN203795458U (zh) 一种可以穿越地下室的无承台格构式塔吊基础装置
CN202881958U (zh) 一种含有降水功能的基坑支护结构
CN104314042B (zh) 采用桩承式箱筒结构的防波堤施工方法
CN201581409U (zh) 深基坑钢格构柱支承十字交叉梁的组合式塔吊基础
CN101614019A (zh) 紧临既有建筑物多层地下结构自支护施工方法
CN102864780A (zh) 一种基坑支护结构及其支护方法
CN103290847A (zh) 超大面积深基坑内斜梁支撑结构及施工方法
CN204590059U (zh) 一种复合式塔吊基础结构
CN202280066U (zh) 一种防涌水防地面下沉不倾斜干作业沉井
CN206769047U (zh) 一种钢格构柱与灌注桩连接结构
CN203238950U (zh) 悬空桁架支撑的混凝土梁模板
CN209923935U (zh) 一种上软下硬地层中同位组合桩墙支护结构
CN202830936U (zh) 一种基坑支护结构
CN106193101A (zh) 塔吊钢平台桩基础及其施工方法
CN106400814A (zh) 一种基坑支护方法
CN207244633U (zh) 基坑围护顶圈梁上砖砌挡土墙钢筋桁架加固系统
CN202131602U (zh) 钢板桩围堰结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WENZHOU GREATWALL FOUNDATION ENGINEERING CO., LTD.

Free format text: FORMER OWNER: ZOU ZONGXUAN

Effective date: 20120618

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 325014 WENZHOU, ZHEJIANG PROVINCE TO: 325000 WENZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120618

Address after: 26, railway building, Wenzhou Avenue, Wenzhou, Zhejiang Province, China 325000

Patentee after: Wenzhou Changcheng Foundation Engineering Co., Ltd.

Address before: 325014 railway building, Wenzhou Avenue, Wenzhou, Zhejiang 901, China

Patentee before: Zou Zongxuan

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120215

Termination date: 20150621

EXPY Termination of patent right or utility model