CN202064357U - Spacing headframe - Google Patents

Spacing headframe Download PDF

Info

Publication number
CN202064357U
CN202064357U CN 201120087447 CN201120087447U CN202064357U CN 202064357 U CN202064357 U CN 202064357U CN 201120087447 CN201120087447 CN 201120087447 CN 201120087447 U CN201120087447 U CN 201120087447U CN 202064357 U CN202064357 U CN 202064357U
Authority
CN
China
Prior art keywords
iron
beams
headframe
spacing
steel casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120087447
Other languages
Chinese (zh)
Inventor
石雅清
应文兵
浦朝钦
徐进文
林定权
韩荟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd, Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN 201120087447 priority Critical patent/CN202064357U/en
Application granted granted Critical
Publication of CN202064357U publication Critical patent/CN202064357U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a spacing headframe which comprises a steel casing. The spacing headframe is characterized in that transverse I-beams and longitudinal I-beams are arranged on the periphery of the steel casing and constitute a square structure, so as to form a first-layer headframe structure; bailey beams are arranged below the square structure; triangular corbels are respectively and fixedly welded to the inner sides of the transverse I-beams and the longitudinal I-beams; and a second-layer headframe structure is arranged below the bailey beams and comprises a steel pipe plane connection structure and another square structure formed by the transverse I-beams and the longitudinal I-beams, and the steel pipe plane connection structure is positioned below the square structure. The steel casing is placed to the double-layered headframe structure for positioning, which facilitates deep-water construction. The spacing headframe provided by the utility model has the benefits of time conservation, convenience, accuracy in positioning, and safety and reliability and is suitable for the positioning of deep-water structures.

Description

A kind of spacing well frame
Technical field
The utility model relates to a kind of well frame, specifically is a kind of spacing well frame.
Background technology
Along with Chinese economic development, bridge constructions such as over strait, rivers grand bridge, bridge are also more and more.Adopt of deep water pile foundation buried the construction that the steel casing carries out pile foundation underground more in the bridge construction at present.The general employing large ship of burying underground of steel casing is constructed, and for the ease of transferring of steel casing, in order to control the spatial positioning accuracy of steel casing well, generally is to transfer the location of transferring that the position is provided with steel leading truck control steel casing at the steel casing simultaneously.But because the influence that impacted by the fluctuation tidal water flow, rocking to a certain degree can appear in the construction ship, because of leading truck is fixed on the construction ship, also can occur rocking thereupon, cause the difficulty of locating, cause the location off normal and the inclination of steel casing easily, the construction of follow-up drilled pile is formed certain influence.
Summary of the invention
The utility model provides a kind of and has saved time, makes things convenient in order to remedy the deficiencies in the prior art, locatees accurate spacing well frame.
The utility model comprises the steel casing, its special character is: the periphery of described steel casing is provided with cross-bridges i iron and suitable bridge i iron, both form square structure, constitute first floor well shelf structure, foursquare below is provided with Bei Leiliang, the triangle bracket is fixedly welded on respectively on cross-bridges i iron and the suitable inboard of bridge i iron, the below of Bei Leiliang is provided with second layer well shelf structure, comprise the flat connection of steel pipe and cross-bridges i iron and the square structure that constitutes along the bridge i iron, the flat connection of steel pipe is positioned at foursquare below.The steel casing transferred in the double-deck well shelf structure position, be convenient to the deep water construction.
The bottom of described first floor well shelf structure is arranged with two row Bei Leiliang.The structure of symmetrical expression has like this added the fastness of whole engineering structures.
The beneficial effect of spacing well frame of the present utility model: save time, make things convenient for, the location accurately, and is safe and reliable, is suitable for the location of deep water structure.
Description of drawings
Fig. 1 is a facade structures schematic diagram of the present utility model;
Fig. 2 is a plane structure schematic diagram of the present utility model;
Among the figure: 1, triangle bracket, 2, the cross-bridges i iron, 3, Bei Leiliang, 4, the steel casing, 5, the flat connection of steel pipe, 6, along the bridge i iron.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further described:
Accompanying drawing is a kind of specific embodiment of the present utility model, this embodiment comprises steel casing 4, it is characterized in that: the periphery of described steel casing is provided with cross-bridges i iron 2 and suitable bridge i iron 6, both form square structure, constitute first floor well shelf structure, foursquare below is provided with shellfish thunder beam 3, the bottom of first floor well shelf structure is arranged with two row shellfish thunder beams 3, triangle bracket 1 is fixedly welded on respectively on cross-bridges i iron 2 and the suitable inboard of bridge i iron 6, the below of shellfish thunder beam 3 is provided with second layer well shelf structure, comprise flat connection 5 of steel pipe and cross-bridges i iron 2 and the square structure that constitutes along bridge i iron 6, the flat connection 5 of steel pipe is positioned at foursquare below.
The utility model in use, after finishing the operation platform substructure, according to the construction drawing measurement and positioning and lift shellfish thunder beam 3, carry out the construction of the sub-frame of double-deck driftway then, to go out with steel casing 4 planes be foursquare four angle points of inscribed circle to measurement and positioning respectively, the limit extended line of cross-bridges i iron 2 directions is positioned on the shellfish thunder beam 3, after cross-bridges i iron 2 is fixed, whether measurement is checked and is put accurately, the location is along the extended line of bridge i iron 6 directions simultaneously, re-lay along bridge i iron 6, and respectively relax 1 centimetre distance according to two ends and process and be decided to be that leading truck is about to that triangle bracket 1 is welded on cross-bridges i iron 2 and along on the bridge i iron 6, measurement and positioning accurately after, leading truck and platform and flat connection 5 welding of bottom steel pipe are fixed, can transfer steel casing 4.

Claims (2)

1. spacing well frame, comprise steel casing (4), it is characterized in that: the periphery of described steel casing (4) is provided with cross-bridges i iron (2) and suitable bridge i iron (6), both form square structure, constitute first floor well shelf structure, foursquare below is provided with Bei Leiliang (3), triangle bracket (1) is fixedly welded on respectively on cross-bridges i iron (2) and the suitable inboard of bridge i iron (6), the below of Bei Leiliang (3) is provided with second layer well shelf structure, comprise flat connection of steel pipe (5) and cross-bridges i iron (2) and the square structure that constitutes along bridge i iron (6), the flat connection of steel pipe (5) is positioned at foursquare below.
2. spacing well frame according to claim 1 is characterized in that: the bottom of described first floor well shelf structure is arranged with two row Bei Leiliang (3).
CN 201120087447 2011-03-29 2011-03-29 Spacing headframe Expired - Fee Related CN202064357U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120087447 CN202064357U (en) 2011-03-29 2011-03-29 Spacing headframe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120087447 CN202064357U (en) 2011-03-29 2011-03-29 Spacing headframe

Publications (1)

Publication Number Publication Date
CN202064357U true CN202064357U (en) 2011-12-07

Family

ID=45058223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120087447 Expired - Fee Related CN202064357U (en) 2011-03-29 2011-03-29 Spacing headframe

Country Status (1)

Country Link
CN (1) CN202064357U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535469A (en) * 2012-02-17 2012-07-04 中交武汉港湾工程设计研究院有限公司 Tool type guiding pile-sinking device
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN104895082A (en) * 2015-06-11 2015-09-09 中国铁建大桥工程局集团有限公司 Precise large-diameter steel casing deviation rectifying device and method
CN104929127A (en) * 2015-06-19 2015-09-23 中建海峡建设发展有限公司 Section steel positioning clip
CN109371970A (en) * 2018-11-13 2019-02-22 南通市海洋水建工程有限公司 One kind being used for offshore wind farm single pile pile sinking stable platform and its localization method
CN112681319A (en) * 2020-12-16 2021-04-20 上海建工四建集团有限公司 # -shaped beam for controlling perpendicularity of inserting and driving steel pipe piles and construction method
CN113832972A (en) * 2021-09-22 2021-12-24 中交路桥华南工程有限公司 Three-frame type guide frame and mounting method thereof

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535469B (en) * 2012-02-17 2014-07-30 中交武汉港湾工程设计研究院有限公司 Tool type guiding pile-sinking device
CN102535469A (en) * 2012-02-17 2012-07-04 中交武汉港湾工程设计研究院有限公司 Tool type guiding pile-sinking device
CN104278677B (en) * 2014-10-16 2016-01-20 葛洲坝集团基础工程有限公司 A kind of device and method for A/C in antiseepage wall chase section casting process
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN105155545B (en) * 2014-10-16 2016-12-07 中国葛洲坝集团基础工程有限公司 A kind of A/C device is used to carry out the method that conduit is fixing in antiseepage wall chase section casting process
CN105155545A (en) * 2014-10-16 2015-12-16 葛洲坝集团基础工程有限公司 Method for fixing guide tube by using guide tube fixing device in diaphragm wall slot segment pouring process
CN104895082A (en) * 2015-06-11 2015-09-09 中国铁建大桥工程局集团有限公司 Precise large-diameter steel casing deviation rectifying device and method
CN104929127A (en) * 2015-06-19 2015-09-23 中建海峡建设发展有限公司 Section steel positioning clip
CN109371970A (en) * 2018-11-13 2019-02-22 南通市海洋水建工程有限公司 One kind being used for offshore wind farm single pile pile sinking stable platform and its localization method
CN109371970B (en) * 2018-11-13 2023-11-07 南通市海洋水建工程有限公司 Single pile sinking stable platform for offshore wind power and positioning method thereof
CN112681319A (en) * 2020-12-16 2021-04-20 上海建工四建集团有限公司 # -shaped beam for controlling perpendicularity of inserting and driving steel pipe piles and construction method
CN113832972A (en) * 2021-09-22 2021-12-24 中交路桥华南工程有限公司 Three-frame type guide frame and mounting method thereof
CN113832972B (en) * 2021-09-22 2023-03-14 中交路桥华南工程有限公司 Three-frame type guide frame and mounting method thereof

Similar Documents

Publication Publication Date Title
CN202064357U (en) Spacing headframe
CN203393714U (en) Precisely positioned offshore piling guide frame
CN109594474A (en) A kind of limited bracket construction method of Long span S-shaped steel box-girder
CN201962661U (en) Offshore movable lifting multifunctional working platform
CN102094429B (en) Lowering control method of double-wall steel cofferdam
CN102587363A (en) Method for assembling truss framed leg of self-elevating drilling platform
CN103123016B (en) Construction method for laying gas pipelines along bridge
CN206503141U (en) A kind of overlength casing in bridge pile foundation construction is accurately positioned mounting tool
CN202240228U (en) Accurate butt-joint control device for large-span column-shaped cylinder body
CN104514201A (en) Bridge jacking applied three-axis parallel mechanism
CN109469089A (en) A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing and construction method
CN104250968B (en) From installation suction pile formula moveable platform structure
CN106812067A (en) A kind of removable operation platform for bridge construction
CN209538210U (en) A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing
CN205348183U (en) A novel guider for construction of driven pile pile sinking
CN104604766A (en) Net cage system with symmetrical wing type sections
CN103485356B (en) Overwater laying frame and method for filling sand pockets with same
CN108951856A (en) A kind of volume of concrete foundation cushion cap internal frame sky pedestal anchor bolt and its installation and locating method
CN101811555B (en) Section assembly control method of bulk freighter body in floating dock
CN102587280B (en) Main tower area steel truss girder erection method of base support auxiliary frame beam crane and base support
CN204491564U (en) A kind of jacket for offshore structure
CN204370314U (en) A kind of lower hanging steel bridge erects suspension rod
CN202925557U (en) Steel cofferdam assembled floating platform
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN207894876U (en) Sounding hole arrangement in tunnel surrounding explosion lesion depths acoustic detection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111207

Termination date: 20130329