CN202114803U - 后张预应力桥梁压浆封堵盖杯 - Google Patents

后张预应力桥梁压浆封堵盖杯 Download PDF

Info

Publication number
CN202114803U
CN202114803U CN2011201667461U CN201120166746U CN202114803U CN 202114803 U CN202114803 U CN 202114803U CN 2011201667461 U CN2011201667461 U CN 2011201667461U CN 201120166746 U CN201120166746 U CN 201120166746U CN 202114803 U CN202114803 U CN 202114803U
Authority
CN
China
Prior art keywords
cup
mud jacking
post
blockage
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201667461U
Other languages
English (en)
Inventor
刘延良
张法刚
王永新
李永胜
孙宏斌
李成栓
杨勇
别新胜
杜志强
许青平
杨鹏飞
吴仁友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd, Construction and Installation Engineering Co Ltd of China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN2011201667461U priority Critical patent/CN202114803U/zh
Application granted granted Critical
Publication of CN202114803U publication Critical patent/CN202114803U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型为解决后张预应力桥梁压浆前对锚具端头快速有效封堵问题,提供一种后张预应力桥梁压浆封堵盖杯,该封堵盖杯包括杯体和杯沿,杯体的高度大于锚具上预应力钢筋的外露长度,杯沿端面上开有止水槽。封堵盖杯扣盖于锚具之上,在杯沿和锚具之间放置胶垫。本实用新型解决了压浆前锚具封堵难题,封堵盖杯安装后,立即可以进行压浆,节省了以往等待水泥浆硬化的时间,提高了工作效率,大大加快了施工进度。

Description

后张预应力桥梁压浆封堵盖杯
技术领域
本实用新型涉及一种封堵装置,具体为一种对后张预应力桥梁压浆前对锚具端头进行封堵的装置。
背景技术
后张预应力桥梁在预应力筋张拉后必须及时进行管道压浆。为保证压浆达到规定压力而不跑浆,对锚具端头上夹片周边缝隙必须进行封堵。以往的封堵方法是用水泥浆抹在锚具端头上,来封堵缝隙。但该方法存在费工费料和必须等待数日,等水泥浆硬化后才能压浆等问题,严重影响压浆的进度和质量。
发明内容
为解决后张预应力桥梁压浆前对锚具端头快速有效封堵问题,本实用新型提供一种后张预应力桥梁压浆封堵盖杯。
为解决上述问题,本实用新型所述的一种后张预应力桥梁压浆封堵盖杯,包括杯体和杯沿,杯体的高度大于锚具上预应力钢筋的外露长度。使用时,将封堵盖杯扣盖于锚具之上,在杯沿和锚具之间放置胶垫。在杯沿上孔中穿入螺栓,拧入预埋喇叭口的螺丝孔中,将封堵盖杯压紧于锚具之上。
与现有技术相比,本实用新型提供的后张预应力桥梁压浆封堵盖杯,解决了压浆前锚具封堵难题,封堵盖杯安装后,立即可以进行压浆,节省了以往等待水泥浆硬化的时间,提高了工作效率,大大加快了施工进度,可节约大量封堵用的水泥材料,同时可节省压浆前抹封堵水泥浆和压浆后凿除水泥浆的大量人工。
附图说明
图1为本实用新型后张预应力桥梁压浆封堵盖杯的结构示意图。
图2为图1为的A-A剖视图。
图3为本实用新型的使用参考图。
图中,1-杯体,2-杯沿,3-止水槽,4-锚具,5-预应力钢筋,6-孔,7-缺口,8-胶垫,9-螺栓。
具体实施方式
以下结合附图对本实用新型做具体说明。
本实用新型所述的一种后张预应力桥梁压浆封堵盖杯,包括杯体1和杯沿2,杯体1的高度大于锚具4上预应力钢筋5的外露长度。
杯体1的内径应与所用的锚具4相符,贴靠于锚具4上预应力钢筋5的外侧。杯沿2的外径应与梁体上预埋的喇叭口相配套,杯沿2上钻有四个孔6,孔6的直径、间距与喇叭口上原有的螺丝孔的直径、间距相同。杯沿2上还留有一个缺口7,用于安装压浆管。封堵盖杯扣盖于锚具4之上,在杯沿2和锚具4之间放置胶垫8。在杯沿2上孔中穿入螺栓9,拧入预埋喇叭口的螺丝孔中,将封堵盖杯压紧于锚具4之上。
为提高密封效果,杯沿2端面上开有止水槽3。整个封堵盖杯由铸铁整体铸造或用钢材焊接而成,要求整体严密,无砂眼、裂纹等漏气之处。主体加工成型后,再用车床对杯沿端面进行车削加工平整和车出两道止水槽3。
本实用新型构突破以往压浆以水泥浆封堵锚具的模式,创新设计了封堵盖杯工装,巧妙利用已预埋于梁内的喇叭口上的螺丝孔将封堵盖杯压紧于锚具之上,解决了压浆前锚具封堵难题。安装时采用在杯沿2上设置止水槽3和胶垫相配合的方式,解决了杯沿2和锚具4端面间密封难题,保证了压浆需要的密封效果。封堵盖杯安装后,可立即可以进行压浆,节省了以往等待水泥浆硬化的时间,提高了工作效率,大大加快了施工进度。还具有投入少、经济效益的优点,一个桥梁预制厂(场),只需投入一孔(片)梁压浆需要数量的封堵盖杯即可满足周转,可节约大量封堵用的水泥材料,同时可节省压浆前抹封堵水泥浆和压浆后凿除水泥浆的大量人工。

Claims (2)

1.一种后张预应力桥梁压浆封堵盖杯,其特征在于:包括杯体(1)和杯沿(2),杯体(1)的高度大于锚具上预应力钢筋的外露长度。
2.根据权利要求1所述的后张预应力桥梁压浆封堵盖杯,其特征在于:杯沿(2)端面上开有止水槽(3)。
CN2011201667461U 2011-05-24 2011-05-24 后张预应力桥梁压浆封堵盖杯 Expired - Lifetime CN202114803U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201667461U CN202114803U (zh) 2011-05-24 2011-05-24 后张预应力桥梁压浆封堵盖杯

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201667461U CN202114803U (zh) 2011-05-24 2011-05-24 后张预应力桥梁压浆封堵盖杯

Publications (1)

Publication Number Publication Date
CN202114803U true CN202114803U (zh) 2012-01-18

Family

ID=45455899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201667461U Expired - Lifetime CN202114803U (zh) 2011-05-24 2011-05-24 后张预应力桥梁压浆封堵盖杯

Country Status (1)

Country Link
CN (1) CN202114803U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386409A (zh) * 2015-11-18 2016-03-09 浙江金筑交通建设有限公司 预应力梁板锚端防流浆机构及预应力梁板注浆方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386409A (zh) * 2015-11-18 2016-03-09 浙江金筑交通建设有限公司 预应力梁板锚端防流浆机构及预应力梁板注浆方法
CN105386409B (zh) * 2015-11-18 2017-05-03 浙江金筑交通建设有限公司 预应力梁板锚端防流浆机构及预应力梁板注浆方法

Similar Documents

Publication Publication Date Title
CN101634149B (zh) 预应力锚杆基坑支护及施工方法
CN202000380U (zh) 地下室外墙后浇带回填保护板
CN213625733U (zh) 一种地铁车站侧墙防水结构
CN104088254B (zh) 承压钢筋混凝土构筑物泄漏修复装置及其施工方法
CN110952996B (zh) 一种纤维网格增强聚合物砂浆加固电力隧道的方法与材料
CN202745404U (zh) 钢筋混凝土烟囱筒壁开孔取样后的外部修复补强装置
CN102828468A (zh) 高温干燥环境下高强薄壁箱梁预制裂缝控制施工方法
CN102808414A (zh) 灌注混凝土结构物有粘结后张预应力锚固施工方法
CN202731936U (zh) 隧道仰拱端模
CN105929108B (zh) 预应力孔道压浆质量检测方法
CN202114803U (zh) 后张预应力桥梁压浆封堵盖杯
CN202293023U (zh) 一种后张法预应力管道压浆密封罩
KR100940937B1 (ko) 콘크리트 구조물 보수보강 공법
CN210508385U (zh) 剪力墙穿墙套管加固结构
CN110080181B (zh) 水工隧洞止浆结构及其布置方法
CN107905551B (zh) 墙体的加固结构施工方法
CN104805864A (zh) 地下室逆作法外墙企口与止水胶结合防水施工工艺
CN201292528Y (zh) 一种注浆器
CN104911999A (zh) 深埋锚施工方法
CN202492808U (zh) 用于箱梁管道压浆施工中的压浆帽
CN209874074U (zh) 一种多孔斜面注浆预埋管
CN202416316U (zh) 一种可用于快速支护的永久锚索墩头型式
CN204899958U (zh) 一种防滑锚索
CN202194137U (zh) 用于土质固定的中空灌浆紧固件
CN2707819Y (zh) 注浆排气封孔装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20120118

CX01 Expiry of patent term