CN202131798U - Movable fast-assembling base station - Google Patents

Movable fast-assembling base station Download PDF

Info

Publication number
CN202131798U
CN202131798U CN201120201512U CN201120201512U CN202131798U CN 202131798 U CN202131798 U CN 202131798U CN 201120201512 U CN201120201512 U CN 201120201512U CN 201120201512 U CN201120201512 U CN 201120201512U CN 202131798 U CN202131798 U CN 202131798U
Authority
CN
China
Prior art keywords
column
communication tower
base station
bearing diagonal
longeron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120201512U
Other languages
Chinese (zh)
Inventor
范洪章
范晓光
刘再忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI PROVINCE JINGXIAN COUNTY HONGYUAN TELE-COMMUNICATION Co Ltd
Original Assignee
HEBEI PROVINCE JINGXIAN COUNTY HONGYUAN TELE-COMMUNICATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI PROVINCE JINGXIAN COUNTY HONGYUAN TELE-COMMUNICATION Co Ltd filed Critical HEBEI PROVINCE JINGXIAN COUNTY HONGYUAN TELE-COMMUNICATION Co Ltd
Priority to CN201120201512U priority Critical patent/CN202131798U/en
Application granted granted Critical
Publication of CN202131798U publication Critical patent/CN202131798U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a mobile fast-assembling base station which comprises a steel structure base, a communication machine room and a matched supporting device, wherein the steel structure base comprises a bottom beam and concrete balance weights arranged above the bottom beam; the bottom beam comprises at least five longitudinal beams arranged in parallel and at least two transverse beams vertical to the longitudinal beams, and the longitudinal beams are fixedly connected with the transverse beams; the concrete balance weights are arranged at four corners of the bottom beam in a symmetrical way; a gap is arranged between the two adjacent concrete balance weights parallel to the transverse beams; a protection plate is fixedly arranged at the gap; the supporting device comprises a fixing support and an adjustable support; and the machine room is in a container type. In the utility model, the movable fast-assembling base station is quick and convenient to mount and is more flexible due to the additionally adopted movable support; the steel structure base is convenient to construct and leaves little residue after being detached; the adopted container type machine room is convenient to lift and transport and is stable in structure; and the concrete balance weights are arranged above the steel structure base, and the protection plate plate is additionally adopted so as to play a role in the theft prevention and the protection.

Description

Portable fast-assembling base station
Technical field
The utility model relates to a kind of mobile communication base station, especially a kind of portable fast-assembling base station.
Background technology
At present, the density of the base station of each common carrier constantly increases, and base station construction and urban planning constantly conflict; Cause the base station repeatedly to move easily, and present base station is inappropriate for repeatedly resettlement, has following shortcoming: 1, the basis of present base station need be carried out the excavation of the high degree of depth mostly; Do concrete cushion then; On concrete cushion, place the concrete weight coating piece, above the concrete weight coating piece, bottom girder is set then, bottom girder and concrete weight coating piece pass through bolt.This method duration is long, and because bottom girder and concrete weight coating piece weight are excessive, bolt hole is difficult for aiming at, and relatively difficulty is installed.The basis that also has is directly to carry out high degree of depth excavation; Do certain thickness concrete foundation then; Built-in fitting (bolt) is set in concrete foundation; Fix through this built-in fitting and bottom girder, wait to remove the residual about 30 centimeters built-in fitting above ground level of meeting on the concrete foundation of back, this built-in fitting is difficult for taking out.The job practices floor space on these two kinds of bases is all bigger, and the basis needs high degree of depth excavation, and construction period is long, and foundation construction needs through the concrete curing phase of certain hour communication tower to be installed after finishing.After removed the base station, original position can stay a large amount of concrete construction rubbish, and the concrete of projection and built-in fitting be easy to clean not, and can't utilize once more, needed again the concreting basis when install once more the base station, caused the wasting of resources.
2, the whole firm performance of the braced structures of the communication tower of present base station is bad, is unfavorable for repeatedly dismounting.
3, mostly the communications equipment room of base station is Light steel sheet room structure at present, also is inappropriate for repeatedly dismounting, influences speed of application.
The utility model content
The technical problem that the utility model will solve provides a kind of portable easily fast-assembling quick for installation base station.
For solving the problems of the technologies described above; The technical scheme that the utility model is taked is: a kind of portable fast-assembling base station; It comprises steel work base, communications equipment room, communication tower and supporting bracing or strutting arrangement, and its key technology is: the concrete weight coating piece that said steel work base comprises bottom girder and is located at the bottom girder top; Said bottom girder comprise at least 5 longerons being arranged side by side and with vertically disposed at least two crossbeams of said longeron, said longeron is fixedly connected with crossbeam; Said concrete weight coating piece is symmetrically set on four angles of bottom girder, leaves the gap between two adjacent concrete weight coating pieces parallel with crossbeam, is fixed with protected apron at this gap location;
Said bracing or strutting arrangement comprises fixed support and adjustable supports; Said fixed support comprises first column and second column; Said first column is positioned at a side of communications equipment room and respectively is provided with one in the both sides of communication tower; Said second column is positioned at the opposite side of communications equipment room; First column of both sides is connected with communication tower with first bearing diagonal by first horizontal support respectively; Said second column is hinged by second bearing diagonal and communication tower, and said second column is connected with first column, communication tower respectively via second horizontal support, is provided with the 4th bearing diagonal between said first column and the steel work base; Said movable supporting comprises anchor ear and the 3rd bearing diagonal; Said anchor ear is fixed on the communication tower; Said the 3rd bearing diagonal one end is hinged with first junction plate that is fixed on the anchor ear, and the other end is provided with leading screw, and said leading screw is connected with second junction plate of being located at the communications equipment room top; Said the 3rd bearing diagonal is provided with two, and two the 3rd bearing diagonals are about the communication tower symmetry;
Said machine room is the container-type machine room.
Preferably, above-mentioned steel work base is fixed on the concrete cushion by built-in fitting, and said built-in fitting comprises steel plate, steel pipe and nut, said nut and steel plate welding, and said steel pipe socket is contained in the nut outside, said steel pipe and steel plate welding.
Preferably, above-mentioned longeron is provided with 7, and said crossbeam is provided with 2, and said crossbeam and longeron are i iron.
Adopt the beneficial effect that technique scheme produced to be: the steel work base of the utility model is placed on the good concrete cushion of construction; And fix through built-in fitting; And the concrete weight coating piece is placed on the steel work base; This convenience quick for installation, also relatively rapider during dismounting, and the on-the-spot residual garbage in dismounting back is few; The bracing or strutting arrangement of the utility model comprises a plurality of trussed constructions, and firm performance is good, and owing to be provided with anchor ear and leading screw, the flexibility during construction increases greatly, and the adjustable support angle is convenient to install; Communications equipment room adopts the container-type machine room, and easy accessibility can reuse.
Description of drawings
Fig. 1 is first sketch map of the utility model;
Fig. 2 is second sketch map of the utility model;
Fig. 3 is the sketch map of built-in fitting;
Wherein, 1, first column; 2, first horizontal support; 3, first bearing diagonal; 4, anchor ear; 5, communication tower; 6, first junction plate; 7, the 3rd bearing diagonal; 8, second bearing diagonal; 9, second horizontal support; 10, second junction plate; 11, second column; 12, the 4th bearing diagonal; 13, longeron; 14, concrete weight coating piece; 15, reinforcing rib; 16, communications equipment room; 17, crossbeam; 18, flange; 19, nut; 20, steel plate; 21, steel pipe; 22, protected apron; 23, leading screw; 24, built-in fitting hole.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the utility model is done further detailed explanation.
Referring to accompanying drawing 1, accompanying drawing 2 and accompanying drawing 3, the utility model comprises steel work base, communications equipment room 16, communication tower 5 and supporting bracing or strutting arrangement, the concrete weight coating piece 14 that said steel work base comprises bottom girder and is located at the bottom girder top; Said bottom girder comprise 7 longerons 13 being arranged side by side and with said longeron 13 vertically disposed two crossbeams 17; Crossbeam 17 is located at longeron 13 tops; Said longeron 13 and crossbeam 17 Bolt Connection, crossbeam 17 can be selected according to the site operation needs with the quantity of longeron 13; Said concrete weight coating piece 14 is symmetrically set in the bottom girder top; And should the symmetry be positioned at bottom girder four angles on; Be reserved with certain clearance between two adjacent concrete weight coating pieces 14 parallel, be fixed with protected apron 22, can prevent that accessories such as bolt from losing at this gap location with crossbeam 17; Also can play a protective role, prevent bump communications equipment room 16; Communications equipment room 16 is fixed in the place that longeron 13 and crossbeam 17 intersect through flange during installation.
Said bracing or strutting arrangement comprises fixed support and adjustable supports; Said fixed support comprises first column 1 and second column 11; Said first column 1 respectively is provided with one in the both sides of communication tower 5; Between said second column 11 and first column 1 across communications equipment room 16; Two first columns 1 are connected with communication tower 5 with first bearing diagonal 3 by first horizontal support 2 respectively; Said second column 11 is hinged by second bearing diagonal 8 and communication tower 5, and said second column 11 is connected these second horizontal support, 9 employing angle steel with first column 1, communication tower 5 respectively via three second horizontal supports 9; An end that is provided with the 4th bearing diagonal 12, the four bearing diagonals 12 between said first column 1 and the steel work base is articulated on the steel work base; Said movable supporting comprises anchor ear 4 and the 3rd bearing diagonal 7; Said anchor ear 4 is fixed on the communication tower 5; Its position can up-down adjustment, and said the 3rd bearing diagonal 7 one ends are hinged with first junction plate 6 that is fixed on the anchor ear 4, and the other end is provided with leading screw 23; Said leading screw 23 is connected with second junction plate 10 of being located at communications equipment room 16 tops, regulates through the lead screw pair that is provided with; Said the 3rd bearing diagonal 7 is provided with two, and two the 3rd bearing diagonals 7 are symmetrically set in the both sides of communication tower 5.
The above steel work base is fixed on the concrete cushion by built-in fitting; Said built-in fitting comprises steel plate 20, steel pipe 21 and nut 19; Said nut 19 and steel plate 20 welding, said steel pipe 21 is sleeved on nut 19 outsides, said steel pipe 21 and steel plate 20 welding.After remove the base station, can only see a screwed hole in situ, be convenient to recover landforms.The quantity of built-in fitting is selected as required during installation, and multiple spot is connected between built-in fitting and the steel work base, can strengthen the resistance to plucking ability of steel work base, and security performance is better.
Be provided with 7 with above-mentioned longeron 13, said crossbeam 17 is provided with 2, and said crossbeam 17 and longeron 13 are i iron, and wherein the number of longeron 13 should be odd number, can make communication tower 5 be installed in the centre position like this.
The above communications equipment room 16 is the machine room of container-type structure, and it becomes an overall structure, is convenient to disassembled for transport; Structure is firm; Can be repeatedly used, this communications equipment room 16 can be realized the Fast Installation of base station by being bolted on the steel work base.Communications equipment room 16 tops are provided with second junction plate 10.
The utility model floor space is less, does not need degree of depth excavation, and construction period is shorter, and what vestige installation, convenient disassembly do not stay after the dismounting, bring convenience to emergency communication, and repeatedly dismounting is easy to transportation.The utility model addressing can disposablely be installed after accomplishing, and engineering quantity is little, networking rapidly, and the concrete weight coating piece can use after having built 7 days, thereby has shortened the construction period of base station.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the utility model.Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined General Principle can realize under the situation of spirit that does not break away from the utility model or scope in other embodiments among this paper.Therefore, the utility model will can not be restricted to these embodiment shown in this paper, but will meet and principle disclosed herein and features of novelty the wideest corresponding to scope.

Claims (4)

1. portable fast-assembling base station, it comprises steel work base, communications equipment room (16), communication tower (5) and supporting bracing or strutting arrangement, it is characterized in that: the concrete weight coating piece (14) that said steel work base comprises bottom girder and is located at the bottom girder top; Said bottom girder comprise at least 5 longerons (13) of being arranged side by side and with vertically disposed at least two crossbeams of said longeron (13) (17), said longeron (13) is fixedly connected with crossbeam (17); Said concrete weight coating piece (14) is symmetrically set on four angles of bottom girder, leaves the gap between two adjacent concrete weight coating pieces (14) parallel with crossbeam (17), is fixed with protected apron (22) at this gap location;
Said bracing or strutting arrangement comprises fixed support and adjustable supports; Said fixed support comprises first column (1) and second column (11); Said first column (1) is positioned at a side of communications equipment room (16) and respectively is provided with one in the both sides of communication tower (5); Said second column (11) is positioned at the opposite side of communications equipment room (16); First column (1) of both sides is connected with communication tower (5) with first bearing diagonal (3) by first horizontal support (2) respectively; Said second column (11) is hinged by second bearing diagonal (8) and communication tower (5); Said second column (11) is connected with first column (1), communication tower (5) respectively via second horizontal support (9), is provided with the 4th bearing diagonal (12) between said first column (1) and the steel work base; Said movable supporting comprises anchor ear (4) and the 3rd bearing diagonal (7); Said anchor ear (4) is fixed on the communication tower (5); Said the 3rd bearing diagonal (7) one ends are hinged with first junction plate (6) that is fixed on the anchor ear (4); The other end is provided with leading screw (23), and said leading screw (23) is connected with second junction plate (10) of being located at communications equipment room (16) top; Said the 3rd bearing diagonal (7) is provided with two, and two the 3rd bearing diagonals (7) are about communication tower (5) symmetry;
Said communications equipment room (16) is the container-type machine room.
2. portable fast-assembling according to claim 1 base station; It is characterized in that: said steel work base is fixed on the concrete cushion by built-in fitting; Said built-in fitting comprises steel plate (20), steel pipe (21) and nut (19); Said nut (19) is sleeved on nut (19) outside with steel plate (20) welding, said steel pipe (21), said steel pipe (21) and steel plate (20) welding.
3. portable fast-assembling according to claim 1 and 2 base station is characterized in that: said longeron (13) is provided with 7, and said crossbeam (17) is provided with 2, and said crossbeam (17) and longeron (13) are i iron.
4. portable fast-assembling according to claim 1 base station is characterized in that: said communication tower (5) is fixed in longeron (13) and crossbeam (17) infall.
CN201120201512U 2011-06-15 2011-06-15 Movable fast-assembling base station Expired - Fee Related CN202131798U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120201512U CN202131798U (en) 2011-06-15 2011-06-15 Movable fast-assembling base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120201512U CN202131798U (en) 2011-06-15 2011-06-15 Movable fast-assembling base station

Publications (1)

Publication Number Publication Date
CN202131798U true CN202131798U (en) 2012-02-01

Family

ID=45520571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120201512U Expired - Fee Related CN202131798U (en) 2011-06-15 2011-06-15 Movable fast-assembling base station

Country Status (1)

Country Link
CN (1) CN202131798U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605974A (en) * 2012-03-26 2012-07-25 电联工程技术股份有限公司 Counterweight ground beam for quick assembly type communication base station and method for assembling counterweight ground beam
CN104775523A (en) * 2015-03-18 2015-07-15 成都绿迪科技有限公司 Building location support
CN108179913A (en) * 2018-02-11 2018-06-19 电联工程技术股份有限公司 A kind of bracing means of portable base station
CN108412287A (en) * 2018-02-11 2018-08-17 电联工程技术股份有限公司 A kind of bracing means of communication by simple means bar base station
CN112080316A (en) * 2020-09-17 2020-12-15 山东联化新材料有限责任公司 Intelligent coke drum preheating device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102605974A (en) * 2012-03-26 2012-07-25 电联工程技术股份有限公司 Counterweight ground beam for quick assembly type communication base station and method for assembling counterweight ground beam
CN104775523A (en) * 2015-03-18 2015-07-15 成都绿迪科技有限公司 Building location support
CN108179913A (en) * 2018-02-11 2018-06-19 电联工程技术股份有限公司 A kind of bracing means of portable base station
CN108412287A (en) * 2018-02-11 2018-08-17 电联工程技术股份有限公司 A kind of bracing means of communication by simple means bar base station
CN112080316A (en) * 2020-09-17 2020-12-15 山东联化新材料有限责任公司 Intelligent coke drum preheating device
WO2022057147A1 (en) * 2020-09-17 2022-03-24 山东联化新材料有限责任公司 Intelligent coke tower preheating device

Similar Documents

Publication Publication Date Title
CN202131798U (en) Movable fast-assembling base station
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN202810173U (en) Mounting and construction platform for steel lining bracket and circular crane track girder of nuclear power plant
CN202117074U (en) Foundation bed steel structure for positioning and mounting base of tower crane
CN203223003U (en) Detachable triangular jig frame for steel truss assembling
CN103266778A (en) Detachable triangular scaffold and steel truss assembly construction method
CN203820313U (en) Labor protecting platform for gantry crane and capable of realizing folding
CN107881924A (en) A kind of bent cap support
CN203145470U (en) Combined platform for construction
CN202658590U (en) Integral assembled drilling platform
CN102051927B (en) Parallel buckling restrained brace structure and construction method thereof
CN103601078A (en) Suspension type hoisting equipment
CN211006346U (en) Cast-in-place support of side span of dismouting of being convenient for suitable for bridge
JP2003074213A (en) Construction method for newly constructed tower and modification method for existing tower
JP5235603B2 (en) Solar cell array and installation structure thereof
CN202148533U (en) Steel structure base for movable base station
CN210006884U (en) multifunctional roof antenna supporting device with self-counterweight and anti-overturning functions
CN211142816U (en) Construction platform
CN206591796U (en) Movable Scaffold with overhanging type operating platform
CN206256384U (en) Large-span steel box beam support system
CN219604558U (en) Connecting structure for roof net rack and concrete column
CN218712232U (en) Double-layer beam storage bracket for I-shaped steel-concrete combined beam
JP2019173365A (en) Method of constructing linear structure
CN102561383A (en) Tower crane base mounting method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120201

Termination date: 20200615