CN202064351U - High-water-content soil texture pore-forming pile pipe - Google Patents

High-water-content soil texture pore-forming pile pipe Download PDF

Info

Publication number
CN202064351U
CN202064351U CN2011201552909U CN201120155290U CN202064351U CN 202064351 U CN202064351 U CN 202064351U CN 2011201552909 U CN2011201552909 U CN 2011201552909U CN 201120155290 U CN201120155290 U CN 201120155290U CN 202064351 U CN202064351 U CN 202064351U
Authority
CN
China
Prior art keywords
pipe
pile
pore
water
forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201552909U
Other languages
Chinese (zh)
Inventor
胡国宇
李庆刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI MCC20 ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
HEBEI MCC20 ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI MCC20 ENGINEERING TECHNOLOGY Co Ltd filed Critical HEBEI MCC20 ENGINEERING TECHNOLOGY Co Ltd
Priority to CN2011201552909U priority Critical patent/CN202064351U/en
Application granted granted Critical
Publication of CN202064351U publication Critical patent/CN202064351U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a high-water-content soil texture pore-forming pile pipe which is characterized in that a cover plate is arranged at the upper end opening of a pipe body in a sealed way, the lower end of the pipe body is a tapered pile tip part, the pile tip part is connected with the pipe body by a locking mechanism, a plurality of air exhausting holes are arranged on the pile tip part, and air inlet holes are arranged at the upper section of the pipe body. When the pore-forming operation on a high-water-content soil texture foundation is carried out, resistance-free sinking of a pile pipe can be ensured, an air channel passing through an inner cavity of the pile pipe is also formed, so that the air exhausting is smooth when the pile pipe is lifted, and the smooth lifting of the pile pipe can be realized; meanwhile, the scraping and the rubbing of a hole wall are eliminated, fall back soil in the pile pipe is limited to be lower than 200mm, the requirement of standard design is achieved, and the follow up multiple repeated soil-pulling-out operations are avoided. The high-water-content soil texture pore-forming pile pipe is suitable for the pore-forming operation of the pile pipes with various diameters.

Description

High moisture soil property pore-forming stake pipe
Technical field
The utility model relates to the pore-forming apparatus that a kind of building lot is handled usefulness, specifically a kind of high moisture soil property pore-forming stake pipe.
Background technology
In architectural process, ground is handled the job practices that is adopted, and mainly contains CFG castinplace pile, 37 lime earth compaction pile composite foundation, these three kinds of forms of deposited reinforced concrete pile.In the drilling construction process in all kinds of stakes hole, because used pore-forming equipment---the structure of stake pipe is unreasonable, in pore forming process with and subsequent stake pipe lifting process in, the capital constantly scrapes a topsoil of hole inwall, thereby in the sinking process of stake pipe and in the lifting process of stake pipe, produce a lot of falling soil at stake Kong Zhonghui, increased follow-up repetition soil digging operation repeatedly.
The utility model content
The purpose of this utility model just provides a kind of high moisture soil property pore-forming stake pipe, falls the more problem of soil after rise to solve drilling construction process king-pile hole.
The utility model is achieved in that a kind of high moisture soil property pore-forming stake pipe, upper port at body is sealed with cover plate, the lower end of body is the stake tip of taper, institute's improvements are, described stake tip is connected by blocking mechanism with described body, have the plurality of rows pore in described stake tip, have air inlet at the epimere of described body.
Described steam vent has 2-4, is uniformly distributed along the circumference in described stake tip.
The utility model is offered air inlet by the body epimere at the stake pipe, offers steam vent in the stake tip, thereby forms a kind of fenestration stake pipe.Use this fenestration stake pipe, when on the moisture earthen foundation of height, carrying out the pore-forming operation, both can guarantee that the non-resistance of a pipe sank, a gas circuit by the stake tube cavity can be provided again, solved thus when pulling out on the stake pipe and formed vacuum, the problem that causes a pipe to be difficult to extract in bottom, stake hole.Owing to cancelled the reinforced steel bar ring of original evagination in the stake pipe, correspondingly eliminated the scratch of reinforced steel bar ring to hole wall, it is minimum that the falling soil in a hole is reduced to, and generally can be limited in below the 200mm, reached the requirement of design specifications.
The utility model can guarantee a hole depth when utilizing the stake pipe to be carried out to hole operation, improve construction speed, has reduced a large amount of falling soil that form behind tube drawing, has avoided follow-up repeatedly repetition soil digging operation.The pile tube that the utility model is suitable for various diameters becomes hole operation.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, body 3 is the cylindrical steel tubular structure, is sealed with cover plate 2 in the upper port of body 3, and the lower end of body 3 is the tapered pile tip 4 of 60 ° of angles.Stake tip 4 is flexible connection with body 3, so that in time remove the hack that enters in the pipe behind tube drawing.Stake tip 4 realizes flexibly connecting by blocking mechanism with body 3, and blocking mechanism can be various known connected modes such as hook structure or key structure.
Have 2-4 steam vents 5 in stake tip 4, steam vent 5 is uniformly distributed along the circumference on the stake tip.Epimere at body 3 has air inlet 6.Air inlet can be square hole or circular hole, and the diameter of circular hole gets final product about 100mm.
During use, the stake pipe is perpendicular to ground, and pile monkey 1 back and forth falls from the top, impacts on cover plate 2, and the stake pipe is constantly sunk and pore-forming; After putting in place, pinion cover plate 1 with wire rope, on carry a pipe and portal, finish into hole operation; Then, open blocking mechanism, after disposing the hack in the body 1 and resetting, promptly be transferred to next position, hole, proceed into hole operation.

Claims (2)

1. one kind high moisture soil property pore-forming stake pipe, upper port at body (3) is sealed with cover plate (2), the lower end of body (3) is the stake tip (4) of taper, it is characterized in that, described stake tip (4) is connected by blocking mechanism with described body (3), have plurality of rows pore (5) in described stake tip (4), have air inlet (6) at the epimere of described body (3).
2. the moisture soil property pore-forming of height according to claim 1 stake pipe is characterized in that described steam vent (5) has 2-4, is uniformly distributed along the circumference in described stake tip (4).
CN2011201552909U 2011-05-16 2011-05-16 High-water-content soil texture pore-forming pile pipe Expired - Fee Related CN202064351U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201552909U CN202064351U (en) 2011-05-16 2011-05-16 High-water-content soil texture pore-forming pile pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201552909U CN202064351U (en) 2011-05-16 2011-05-16 High-water-content soil texture pore-forming pile pipe

Publications (1)

Publication Number Publication Date
CN202064351U true CN202064351U (en) 2011-12-07

Family

ID=45058217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201552909U Expired - Fee Related CN202064351U (en) 2011-05-16 2011-05-16 High-water-content soil texture pore-forming pile pipe

Country Status (1)

Country Link
CN (1) CN202064351U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386444A (en) * 2015-11-23 2016-03-09 江创葵 Foundation pile hole forming device and method
CN107366284A (en) * 2017-07-13 2017-11-21 中冶集团武汉勘察研究院有限公司 Reduce the collapsible loess compacting pile construction device and construction method for falling soil thickness after rise

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386444A (en) * 2015-11-23 2016-03-09 江创葵 Foundation pile hole forming device and method
CN107366284A (en) * 2017-07-13 2017-11-21 中冶集团武汉勘察研究院有限公司 Reduce the collapsible loess compacting pile construction device and construction method for falling soil thickness after rise
CN107366284B (en) * 2017-07-13 2022-11-08 中冶集团武汉勘察研究院有限公司 Collapsible loess compaction pile construction device and construction method for reducing thickness of falling soil

Similar Documents

Publication Publication Date Title
CN100497843C (en) Construction method of full sleeve large diameter vibration soil taking and filling pile
CN103114577A (en) Rotary excavating hole-forming construction method for building pile foundation
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN102108706A (en) Simple manual spiral earth fetching device for reinforcing pile core of pre-stressed pipe pile
CN201148614Y (en) Gas assist vibration punching stone column construction equipment
CN202194149U (en) Water-proof curtain
CN110424896A (en) A kind of hole stake drilling construction method and device suitable for high backfill Karst Geological Landscape
CN204418184U (en) High-pressure rotary jet grouting pile double-jacket tube drilling construction device
CN202064351U (en) High-water-content soil texture pore-forming pile pipe
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN204326094U (en) The polygon steel pile foundation of transmission of electricity steel pipe pole
CN202064350U (en) Collapsible soil hole-forming pile tube
CN101672160A (en) Quick well formation device in soft soil layer
CN204174610U (en) Compartment multi-shaft cement mixing pile machine
WO2017133373A1 (en) Small-diameter pile cluster used for pile foundation, and method for construction thereof
CN102677657A (en) Construction method of row cast thin-walled concrete compound pile wall and special hole forming device thereof
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN205242382U (en) Recoverable local fender pile
CN203498848U (en) Light-weight well point downcast pipe hole forming device
CN201873991U (en) Device for forming cast-in-place pile through high frequency vibrating and compacting dry soil displacement
CN202031081U (en) Pipe sinking cast-in-place pile with soil discharge pipes
CN109137888A (en) The dewatering construction method of prefabricated concrete pipe pile supporting construction
CN203755332U (en) Device for treating collapsible loess with lime-soil compaction piles and CFG rigid piles combined
CN106351211A (en) Concrete large cylinder structure and construction method of flushing sink thereof
CN110130836B (en) Double-tube spiral drill bit for cast-in-situ cement soil composite foundation and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111207

Termination date: 20150516

EXPY Termination of patent right or utility model