CN202117072U - 输电线路铁塔装配式基础 - Google Patents
输电线路铁塔装配式基础 Download PDFInfo
- Publication number
- CN202117072U CN202117072U CN2011201903286U CN201120190328U CN202117072U CN 202117072 U CN202117072 U CN 202117072U CN 2011201903286 U CN2011201903286 U CN 2011201903286U CN 201120190328 U CN201120190328 U CN 201120190328U CN 202117072 U CN202117072 U CN 202117072U
- Authority
- CN
- China
- Prior art keywords
- transmission line
- power transmission
- bottom plate
- iron tower
- type base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Electric Cable Installation (AREA)
- Foundations (AREA)
Abstract
本实用新型涉及输电线路铁塔的基础,特别是一种输电线路铁塔偏心装配式基础,该基础包括支架立柱、与支架立柱底部相连的底板,其特征在于上述底板是由上底板和下底板组成,上底板和下底板均为混凝土板条,其中上底板与支架立柱的底部通过锚栓固定相连,上底板的混凝土板条与下底板的混凝土板条的中心线成90°分布,上底板和下底板之间通过锚栓固定相连,在支架立柱周围水平铺设有加筋土工合成材料。本实用新型的技术方案具有可直接在施工现场拼装,基础的抗拔和抗倾覆稳定性好等特点,适合缺少水及砂石采集及运输较困难的沙漠地区使用。
Description
技术领域
本实用新型涉及输电线路铁塔的基础,特别是一种输电线路铁塔装配式基础。
背景技术
风积沙是沙被风沙流搬移到冲积平原地区形成的沙丘上筛选沉积下来的,具有结构松散、级配不良、孔隙率大、强度较低等特点。风积沙属于在沙漠中建设输电线路时必须要经过的特殊土区域之一,由于风积沙无粘聚力,且质地松散、沙体流动性大,因而风积沙地区输电线路杆塔基础埋深很难保证,基础稳定性差。现有的混凝土基础,由于风积沙地区缺水及砂石采集、运输较困难,造成现场施工困难等问题,而钢架式基础由于基础稳定性差,很难满足高电压等级的输电线路杆塔基础的抗拔和抗倾覆稳定性的要求。
发明内容
本实用新型的目的是解决现有输电线路在沙漠地区基础施工困难,提供一种自重轻、断面小,可直接在施工现场拼装,且基础的抗拔和抗倾覆稳定性好的输电线路铁塔装配式基础。
本实用新型的技术方案是:一种输电线路铁塔装配式基础,包括支架立柱、与支架立柱底部相连的底板,其特征在于上述底板是由上底板和下底板组成,上底板和下底板均为混凝土板条,其中上底板与支架立柱的底部通过锚栓固定相连,上底板的混凝土板条与下底板的混凝土板条的中心线成90°分布,上底板和下底板之间通过锚栓固定相连,在支架立柱周围水平铺设有加筋土工合成材料。
上述支架立柱为组装式钢架结构。
上述加筋土工合成材料为土工格栅。
本实用新型的技术方案具有以下特点:1、采用自重轻、断面小的混凝土板条作为装配式基础,可直接在施工现场拼装,在缺少水及砂石采集较困难的沙漠地区使用,一方面能有效提高机械化施工水平,提高工程建设标准和施工质量,大大降低施工人员的劳动强度;另一方面可有效解决沙漠地区输电线路杆塔基础的施工问题;2、埋设在基础底板上部成层的土工合成材料中的土工格栅与土工织物具有良好的抗拉强度、撕裂强度和较高的延展性、耐久性,针对输电线路杆塔基础主要承受抗拔荷载和倾覆荷载的特殊性,在风积沙地基往往铺设多层土工合成材料形成加筋复合地基,利用土工合成材料的上述工程特性,可使风积沙土体获得较高的准粘聚力,提高土体的抗剪、抗拉强度,增强风积沙地基的承载能力,提高输电线路杆塔基础的抗拔和抗倾覆稳定性。
附图说明
附图1为本实用新型结构示意图;
附图2为附图1的A-A剖视图。
具体实施方式
如图1、2所示,输电线路铁塔装配式基础是由钢架结构的支架立柱1和固定安装在支架立柱底部的底板组成。钢架结构的支架立柱可以制作成组装式的结构,将各构件在现场组装。由混凝土板条组合而成的底板是由上底板2和下底板3组合而成,其中上底板与支架立柱的底部通过锚栓5固定相连,上底板的混凝土板条与下底板的混凝土板条的中心线成90°分布,上底板和下底板之间通过锚栓固定相连,将上下混凝土板条连为整体,在支架立柱周围水平铺设有加筋土工合成材料6。
使用时,在需要设置基础的位置按设计要求挖出基础坑,在基础坑坑底初步整平后,铺设10cm后的小碎石,夯实整平。在基础坑坑底依次铺设下底板、上底板、基础立柱,完成装配式基础的现场组装。其中下底板预埋入螺杆,与上底板之间通过螺帽4锚固成整体;基础立柱与下底板、上底板之间也通过埋置在下底板的锚栓5连接成整体。回填过程中,在支架立柱周围水平埋设加筋土工合成材料6,加筋土工合成材料中主要指土工格栅,相邻层间隔根据施工现场的地质情况,可设计为30cm—50cm,通过埋设土工格栅可又要的提高风积沙地基的整体抗拔和抗剪切性能。回填后使基础顶板露出地面,就可进行输电线路杆塔的安装。
Claims (3)
1. 一种输电线路铁塔装配式基础,包括支架立柱、与支架立柱底部相连的底板,其特征在于上述底板是由上底板(2)和下底板(3)组成,上底板和下底板均为混凝土板条,其中上底板与支架立柱(1)的底部通过锚栓固定相连,上底板的混凝土板条与下底板的混凝土板条的中心线成90°分布,上底板和下底板之间通过锚栓固定相连,在支架立柱周围水平铺设有加筋土工合成材料(6)。
2. 根据权利要求1所述的输电线路铁塔装配式基础,其特征在于上述支架立柱(1)为组装式钢架结构。
3. 根据权利要求2所述的输电线路铁塔装配式基础,其特征在于上述加筋土工合成材料(6)为土工格栅。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201903286U CN202117072U (zh) | 2011-06-08 | 2011-06-08 | 输电线路铁塔装配式基础 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201903286U CN202117072U (zh) | 2011-06-08 | 2011-06-08 | 输电线路铁塔装配式基础 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202117072U true CN202117072U (zh) | 2012-01-18 |
Family
ID=45458146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201903286U Expired - Lifetime CN202117072U (zh) | 2011-06-08 | 2011-06-08 | 输电线路铁塔装配式基础 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202117072U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104234071A (zh) * | 2014-09-17 | 2014-12-24 | 国家电网公司 | 一种预制可拼装输电线路塔基及施工方法 |
CN106436741A (zh) * | 2016-09-09 | 2017-02-22 | 成都九十度工业产品设计有限公司 | 一种便于拆装的塔基 |
CN107893427A (zh) * | 2017-12-13 | 2018-04-10 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种用于输电线路的预制装配式空心板柱基础 |
CN107964979A (zh) * | 2017-12-26 | 2018-04-27 | 国家电网公司 | 一种输电线路组合结构装配式承台锚杆基础 |
CN108625387A (zh) * | 2018-04-02 | 2018-10-09 | 国网浙江省电力有限公司台州供电公司 | 一种输电塔用板条卯榫装配式基础及施工方法 |
-
2011
- 2011-06-08 CN CN2011201903286U patent/CN202117072U/zh not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104234071A (zh) * | 2014-09-17 | 2014-12-24 | 国家电网公司 | 一种预制可拼装输电线路塔基及施工方法 |
CN106436741A (zh) * | 2016-09-09 | 2017-02-22 | 成都九十度工业产品设计有限公司 | 一种便于拆装的塔基 |
CN106436741B (zh) * | 2016-09-09 | 2018-12-14 | 成都九十度工业产品设计有限公司 | 一种便于拆装的塔基 |
CN107893427A (zh) * | 2017-12-13 | 2018-04-10 | 中国电力工程顾问集团西北电力设计院有限公司 | 一种用于输电线路的预制装配式空心板柱基础 |
CN107964979A (zh) * | 2017-12-26 | 2018-04-27 | 国家电网公司 | 一种输电线路组合结构装配式承台锚杆基础 |
CN108625387A (zh) * | 2018-04-02 | 2018-10-09 | 国网浙江省电力有限公司台州供电公司 | 一种输电塔用板条卯榫装配式基础及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101487355B (zh) | 一种电线杆及其安装固定方法 | |
CN202117072U (zh) | 输电线路铁塔装配式基础 | |
CN202899165U (zh) | 一种公路路基t形壁板式挡墙结构 | |
CN202881845U (zh) | 一种公路桥梁加筋土柔性桥台 | |
CN202117073U (zh) | 输电线路铁塔偏心装配式基础 | |
CN107386031B (zh) | 高速公路改扩建工程结合部的处理方法 | |
CN104234061A (zh) | 一种加筋生态混凝土护坡及其施工方法 | |
CN103306301A (zh) | 基于围护桩与地下室底板的桩基基础结构及其施工方法 | |
CN105040727A (zh) | 一种滑坡防治的整体式加筋土挡墙结构及施工方法 | |
CN210194361U (zh) | 道路加宽新旧路基拼接结构 | |
CN201665875U (zh) | 轻型重力式抗震混凝土挡土墙 | |
CN205348221U (zh) | 分节式预制空腹挡墙砌块及挡墙结构 | |
KR101258043B1 (ko) | 친환경 옹벽 구조체 및 그 설치 방법 | |
CN208604438U (zh) | 软土地区高路堤支挡结构 | |
CN201843135U (zh) | 送电线路复合基础桩 | |
CN203741848U (zh) | 钢管板式支挡结构 | |
CN203498860U (zh) | 光伏组件支架带混凝土块的锚杆基础结构 | |
CN202492856U (zh) | 钢筋混凝土桩式扶壁挡土墙 | |
CN109681212B (zh) | 小断面黄土隧道的开挖施工方法 | |
CN206457838U (zh) | 一种用于输电塔的装配式基础 | |
CN106245546A (zh) | 一种波纹钢管廊结构 | |
CN103410155B (zh) | 一种可回收前置装配式支撑围护结构及其应用方法 | |
CN203049607U (zh) | 防风加固的砼杆套筒基础 | |
CN109898531A (zh) | 重力式装配混凝土挡土墙 | |
CN102174810A (zh) | 软土上建筑垃圾场地基加固构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 750001 Dalian Road, Jinfeng District, Yinchuan, the Ningxia Hui Autonomous Region 3120 Patentee after: The Ningxia Hui Autonomous Region Electric Power Design Institute Co., Ltd. Address before: 750001 277 the Great Wall East Road, Xingqing District, Yinchuan, the Ningxia Hui Autonomous Region Patentee before: Ningxia Hui Autonomous Region Electric Power Design Institute |
|
CP03 | Change of name, title or address | ||
CX01 | Expiry of patent term |
Granted publication date: 20120118 |
|
CX01 | Expiry of patent term |