CN106351211A - Concrete large cylinder structure and construction method of flushing sink thereof - Google Patents

Concrete large cylinder structure and construction method of flushing sink thereof Download PDF

Info

Publication number
CN106351211A
CN106351211A CN201610926147.2A CN201610926147A CN106351211A CN 106351211 A CN106351211 A CN 106351211A CN 201610926147 A CN201610926147 A CN 201610926147A CN 106351211 A CN106351211 A CN 106351211A
Authority
CN
China
Prior art keywords
concrete
cylinder
pressure
cylinder structure
injection line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610926147.2A
Other languages
Chinese (zh)
Inventor
何福渤
陈强
丁文智
张佩良
董明达
李德刚
李格平
路明月
易振
李文
费文源
赵雨来
杨立红
张津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Port & Channel Engineering Co Ltd
Original Assignee
Tianjin Port & Channel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Port & Channel Engineering Co Ltd filed Critical Tianjin Port & Channel Engineering Co Ltd
Priority to CN201610926147.2A priority Critical patent/CN106351211A/en
Publication of CN106351211A publication Critical patent/CN106351211A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/32Prefabricated piles with arrangements for setting or assisting in setting in position by fluid jets

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The invention relates to a concrete large cylinder structure. The concrete large cylinder structure comprises a concrete large cylinder structure body and is characterized in that a plurality of high-pressure flushing jet pipelines are uniformly distributed in the circumferential cylinder wall of the concrete large cylinder structure body, and the high-pressure flushing jet pipelines are connected with an external high-pressure flushing device. A method of flushing sink comprises the steps of prefabricating the concrete large cylinder structure; hoisting the concrete large cylinder structure to a sink position; externally connecting the high-pressure flushing device, thus jetting high-pressure water flow from jet holes communicated with the high-pressure flushing jet pipelines to cut soil below the concrete large cylinder structure until the concrete large cylinder structure sinks to the target height; and filling the high-pressure flushing jet pipelines with cement paste. The concrete large cylinder structure adopts the flushing sink, thereby avoiding damage to the cylinder structure when a vibratory hammer sinks; and only flushing equipment is needed during construction, and large construction ships are not needed, so that the construction period can be greatly shortened and the construction cost can be reduced.

Description

Concrete Between Cylinder and its construction method of bath sinking
Technical field
The invention belongs to water conservancy project gravity-type structure, what more particularly, to a kind of concrete Between Cylinder and its bath were sunk applies Work method.
Background technology
Traditional water conservancy project gravity-type structure, pile foundation, often due to lacking suitable supporting course, generally require and change on a large scale Banket or increase the buried depth of pile foundation, lead to construction costs expensive.Concrete Between Cylinder is to grow up in recent years and pole A kind of new hydro-structure pattern of tool application prospect.It, similar to bottomless, no partition wall cylinder caisson structure, is suitable for soft The complex conditions such as soil base and severe sea condition, have that structure is simple, stress condition is good, the construction period is short, low cost, good endurance The advantages of, can be used for the hydraulic structures such as preventing the bank from flood, trraning pole, harbour and ocean platform.
Concrete Between Cylinder sinking construction is typically sunk using vibration or hammering, but vibration and hammering sink to easily making to mix Solidifying soil large cylinder barrel cracking, thus affect the durability of structure.When sinking stratum is harder, vibration and hammering sinking are difficult, Exist and be difficult to concrete Between Cylinder sinking to the problem of target absolute altitude, structural stability is constituted a threat to.
Patent documentation 2115364 discloses a kind of concrete large cylinder stake, and cylinder bottom is lance tooth side, and tooth side end face is three Angular groove, circumferentially has axial discharge pipeline, feed pipe and air supply pipe in barrel, has one than tooth side top slightly below cylinder High annular boss, preset one annular gas pipe communicating with air supply pipe in it, can upwards jet and make on cylinder surrounding form gas Barrier film is to reduce sinking side-friction force.During sinking, feed pipe is sprayed water so as to interior soil is constantly rushed to tooth side triangular open space Rise and discharge upwardly through discharge pipeline along triangular groove, lead to cylinder constantly to sink to designated depth.The defect of this patent is big Cylinder pile water jet quantity is few, aperture is relatively large, and water flow pressure is limited, limited to soil layer cutting power;And lance tooth side Precasting process is complicated, prefabricated after the completion of, large cylinder can not be touched with ground.
Patent documentation 1963042 discloses a kind of hydraulic sheeting and its using method, including reinforced concrete peg board and its interior hang down The water pipe excessively directly installed, the water operation pipe being connected with mistake water pipe that bottom is laterally installed, the slideway that side is installed, opposite side The slide plate installed, the lifting suspension ring that top is installed and embedded reserved steel bar, also include in described reinforced concrete peg board, slideway, cunning The vertical water proof road of the both sides setting of plate.The defect of this patent is that reinforced concrete sheet pile structure dimension is limited, and how length is in 2m Within, more than width within 0.5m, restricted application.
Urgently develop one kind in the construction of the hydraulic structures such as preventing the bank from flood, trraning pole, harbour and ocean platform to have Structure is simple, stress condition is good, the construction period is short, the concrete Between Cylinder of low cost, good endurance.
Content of the invention
It is an object of the invention to overcoming the shortcomings of above-mentioned technology, and provide a kind of concrete Between Cylinder and its bath The construction method sunk, only need to use flushing device during construction, without using Large Construction ship, can be greatly saved construction week Phase.
The present invention for achieving the above object, employs the following technical solutions: a kind of concrete Between Cylinder, including concrete Between Cylinder body, is characterized in that: is evenly equipped with some high pressure in the circumference barrel of described concrete Between Cylinder body Bath injection line, described high-pressure flush injection line is connected with external high-pressure water-flushing device.
Described concrete Between Cylinder body bottom portion is connected with annular steel base, and described annular steel base is provided with Spray-hole that is corresponding with high-pressure flush injection line and connecting.
Described high-pressure flush injection line is made using thin-wall steel tube.
Described concrete Between Cylinder body cross-section shape is rounded or polygon.
The construction method that a kind of concrete Between Cylinder bath is sunk, concrete technology step is as follows:
(1) land precast concrete Between Cylinder body, is burying high-pressure flush playpipe near barrel inner side Road, is prefabricated into concrete Between Cylinder;
(2) pass through square refuting and concrete Between Cylinder is transported to job site, crane gear lifting concrete large cylinder knot Structure is to subsidence position, and slow sinking is to mud face, and under Gravitative Loads, concrete Between Cylinder sinks stable;
(3) the high-pressure flush injection line of concrete Between Cylinder body is connected with external high-pressure water-flushing device, opens Dynamic high-pressure water-flushing device, makes High-Pressure Water spray cutting concrete large cylinder from the spray-hole that high-pressure flush injection line connects The soil body below structure;
(4) High-Pressure Water pressure size is regulated and controled according to soil property situation, adjust concrete Between Cylinder fall rate, until Sinking is to target absolute altitude;
(5) remove high-pressure water-flushing device, cement grouting in high-pressure flush injection line, by high-pressure flush injection line bag It is rolled in concrete, the bath completing concrete Between Cylinder is sunk.
Beneficial effect: compared with prior art, the concrete large cylinder of the present invention is sunk using bath, it is to avoid vibration hammer Damage when sinking to, cylindrical structure being caused, only need to use flushing device during construction, without using Large Construction ship, can be very big Save construction period, reduce operating expenses.Concrete Between Cylinder has that structure is simple, stress condition is good, the construction period is short, The advantages of low cost, good endurance, can be widely used for the hydraulic structures such as preventing the bank from flood, trraning pole, harbour and ocean platform.
Brief description
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the elevation of Fig. 1;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is square box cylinder top view.
In figure: 1- concrete large cylinder body, 2- high-pressure flush injection line, 3- annular steel base, 4- spray-hole.
Specific embodiment
Describe the specific embodiment of the present invention with reference to preferred embodiment in detail.
Refer to accompanying drawing, a kind of concrete Between Cylinder, including concrete Between Cylinder body, described concrete great circle Be evenly equipped with some high-pressure flush injection line in the circumference barrel of barrel structure body, described high-pressure flush injection line with external High-pressure water-flushing device connect.Described concrete Between Cylinder body bottom portion is connected with annular steel base 3, described annular steel Matter base is provided with spray-hole 4 that is corresponding with high-pressure flush injection line and connecting.Described high-pressure flush injection line adopts thin Wall steel pipe is made.
The diameter 10-30m of concrete Between Cylinder body, height 10-30m, wall thickness of cylinder 0.5-2m, high-pressure flush is sprayed Penetrating pipeline caliber is 20-100mm, and nozzle inside diameter is identical with high-pressure flush injection line caliber.
The construction method that a kind of concrete Between Cylinder bath is sunk, concrete technology step is as follows:
(1) land precast concrete Between Cylinder body, after the completion of concrete Between Cylinder body steel reinforcement cage colligation, Arranging some high-pressure flush injection line near steel reinforcement cage inner side, it is big that subsequent formwork casting concrete forms concrete Cylindrical structure.
Bury high-pressure flush injection line near barrel inner side, be prefabricated into concrete Between Cylinder;
(2) pass through square refuting and concrete Between Cylinder is transported to job site, crane gear lifting concrete large cylinder knot Structure is to subsidence position, and slow sinking is to mud face, and under Gravitative Loads, concrete Between Cylinder sinks stable;
(3) the high-pressure flush injection line of concrete Between Cylinder body is connected with external high-pressure water-flushing device, opens Dynamic high-pressure water-flushing device, makes High-Pressure Water spray cutting concrete large cylinder from the spray-hole that high-pressure flush injection line connects The soil body below structure;
(4) High-Pressure Water pressure size is regulated and controled according to soil property situation and select adaptable high-pressure water-flushing device, adjustment is mixed Solidifying soil Between Cylinder fall rate, until sinking is to target absolute altitude;
(5) remove high-pressure water-flushing device, cement grouting in high-pressure flush injection line, by high-pressure flush injection line bag It is rolled in concrete, the bath completing concrete Between Cylinder is sunk.
It is detailed that the above-mentioned construction method a kind of this concrete Between Cylinder and its bath sunk with reference to embodiment is carried out Thin description, is illustrative rather than determinate, can include several embodiments according to limited scope, therefore do not taking off Changing and modifications under present general inventive concept, should belong within protection scope of the present invention.

Claims (5)

1. a kind of concrete Between Cylinder, including concrete Between Cylinder body, is characterized in that: described concrete large cylinder Be evenly equipped with some high-pressure flush injection line in the circumference barrel of structural body, described high-pressure flush injection line with external High-pressure water-flushing device connects.
2. concrete Between Cylinder according to claim 1, it is characterized in that: described concrete Between Cylinder body Bottom is connected with annular steel base, and described annular steel base is provided with spray that is corresponding with high-pressure flush injection line and connecting Perforation.
3. concrete Between Cylinder according to claim 1, is characterized in that: described high-pressure flush injection line adopts thin Wall steel pipe is made.
4. concrete Between Cylinder according to claim 1, is characterized in that: described concrete Between Cylinder body is horizontal Cross sectional shape is rounded or polygon.
5. the construction method that the concrete Between Cylinder bath described in a kind of claim 1 is sunk, concrete technology step is as follows:
(1) land precast concrete Between Cylinder body, is burying high-pressure flush injection line near barrel inner side, in advance Make concrete Between Cylinder;
(2) pass through square refuting and concrete Between Cylinder is transported to job site, crane gear lifting concrete Between Cylinder is extremely Subsidence position, and slow sinking is to mud face, under Gravitative Loads, concrete Between Cylinder sinks stable;
(3) the high-pressure flush injection line of concrete Between Cylinder body is connected with external high-pressure water-flushing device, starts high Pressure flushometer, makes High-Pressure Water spray cutting concrete Between Cylinder from the spray-hole that high-pressure flush injection line connects The lower section soil body;
(4) High-Pressure Water pressure size is regulated and controled according to soil property situation, adjust concrete Between Cylinder fall rate, until sinking To target absolute altitude;
(5) remove high-pressure water-flushing device, cement grouting in high-pressure flush injection line, high-pressure flush injection line is wrapped in In concrete, the bath completing concrete Between Cylinder is sunk.
CN201610926147.2A 2016-10-31 2016-10-31 Concrete large cylinder structure and construction method of flushing sink thereof Pending CN106351211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610926147.2A CN106351211A (en) 2016-10-31 2016-10-31 Concrete large cylinder structure and construction method of flushing sink thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610926147.2A CN106351211A (en) 2016-10-31 2016-10-31 Concrete large cylinder structure and construction method of flushing sink thereof

Publications (1)

Publication Number Publication Date
CN106351211A true CN106351211A (en) 2017-01-25

Family

ID=57863715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610926147.2A Pending CN106351211A (en) 2016-10-31 2016-10-31 Concrete large cylinder structure and construction method of flushing sink thereof

Country Status (1)

Country Link
CN (1) CN106351211A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104148A (en) * 2017-12-12 2018-06-01 河海大学 A kind of thin-walled steel suction bucket basis with reinforced pipe and its installation method
CN114922131A (en) * 2022-05-19 2022-08-19 天津大学 Settlement installation method for large-size steel cylinder dyke dam retaining wall structure in ocean water body

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190909612A (en) * 1909-04-22 1909-11-18 Avenel William Cragg Addis Improvements in the Method of and Apparatus for Sinking Wells.
JPH10159478A (en) * 1996-12-03 1998-06-16 Nippon Kokan Light Steel Kk Settling body with outer shell having holes
JP2003321843A (en) * 2002-04-30 2003-11-14 Yamaha Kako Kensetsu Kk Immersion structure and immersion method
CN104060623A (en) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 Open caisson structure provided with resistance reduction mechanism and dry excavation method of open caisson
CN105386452A (en) * 2015-10-16 2016-03-09 上海市基础工程集团有限公司 Construction method for assisting in sinking of open caisson through high-pressure water
CN206486890U (en) * 2016-10-31 2017-09-12 天津港航工程有限公司 Concrete cylindrical structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB190909612A (en) * 1909-04-22 1909-11-18 Avenel William Cragg Addis Improvements in the Method of and Apparatus for Sinking Wells.
JPH10159478A (en) * 1996-12-03 1998-06-16 Nippon Kokan Light Steel Kk Settling body with outer shell having holes
JP2003321843A (en) * 2002-04-30 2003-11-14 Yamaha Kako Kensetsu Kk Immersion structure and immersion method
CN104060623A (en) * 2013-03-20 2014-09-24 中国二十冶集团有限公司 Open caisson structure provided with resistance reduction mechanism and dry excavation method of open caisson
CN105386452A (en) * 2015-10-16 2016-03-09 上海市基础工程集团有限公司 Construction method for assisting in sinking of open caisson through high-pressure water
CN206486890U (en) * 2016-10-31 2017-09-12 天津港航工程有限公司 Concrete cylindrical structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨联正等: "对大直径圆筒下沉施工工艺的探讨", 《港工技术》 *
连卫东等: "高压空气法大圆筒下沉技术研究", 《山东交通科技》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104148A (en) * 2017-12-12 2018-06-01 河海大学 A kind of thin-walled steel suction bucket basis with reinforced pipe and its installation method
CN114922131A (en) * 2022-05-19 2022-08-19 天津大学 Settlement installation method for large-size steel cylinder dyke dam retaining wall structure in ocean water body
CN114922131B (en) * 2022-05-19 2024-09-24 天津大学 Sedimentation installation method for large-size steel cylinder dike protection wall structure in ocean water

Similar Documents

Publication Publication Date Title
CN102322058B (en) Construction process and equipment for downhole impacting high-pressure jet grouting pile
EP2837554A1 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
CN101691751B (en) Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN102720186B (en) Underwater once pouring method for variable cross-section bored cast-in-place pile
EP3118374A1 (en) Hollow cylindrical pier for fixing offshore platform structure to bed and method of installing and constructing same
CN111395374A (en) Construction method of open caisson
CN100510281C (en) Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank
CN100532733C (en) Diving casting cast-in-place pile construction method for constructing in scree layer and sand layer
CN102561371A (en) Steel caisson enclosure structure at island-tunnel combination part
CN201962696U (en) Underwater cup-shaped foundation with functions of hydraulic scouring assisted sinking and foundation consolidation
CN111395375A (en) Open caisson construction method based on thixotropic slurry drag reduction
CN104975612B (en) Open caisson construction new technology waterborne
CN106351211A (en) Concrete large cylinder structure and construction method of flushing sink thereof
CN104762942B (en) Fixed platform soft soil foundation seabed, aquatic building ocean fixed installation construction method
CN206486890U (en) Concrete cylindrical structure
CN210562253U (en) Conical cylinder type offshore wind generating set foundation structure
CN102677657A (en) Construction method of row cast thin-walled concrete compound pile wall and special hole forming device thereof
CN204282390U (en) For the steel concrete-steel structure mixing gravity type foundation of offshore wind farm
CN111395373A (en) Open caisson pressure-sinking method construction method
CN110144924A (en) A kind of taper barrel marine wind turbine generator system base structure and its construction method
JP2006194031A (en) Pillar construction method
CN216515710U (en) Offshore wind turbine foundation structure suitable for shallow overburden rock-based seabed area
CN101818495A (en) Construction method for retaining and protecting foundation excavation and supporting structure thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170125