CN202066381U - 推钢式加热炉过渡水梁的稳定结构 - Google Patents

推钢式加热炉过渡水梁的稳定结构 Download PDF

Info

Publication number
CN202066381U
CN202066381U CN2011200873118U CN201120087311U CN202066381U CN 202066381 U CN202066381 U CN 202066381U CN 2011200873118 U CN2011200873118 U CN 2011200873118U CN 201120087311 U CN201120087311 U CN 201120087311U CN 202066381 U CN202066381 U CN 202066381U
Authority
CN
China
Prior art keywords
connecting plate
water beam
transition water
rock
heating furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200873118U
Other languages
English (en)
Inventor
谷硕
王达
缪洪斌
李柏林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baosteel Industrial Furnace Engineering Technology Co., Ltd.
Original Assignee
Shanghai Baosteel Industry Inspection Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baosteel Industry Inspection Corp filed Critical Shanghai Baosteel Industry Inspection Corp
Priority to CN2011200873118U priority Critical patent/CN202066381U/zh
Application granted granted Critical
Publication of CN202066381U publication Critical patent/CN202066381U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Tunnel Furnaces (AREA)
  • Heat Treatments In General, Especially Conveying And Cooling (AREA)

Abstract

本实用新型公开了一种推钢式加热炉过渡水梁的稳定结构,即连接板一侧与过渡水梁自由端固定连接,拉杆两端分别与连接板另一侧和加热炉基础铰接,连接板中心开有通孔,连接管穿入连接板通孔内并与炉内其过渡水梁连接,支撑杆底端设于加热炉本体,支撑平台水平设于支撑杆顶端,连接板底端位于支撑平台上。本稳定结构对过渡水梁自由端作有效支撑,提高了过渡水梁的稳定性,避免了钢坯在炉内的跑偏,保证了推钢式加热炉的正常运行。

Description

推钢式加热炉过渡水梁的稳定结构
技术领域
本实用新型涉及一种推钢式加热炉过渡水梁的稳定结构。
背景技术
目前根据炉内输料方式,现代中厚板连加热炉可分为推钢式和步进梁式两大类。推钢式加热炉的冷却系统中设有一组过渡水梁,过渡水梁通过立柱架设于炉内,而过渡水梁自由端无任何结构作稳定支撑,在推钢过程中过渡水梁将产生无规则晃动,造成钢坯在炉内的跑偏,支撑过渡水梁的立柱根部产生较大的应力,导致过渡水梁结构破坏,从而影响了推钢式加热炉的正常运行。
发明内容
本实用新型所要解决的技术问题是提供一种推钢式加热炉过渡水梁的稳定结构,本稳定结构对过渡水梁自由端作有效支撑,提高了过渡水梁的稳定性,避免了钢坯在炉内的跑偏,保证了推钢式加热炉的正常运行。
为解决上述技术问题,本实用新型推钢式加热炉过渡水梁的稳定结构包括通过立柱支撑的过渡水梁、连接板、支撑杆、支撑平台、拉杆和连接管,所述连接板一侧与所述过渡水梁自由端固定连接,所述拉杆两端分别与所述连接板另一侧和加热炉基础铰接,所述连接板中心开有通孔,所述连接管穿入所述连接板通孔内并与炉内其过渡水梁连接,所述支撑杆底端设于加热炉本体,所述支撑平台水平设于所述支撑杆顶端,所述连接板底端位于所述支撑平台上。
为使本稳定结构便于调节,上述稳定结构还包括内螺纹套筒,所述拉杆分为两段,所述两段拉杆相邻端设有外螺纹,所述两段拉杆的相邻端拧入所述内螺纹套筒内。
为避免本稳定结构的连接板底端与支撑平台直接接触的磨损,所述稳定结构还包括橡胶垫,所述橡胶垫设于所述连接板底端与支撑平台之间。    
由于本实用新型推钢式加热炉过渡水梁的稳定结构采用了上述技术方案,即连接板一侧与过渡水梁自由端固定连接,拉杆两端分别与连接板另一侧和加热炉基础铰接,连接板中心开有通孔,连接管穿入连接板通孔内并与炉内其过渡水梁连接,支撑杆底端设于加热炉本体,支撑平台水平设于支撑杆顶端,连接板底端位于支撑平台上。本稳定结构对过渡水梁自由端作有效支撑,提高了过渡水梁的稳定性,避免了钢坯在炉内的跑偏,保证了推钢式加热炉的正常运行。
附图说明
下面结合附图和实施方式对本实用新型作进一步的详细说明:
图1为本实用新型推钢式加热炉过渡水梁的稳定结构的示意图。
具体实施方式
如图1所示,本实用新型推钢式加热炉过渡水梁的稳定结构包括通过立柱2支撑的过渡水梁1、连接板3、支撑杆7、支撑平台6、拉杆4和连接管5,所述连接板3一侧与所述过渡水梁1自由端固定连接,所述拉杆4两端分别与所述连接板3另一侧和加热炉基础9铰接,所述连接板3中心开有通孔,所述连接管5穿入所述连接板3通孔内并与炉内其过渡水梁连接,所述支撑杆7底端设于加热炉本体8,所述支撑平台6水平设于所述支撑杆7顶端,所述连接板3底端位于所述支撑平台6上。连接管依次穿入一组过渡水梁各稳定结构的连接板通孔,使一组过渡梁之间相互连接在一起,进一步加强了各过渡水梁的稳定性。
为使本稳定结构便于调节,上述稳定结构还包括内螺纹套筒11,所述拉杆4分为两段,所述两段拉杆相邻端设有外螺纹,所述两段拉杆的相邻端拧入所述内螺纹套筒11内。通过两段拉杆在内螺纹套筒11内的拧动,可以调节两段拉杆牵拉连接板3的松紧,以调整过渡水梁1的稳定状态。
由于在加热炉运行过程中,过渡水梁难免存在微小的晃动,而连接板底端位于支撑平台上为柔性连接,为避免连接板底端与支撑平台直接接触的磨损,所述稳定结构还包括橡胶垫12,所述橡胶垫12设于所述连接板3底端与支撑平台6之间。橡胶垫的设置避免了磨损,也减缓了连接板底端与支撑平台直接接触的震动。
本稳定结构对过渡水梁自由端进行了有效支撑,用以增强过渡水梁在推钢过程中的稳定性,延长过渡水梁的寿命,减少其故障率,降低了维护成本。

Claims (3)

1.一种推钢式加热炉过渡水梁的稳定结构,包括通过立柱支撑的过渡水梁,其特征在于:还包括连接板、支撑杆、支撑平台、拉杆和连接管,所述连接板一侧与所述过渡水梁自由端固定连接,所述拉杆两端分别与所述连接板另一侧和加热炉基础铰接,所述连接板中心开有通孔,所述连接管穿入所述连接板通孔内并与炉内其过渡水梁连接,所述支撑杆底端设于加热炉本体,所述支撑平台水平设于所述支撑杆顶端,所述连接板底端位于所述支撑平台上。
2.根据权利要求1所述的推钢式加热炉过渡水梁的稳定结构,其特征在于:所述稳定结构还包括内螺纹套筒,所述拉杆分为两段,所述两段拉杆相邻端设有外螺纹,所述两段拉杆的相邻端拧入所述内螺纹套筒内。
3.根据权利要求1或2所述的推钢式加热炉过渡水梁的稳定结构,其特征在于:所述稳定结构还包括橡胶垫,所述橡胶垫设于所述连接板底端与支撑平台之间。
CN2011200873118U 2011-03-29 2011-03-29 推钢式加热炉过渡水梁的稳定结构 Expired - Fee Related CN202066381U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200873118U CN202066381U (zh) 2011-03-29 2011-03-29 推钢式加热炉过渡水梁的稳定结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200873118U CN202066381U (zh) 2011-03-29 2011-03-29 推钢式加热炉过渡水梁的稳定结构

Publications (1)

Publication Number Publication Date
CN202066381U true CN202066381U (zh) 2011-12-07

Family

ID=45060242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200873118U Expired - Fee Related CN202066381U (zh) 2011-03-29 2011-03-29 推钢式加热炉过渡水梁的稳定结构

Country Status (1)

Country Link
CN (1) CN202066381U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952775A (zh) * 2017-02-27 2017-07-14 平高集团有限公司 一种拉杆组件及使用该拉杆组件的断路器

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106952775A (zh) * 2017-02-27 2017-07-14 平高集团有限公司 一种拉杆组件及使用该拉杆组件的断路器

Similar Documents

Publication Publication Date Title
CN201997832U (zh) 一种切割平台
CN206648827U (zh) 一种预制箱梁可调式静载试验反力架
CN202066381U (zh) 推钢式加热炉过渡水梁的稳定结构
CN103273163A (zh) 数控火焰切割钢板支撑胎架
CN201649771U (zh) 电力铁塔节点结构
CN105369745A (zh) 一种桥梁支座更换顶升反力架
CN205275647U (zh) 一种热轧保温坑的保温罩
CN102889001A (zh) 一种管桁架结构弦杆对接错位调节装置
CN203334298U (zh) 一种用于连接角撑和对撑标准件的连接盖板
CN202882112U (zh) 一种网架板式转动支座
CN201952103U (zh) 一种钢筋吊架
CN201228817Y (zh) 拼装式立管管夹
CN202224621U (zh) 一种控制中间罐下挠装置
CN202896278U (zh) 车用散热器安装支架
CN202990443U (zh) 一种管桁架结构弦杆对接错位调节装置
CN207230038U (zh) 一种钢套钢保温管用安装支架
CN203744587U (zh) 一种组合式太阳能工程联箱支架
CN102162637B (zh) 塔式超临界锅炉主钢架节点装置及连接方法
CN206571790U (zh) 一种钢结构连接件
CN2799151Y (zh) 一种带有焊接压力均衡分配装置的钢格板焊机
CN201295757Y (zh) 中包包盖操作孔盖板
CN206088888U (zh) 一种汽车维修用安全支架
CN103396813B (zh) 一种带斜拉杆的焦炉操作台结构
CN204225777U (zh) 一种可拆卸式挡风墙
CN202346905U (zh) 玻璃纤维水冷扁管式冷却器

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BAOSTEEL INDUSTRIAL FURNACE ENGINEERING TECHNOLOGY

Free format text: FORMER OWNER: SHANGHAI BAOSTEEL INDUSTRY INSPECTION CORP.

Effective date: 20130304

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130304

Address after: 201900 room 503-C, room 1, building 1508, Mudanjiang Road, Shanghai, Baoshan District, 5

Patentee after: Baosteel Industrial Furnace Engineering Technology Co., Ltd.

Address before: 201900 Shanghai city Baoshan District Meipu Road No. 335

Patentee before: Shanghai Baosteel Industry Inspection Corp.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111207

Termination date: 20140329