CN202062706U - Carton handle installing equipment - Google Patents

Carton handle installing equipment Download PDF

Info

Publication number
CN202062706U
CN202062706U CN2011200597847U CN201120059784U CN202062706U CN 202062706 U CN202062706 U CN 202062706U CN 2011200597847 U CN2011200597847 U CN 2011200597847U CN 201120059784 U CN201120059784 U CN 201120059784U CN 202062706 U CN202062706 U CN 202062706U
Authority
CN
China
Prior art keywords
band
handle
reinforcing
carton
reinforcing band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200597847U
Other languages
Chinese (zh)
Inventor
裴志忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BAODING HANDE NEW MATERIAL TECHNOLOGY Co Ltd
Original Assignee
BAODING HANDE NEW MATERIAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAODING HANDE NEW MATERIAL TECHNOLOGY Co Ltd filed Critical BAODING HANDE NEW MATERIAL TECHNOLOGY Co Ltd
Priority to CN2011200597847U priority Critical patent/CN202062706U/en
Application granted granted Critical
Publication of CN202062706U publication Critical patent/CN202062706U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Making Paper Articles (AREA)

Abstract

The utility model relates to carton handle installing equipment which comprises a rack part, a carton conveying part, a reinforcing tape installing part, a handle tape installing part and a control part. In the rack part, a frame mechanism is composed of two side boards in connection with a cross beam; a pressing plate mechanism is segmented and arranged above the rack; an elastic pressing plate of the pressing plate mechanism presses the moving carton; the carton conveying part is composed of a paper feeding mechanism, a rapid jointing mechanism and a conveying mechanism; the reinforcing tape installing part comprises a reinforcing tape conveying mechanism, a reinforcing tape cutting mechanism, a reinforcing tape heat sealing mechanism and a punching mechanism; and the handle tape installing part comprises a handle tape conveying mechanism, a handle tape cutting mechanism, a handle tape clamping mechanism, a handle tape penetrating mechanism, a handle tape allocating mechanism and a handle tape heat sealing mechanism. Compared with the prior art, the carton handle installing equipment has the characteristics that the carton handle can be rapidly and safely installed, and the traditional manual operation is replaced by mechanical automatic operation, thereby achieving the purpose of saving labor and material, improving the efficiency and reducing the cost.

Description

A kind of equipment that carton eye ring is installed
Technical field
The utility model relates to a kind of package packing machine, is specifically related to carton eye ring is mounted to equipment on the casing automatically.
Background technology
The mode that carton eye ring is installed in the packaging industry at present is manual installation, causes efficient low and installation cost is high.Concrete mounting means is: at first punching on the carton proper site forms and wears handle aperture; The plastic tape handle that to make in advance then manually penetrates in the handle aperture, promptly forms handled carton.The main deficiency of prior art is, inefficiency, and recruitment is a lot; Wear handle by hand, also cause workman's finger injuries easily; Moreover hand contact carton also pollutes carton easily, can not satisfy the hygienic requirements to packaging for foodstuff.
The utility model content
The purpose of this utility model provides a kind of equipment of quick, safe installation carton eye ring, replaces traditional manual operations by mechanized operation, thereby reaches the saving human and material resources, raises the efficiency the purpose that reduces cost.
The purpose of this utility model is achieved in that a kind of equipment that carton eye ring is installed, and comprises rack section, carton translator unit, reinforcing band mounting portion, handle band mounting portion and control section, it is characterized in that:
Rack section connects crossbeam by biside plate and forms frame mechanism, and frame top segmentation is equipped with press plate mechanism, and the spring bearer plate of press plate mechanism is pushed down the carton in the motion;
The carton translator unit is by paper feed mechanism, fast rank is gone into mechanism and connecting gear is formed; Wherein the paper feed mechanism structure is: paper pushing motor connects clutch, and clutch connects paper feeding belt driving shaft by belt, and paper feeding belt driving shaft connects paper feeding belt driven axle by the paper feeding belt again; In paper feeding belt both sides left side baffle plate and right side baffle plate are installed, left front baffle plate and right front baffle plate are installed in the front of paper feeding belt; Fast rank is gone into the separation axis that mechanism is made up of two axles up and down that roller is installed and is constituted, and its driving shaft is connected introducing power by belt with paper feeding belt driving shaft; The connecting gear structure is: chain main transmission servomotor drives the chain driving shaft, connects the chain driven axle by chain again, and the carton block is installed on the chain;
The reinforcing band mounting portion comprises reinforcing band connecting gear, reinforcing band cutting mechanism, reinforcing band heat device and punch mechanism; Wherein reinforcing band connecting gear structure is: the reinforcing band spool is installed on the biside plate of frame, the reinforcing band servomotor connects reinforcing band by belt and send the band driving wheel, send the band follower by sending the belt leather band to connect reinforcing band again, send frid to be installed below the belt leather band, reinforcing band is entered to send by the reinforcing band spool and enters in the reinforcing band cutter between belt leather band and the frid again; The structure of reinforcing band cutting mechanism is: the reinforcing band cutting knife connects reinforcing band cutting knife cylinder, and the reinforcing band cutter is installed in below the reinforcing band cutting knife; The structure of reinforcing band heat device is: the reinforcing band heat block connects reinforcing band heat seal cylinder and forms; The punch mechanism structure is: below the punching cutter connection punching cylinder, punching cutter the punching bed die is installed; The each part mentioned above cylinder all is fixed on the reinforcing band portion machine wall, and slide block is equipped with in machine wall bottom in reinforcing band portion, and slide block is contained on the slide rail, and slide rail is fixed in frame;
Handle band mounting portion comprises that handle tape transport, handle band cutting mechanism, the tight mechanism of handle strap clamp, handle band Tape threading apparatus, handle band allocate mechanism and handle band heat device; Wherein handle tape transport structure is: the handle spool of tape is installed on the handle band portion machine wall, handle band servomotor connects the handle band and send the band driving wheel, send the band follower by sending the belt leather band to connect the handle band again, send the handle band to be installed below the belt leather band and to entrust frid, the handle band is entered by the handle spool of tape and send belt leather band and handle band to entrust to send between the frid in the handle band cutter again; Handle band cutting mechanism is made up of handle band cutting knife and cylinder thereof and handle band cutter; The tight mechanism of handle strap clamp connects clamping column by the tight cylinder of handle strap clamp and handle band backing plate is formed; Handle band Tape threading apparatus is worn band cylinder connection threading fork by the handle band and is formed; The handle band is allocated mechanism and is allocated cylinder by the handle band and connect to divide a shift fork to form; Handle band heat device connects handle band workpiece preheating block by handle band heat seal cylinder and handle band heat block is formed.The each part mentioned above cylinder all is fixed on the handle band portion machine wall, and slide block is equipped with in machine wall bottom in handle band portion, and slide block is contained on the slide rail, and slide rail is fixed in frame.
The purpose of this utility model can also realize like this: the paper feed mechanism of carton translator unit is equipped with air intake device, and air intake device is made up of induced-draught fan, air-suction trunk and airduct; Induced-draught fan is communicated with air-suction trunk and arrives paper feeding belt bottom by airduct, on the paper feeding belt air-permeating hole is arranged.
Dispose vacuum generator in reinforcing band heat device and the handle band heat device, vacuum generator is separately fixed on reinforcing band portion machine wall and the handle band portion machine wall, and vacuum generator is communicated with reinforcing band heat block and handle band workpiece preheating block and handle band heat block by pipeline respectively.
Compare with manual installation of prior art, the utlity model has following advantage and useful effect: 1, wore handle 2000 per capita/8 hours by hand, this equipment is: 12000/8 hours, raise the efficiency 6 times, and reduce installation cost 55%.At present demand carton eye ring installation is 12,000,000,000 China market year, as be artificial install then need artificial 18000 people, this kind equipment that carton eye ring is installed automatically then only need artificial 3000 people, labor savings 15000 people.Under the situation that the existing labour cost of China progressively improves, the degree that the automatic mode that carton eye ring is installed of this kind reduces cost also can strengthen.2, because of the long-term manual carton eye ring of installing, greatly even reach disabled degree to the finger injury; This kind wear automatically the carton eye ring mode solve to the finger the injury problem.3, the automatic mode that carton eye ring is installed of this kind contrasts the manual carton eye ring mode of installing, and has improved the carton sanitary condition greatly, satisfies having the packaging for foodstuff hygienic requirements now.4, the automatic mode that carton eye ring is installed of this kind contrasts the manual carton eye ring mode of installing, and saves installing space 90%, makes the internal flows of packing factory more rationally unobstructed.
Description of drawings
Fig. 1 the utility model complete machine front view
Fig. 2 is the vertical view of Fig. 1
Fig. 3 is the rearview of Fig. 1
Fig. 4 is the right view of Fig. 1
Fig. 5 is reinforcing band mounting portion partial front elevation view (a removal framework lateral plate)
Fig. 6 is the right view of Fig. 5
Fig. 7 is the vertical view of Fig. 5
Fig. 8 is the left view of Fig. 5
Fig. 9 is the rearview of Fig. 5
Figure 10 is a handle band mounting portion partial left side view
Figure 11 is a handle band mounting portion partial top view
Figure 12 is a carton eye ring part-structure schematic diagram (inner face)
Figure 13 is carton eye ring part-structure schematic diagram (an outside solid)
The specific embodiment
Parts label among the figure: paper pushing motor 1; Clutch 2; Paper feeding belt driving shaft 3; Induced-draught fan 4; Air-suction trunk 5; Paper feeding belt driven axle 6; Right front baffle plate 7; Right side baffle plate 8; Left front baffle plate 9; Left side baffle plate 10; Reinforcing band spool 11; Chain 12; Chain main transmission servomotor 13; Magnetic valve holder 14; Chain driving shaft 15; Chain driven axle 16; Reinforcing band servomotor 17; Handle band servomotor 18; Separation axis 19; Vacuum generator 20; Punching cylinder 21; Reinforcing band heat seal cylinder 22; Reinforcing band heat block 23; Punching bed die 24; Punching cutter 25; Reinforcing band cutting knife cylinder 26; Reinforcing band station optoelectronic switch 27; Reinforcing band send band follower 28; Reinforcing band send band driving wheel 29; Reinforcing band heat seal cylinder support 30; Reinforcing band cutting knife 31; The handle band is worn band cylinder 32; Handle band heat seal cylinder 33; Handle band workpiece preheating block 34; Handle band heat block 35; The tight cylinder 36 of handle strap clamp; The handle band send band driving wheel 37; The handle band send band follower 38; Handle band rotating tape guide 39; Handle band backing plate 40; The handle band is entrusted frid 41; Handle spool of tape 42; Handle band cutting knife 43; The handle band is allocated cylinder 44; Handle band station optoelectronic switch 45; Slide rail 46; Frame 47; Switch board 48; Press plate mechanism 49; Paper feeding belt 50; Reinforcing band portion machine wall 51; Handle band portion machine wall 52; Sliding thick stick 53; Leading screw 54; Handwheel 55; Carton 56; Reinforcing band 57; Handle band 58; Reinforcing band cutter 59; Slide block 60.
At first, prior art carton eye ring part-structure and this equipment carton eye ring part-structure are done an explanation.Prior art carton eye ring band keeps off head by two ends and is stuck in the handle aperture, is to strengthen handle aperture periphery intensity, and the carton that has is in hole Zhou Zengjia one circle plastic edge, and the handle band leans on manual through in the handle aperture.For adapting to automated machine handle is installed, the handle that the utility model is installed adopts surperficial pre-gelatinized high strength paper tape, for strengthening handle two ends and carton binding site intensity, respectively establish a reinforcing band in two handle aperture outsides of carton, reinforcing band also is pre-gelatinized high strength paper tape.Reinforcing band and handle band two ends all adopt the heat seal mode to bond on the carton inner surface under pressure.The carton of being finished by this equipment making that has the handle band is referring to Figure 12, Figure 13, and reinforcing band length is generally 50mm.The handle strip length is generally 220mm.Reinforcing band and handle band all are surperficial pre-gelatinized high strength paper tapes, are bonded in the carton inner surface by heating.
This equipment is a kind of automation punching of finishing the carton eye ring hole, with reinforcing band and the heat seal of the handle band machinery to the carton.Finish a handled carton, need through punching and reinforcing band fitting operation, handle band fitting operation, carton will regularly arrive the station of appointment according to processing step simultaneously.
Can be divided into rack section, carton translator unit, reinforcing band mounting portion, handle band mounting portion and control section on this device structure, below division as follows:
One, rack section
Rack section connects crossbeam by biside plate and forms frame mechanism, and frame 1 top segmentation is equipped with press plate mechanism 49, and the spring bearer plate of press plate mechanism 49 is pushed down the carton 56 in the motion.Rack section is from one end to the other side arranged successively carton translator unit, reinforcing band mounting portion, handle band mounting portion is installed.Referring to Fig. 1-Fig. 4, be this equipment complete machine structure schematic diagram.
Two, carton translator unit
The carton translator unit is by paper feed mechanism, fast rank is gone into mechanism and connecting gear is formed.Wherein:
The function of paper feed mechanism is to deposit charging and one by one carton is sent into quick rank according to the instruction of control system and gone into mechanism.The paper feed mechanism structure is: paper pushing motor 1 connects clutch 2, and clutch 2 connects paper feeding belt driving shaft 3 by belt, and paper feeding belt driving shaft 3 connects paper feeding belt driven axle 6 by paper feeding belt 50 again; In paper feeding belt 50 both sides left side baffle plate 10 and right side baffle plate 8 are installed, left front baffle plate 9 and right front baffle plate 7 are installed in the front of paper feeding belt 50; Carton 56 initially overlays on the paper feeding belt 50, makees the side retaining by the left side baffle plate 10 and the right side baffle plate 8 of both sides, and left side baffle plate 10 can slide on sliding thick stick 53 with right side baffle plate 8 and adjust the position to adapt to the width of different cartons, and adjusting has leading screw 54, handwheel 55 to finish.The effect of left front baffle plate 9 and right front baffle plate 7 is that control can only be advanced a piece of paper case 56 at every turn, slit control carton thickness between left front baffle plate 9 and right front baffle plate 7 and the following paper feeding belt 50, this slit can obtain suitable width by adjusting left front baffle plate 9 and right front baffle plate 7 upper-lower positions, makes and can only pass through a piece of paper case 56 at every turn.Carton 56 described herein is meant the carton after the expansion.
The effect of holding in the mouth mechanism fast is that a piece of paper case is pulled out fast and delivered on the chain 12.By pulling out a piece of paper case in the paper feed mechanism fast, make follow-up carton and last carton form a determining deviation, start far red light electric switch herein, for control system provides control signal.Fast rank is gone into the separation axis 19 that mechanism is made up of two axles up and down that a plurality of rollers are installed on it and is constituted, the driving shaft of its separation axis is connected with paper feeding belt driving shaft 3 by belt introduces power, because gearratio difference, the separation axis rotating speed is higher than paper feeding belt driving shaft 3 rotating speeds, make carton go into pace difference between mechanism's separation axis, thereby form discontinuous paper feed on the belt of paper feed mechanism and quick rank;
The connecting gear effect is according to the instruction of control system carton regularly to be delivered to specify station and finished product is sent production line.The connecting gear structure is: chain main transmission servomotor 13 drives chain driving shaft 15, connects chain driven axle 16 by chain 12 again, and the carton block is installed on the chain 12.Chain 12 can be provided with many according to the width of carton 56.
The paper feed mechanism of carton translator unit can be installed air intake device, so that it is docile and obedient on belt to press close to carton in bottom of paper feeding belt 50, air intake device is made up of induced-draught fan 4, air-suction trunk 5 and airduct; Induced-draught fan 4 is communicated with air-suction trunk 5 and arrives paper feeding belt 50 bottoms by airduct, on the paper feeding belt air-permeating hole is arranged.
Three, reinforcing band mounting portion
The effect of reinforcing band mounting portion is to finish the reinforcing band heat seal to carton at this station, punching on carton simultaneously.Need to finish following operation: reinforcing band is sent to assigned address for this reason, cutting, heat seal, punching simultaneously.The reinforcing band mounting portion comprises reinforcing band connecting gear, reinforcing band cutting mechanism, reinforcing band heat device and punch mechanism; Wherein:
Reinforcing band connecting gear structure is: reinforcing band spool 11 is installed on the biside plate of frame 47, and reinforcing band 57 is housed on the reinforcing band spool 11.Reinforcing band servomotor 17 connects reinforcing band by belt and send band driving wheel 29, send band follower 28 by sending the belt leather band to connect reinforcing band again, send and frid is installed below the belt leather band, reinforcing band 57 is entered to send by reinforcing band spool 11 and enters between belt leather band and the frid in the reinforcing band cutter 59 again, and reinforcing band 57 moves by sending the frictional force between belt leather band and the frid;
The structure of reinforcing band cutting mechanism is: reinforcing band cutting knife 31 connects reinforcing band cutting knife cylinder 26, and reinforcing band cutter 59 is installed in below the reinforcing band cutting knife 31; Reinforcing band outlet (referring to Fig. 8) is arranged in the middle of the reinforcing band cutter 59.
The structure of reinforcing band heat device is: reinforcing band heat block 23 connects reinforcing band heat seal cylinder 22 and forms;
The punch mechanism structure is: below the punching cutter 25 connection punching cylinders 21, punching cutter punching bed die 24 is installed;
The each part mentioned above cylinder all is fixed on the reinforcing band portion machine wall 51, and slide block 60 is equipped with in reinforcing band machine wall 51 bottoms, and slide block 60 is contained on the slide rail 46, and slide rail 46 is fixed in frame 47; Reinforcing band machine wall 51 can be adjusted the position to adapt to the carton different size.
Four, handle band mounting portion
The effect of handle band mounting portion is that two ends heat seal with the handle band is to carton.For this reason, need finish following operation: the transmission of handle band, the cut-out of handle band, the clamping of handle band, the handle band penetrates in the handle aperture, and handle band two ends are allocated and are come, and the two ends heat seal of at last branch being pushed aside is to carton.Handle band mounting portion comprises that handle tape transport, handle band cutting mechanism, the tight mechanism of handle strap clamp, handle band Tape threading apparatus, handle band allocate mechanism and handle band heat device; Wherein:
Handle tape transport structure is: handle spool of tape 42 is installed on the handle band portion machine wall 52, handle band servomotor 18 connects the handle band and send band driving wheel 37, send band follower 38 by sending the belt leather band to connect the handle band again, send the handle band to be installed below the belt leather band and to entrust frid 41, handle band 58 is entered by handle spool of tape 42 and send belt leather band and handle band to entrust to send between the frid 41 in the handle band cutter again; Moving of handle band 58 by sending belt leather band and handle band to entrust frictional force transmission between the frid 41, handle band cutter is the same with the reinforcing band cutter, and the centre has handle to take mouthful (referring to referring to Fig. 8) out of.
Handle band cutting mechanism is made up of handle band cutting knife 43 and cylinder thereof and handle band cutter;
The tight mechanism of handle strap clamp connects clamping column by the tight cylinder 36 of handle strap clamp and handle band backing plate 40 is formed; Handle band backing plate 40 is provided with in order to form the space of holding between handle and the carton, and the tight cylinder 36 drive clamping columns of handle strap clamp prop up handle band 58 and are pressed on the handle band backing plate 40, and next step is worn to be with and gets ready for Tape threading apparatus.
Handle band Tape threading apparatus is worn band cylinder 32 connection threading forks by the handle band and is formed; After the tight mechanism of handle strap clamp finished the clamping of handle band middle part, the handle band was worn two threading forks of band cylinder 32 drives handle band two ends is penetrated in the handle aperture of carton, withdraws from then.
The handle band is allocated mechanism and is allocated cylinder 44 by the handle band and connect and divide shift forks to form; Penetrate the handle band two ends of carton inner face, allocate cylinder 44 drives by the handle band and divide shift fork will separately be affixed to the carton surface.
Handle band heat device connects handle band workpiece preheating block 34 by handle band heat seal cylinder 33 and handle band heat block 35 is formed; Handle band heat seal cylinder 33 drives handle band heat blocks 35 and presses to handle band two ends, with its heat seal (below have in the heat seal of last operation reinforcing band part) outside the carton eye ring hole, before heat seal by 34 preheatings of handle band workpiece preheating block.
The each part mentioned above cylinder all is fixed on the handle band portion machine wall 52, and slide block 60 is equipped with in machine wall 52 bottoms in handle band portion, and slide block 60 is contained on the slide rail 46, and slide rail 46 is fixed in frame 47.The machine wall 52 removable adjustment of handle band portion are to adapt to different big or small cartons.
Five, control section
This equipment adopts computer software programs control.Signals collecting monitors cartons position by the optoelectronic switch that is installed on each station, sends signal to main control system, according to program each several part motor of setting and magnetic valve action, drives the work of each cylinder or each mechanism after treatment.
Course of work summary:
Carton transmits: paper feeding mode preferably descends the paper feeding of suction nozzle formula, power-on, induced-draught fan (air compressor machine) starts, suction nozzle just in time contacts with beneath cardboard by moving on to the top on the pneumatics gas, this moment, pneumatics gas changed into air-breathing, the low side cardboard is held, and paper pushing motor 1 starts, and carton 56 is moved on to left front baffle plate 9 and right front baffle plate 7 positions.Bottom carton enters quick rank by the slit and goes into up and down between two separation axis 19 of mechanism, by the separation axis 19 of quick rotation fast rank go into and move on the chain 12, at this moment because optoelectronic switch has not detected carton, control system stops the transmission of follow-up carton, finishes the transmission of a carton.
Reinforcing band is installed: reinforcing band mounting portion front end has a reinforcing band station optoelectronic switch 27, when cardboard runs to when blocking reinforcing band station optoelectronic switch 27, control system starts reinforcing band servomotor 17, and reinforcing band 57 enters to send by reinforcing band spool 11 and enters (starting first needs by hand reinforcing band to be introduced) in the reinforcing band cutter 59 between belt leather band and the frid again.Reinforcing band servomotor 17 drives reinforcing band and send band driving wheel 29 measured lengths to carry reinforcing band 57 to reinforcing band cutter 59 positions, 31 actions of reinforcing band cutting knife are with reinforcing band 57 customized cut-offs, reinforcing band heat seal cylinder 22 action is pressed to reinforcing band 57 with reinforcing band heat block 23, with the reinforcing band heat seal in both sides, carton eye ring hole (the reinforcing band bond locations is about 1 millimeter place in the handle aperture both sides just in time).In the time of with reinforcing band 57 heat seals, start the punch mechanism punching.Punching and reinforcing band heat seal are finished simultaneously.
For reinforcing band 57 and reinforcing band heat seal piece 23 are fitted, on reinforcing band heat seal piece, have aperture, be communicated with vacuum generator 20, open vacuum generator 20 in the heat seal operation, reinforcing band is inhaled on reinforcing band heat seal piece 23, prevent the reinforcing band position deviation.Heat seal is finished, and the vacuum air draught stops, and reinforcing band heat seal cylinder 22 resets, and the reinforcing band installation action is finished, and sends signal by control system, and chain 12 moves, and carton is sent into handle band mounting portion.
The handle band is installed: handle band mounting portion front end has a handle band station optoelectronic switch 45, when cardboard runs to when blocking, start handle band servomotor 18, the handle band send band driving wheel 37 to rotate to drive handle band followers 38 and rotates, and handle band 58 is entered by handle spool of tape 42 and send belt leather band and handle band to entrust to send between the frid 41 in the handle band cutter again; Moving of handle band 58 by sending belt leather band and handle band to entrust frictional force transmission between the frid 41, handle band cutter is the same with the reinforcing band cutter, and the centre has handle to take mouthful (referring to referring to Fig. 8) out of.When handle band 58 reached the length of setting, the handle band was cut off in 43 actions of handle band cutting knife.The tight cylinder 36 of handle strap clamp drives on the clamping column and moves, and will hold out against on handle band backing plate 40 in the middle of the handle band 58.The handle band is worn on two threading forks of band cylinder 32 drives and is moved immediately, and handle band 58 two ends are pierced in the handle aperture.The handle band is allocated cylinder 44 drive shift forks and rapidly the two ends of handle band 58 separately is attached to carton 56 surfaces then.Handle band heat block 35 is pressed to handle band two ends under handle band heat seal cylinder 33 drives, with its heat seal carton 56 and before heat seal on the reinforcing band on the carton 57, before the handle band is being allocated heat seal, press close to handle band workpiece preheating block 34 and do the moment preheating.Heat seal is finished, and handle band heat seal cylinder 33 drives handle band heat block 35 and resets, and chain 12 begins to be fed forward a carton distance, and handle band installation action is finished.After finishing above action, mounted finished product is sent by the transmission of chain 12.Go out the carton position one counter is installed, record finished product carton quantity.

Claims (3)

1. the equipment that carton eye ring is installed comprises rack section, carton translator unit, reinforcing band mounting portion, handle band mounting portion and control section, it is characterized in that:
Rack section connects crossbeam by biside plate and forms frame mechanism, and frame (1) top segmentation is equipped with press plate mechanism (49), and the spring bearer plate of press plate mechanism (49) is pushed down the carton (56) in the motion;
The carton translator unit is by paper feed mechanism, fast rank is gone into mechanism and connecting gear is formed; Wherein the paper feed mechanism structure is: paper pushing motor (1) connects clutch (2), and clutch (2) connects paper feeding belt driving shaft (3) by belt, and paper feeding belt driving shaft (3) connects paper feeding belt driven axle (6) by paper feeding belt (50) again; In paper feeding belt (50) both sides left side baffle plate (10) and right side baffle plate (8) are installed, left front baffle plate (9) and right front baffle plate (7) are installed in the front of paper feeding belt (50); Rank is gone into mechanism by two separation axis (19) formations that axle is formed up and down that roller is installed fast, and its driving shaft is connected with paper feeding belt driving shaft (3) by belt introduces power; The connecting gear structure is: chain main transmission servomotor (13) drives chain driving shaft (15), connects chain driven axle (16) by chain (12) again, and chain is equipped with the carton block on (12);
The reinforcing band mounting portion comprises reinforcing band connecting gear, reinforcing band cutting mechanism, reinforcing band heat device and punch mechanism; Wherein reinforcing band connecting gear structure is: reinforcing band spool (11) is installed on the biside plate of frame (47), reinforcing band servomotor (17) connects reinforcing band by belt and send band driving wheel (29), send band follower (28) by sending the belt leather band to connect reinforcing band again, send frid to be installed below the belt leather band, reinforcing band (57) is entered to send by reinforcing band spool (11) and enters between belt leather band and the frid in the reinforcing band cutter (59) again; The structure of reinforcing band cutting mechanism is: reinforcing band cutting knife (31) connects reinforcing band cutting knife cylinder (26), and reinforcing band cutter (59) is installed in below the reinforcing band cutting knife (31); The structure of reinforcing band heat device is: reinforcing band heat block (23) connects reinforcing band heat seal cylinder (22) and forms; The punch mechanism structure is: below punching cutter (25) the connection punching cylinder (21), punching cutter punching bed die (24) is installed; The each part mentioned above cylinder all is fixed on the reinforcing band portion machine wall (51), and slide block (60) is equipped with in reinforcing band portion machine wall (51) bottom, and slide block (60) is contained on the slide rail (46), and slide rail (46) is fixed in frame (47);
Handle band mounting portion comprises that handle tape transport, handle band cutting mechanism, the tight mechanism of handle strap clamp, handle band Tape threading apparatus, handle band allocate mechanism and handle band heat device; Wherein handle tape transport structure is: handle spool of tape (42) is installed on the handle band portion machine wall (52), handle band servomotor (18) connects the handle band and send band driving wheel (37), send band follower (38) by sending the belt leather band to connect the handle band again, send the handle band to be installed below the belt leather band and to entrust frid (41), handle band (58) is entered by handle spool of tape (42) and send belt leather band and handle band to entrust to send in the handle band cutter between the frid (41) again; Handle band cutting mechanism is made up of handle band cutting knife (43) and cylinder thereof and handle band cutter; The tight mechanism of handle strap clamp connects clamping column by the tight cylinder of handle strap clamp (36) and handle band backing plate (40) is formed; Handle band Tape threading apparatus is worn band cylinder (32) connection threading fork by the handle band and is formed; The handle band is allocated mechanism and is allocated cylinder (44) by the handle band and connect to divide a shift fork to form; Handle band heat device connects handle band workpiece preheating block (34) by handle band heat seal cylinder (33) and handle band heat block (35) is formed; The each part mentioned above cylinder all is fixed on the handle band portion machine wall (52), and slide block (60) is equipped with in handle band portion machine wall (52) bottom, and slide block (60) is contained on the slide rail (46), and slide rail (46) is fixed in frame (47).
2. the equipment of installation carton eye ring according to claim 1 is characterized in that: the paper feed mechanism of carton translator unit is equipped with air intake device, and air intake device is made up of induced-draught fan (4), air-suction trunk (5) and airduct; Induced-draught fan (4) is communicated with air-suction trunk (5) and arrives paper feeding belt (50) bottom by airduct, on the paper feeding belt air-permeating hole is arranged.
3. the equipment of installation carton eye ring according to claim 1 and 2, it is characterized in that: dispose vacuum generator (20) in reinforcing band heat device and the handle band heat device, vacuum generator (20) is separately fixed on reinforcing band portion machine wall (51) and the handle band portion machine wall (52), and vacuum generator (20) is communicated with reinforcing band heat block (23) and handle band workpiece preheating block (34) and handle band heat block (35) by pipeline respectively.
CN2011200597847U 2011-03-09 2011-03-09 Carton handle installing equipment Expired - Lifetime CN202062706U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200597847U CN202062706U (en) 2011-03-09 2011-03-09 Carton handle installing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200597847U CN202062706U (en) 2011-03-09 2011-03-09 Carton handle installing equipment

Publications (1)

Publication Number Publication Date
CN202062706U true CN202062706U (en) 2011-12-07

Family

ID=45056583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200597847U Expired - Lifetime CN202062706U (en) 2011-03-09 2011-03-09 Carton handle installing equipment

Country Status (1)

Country Link
CN (1) CN202062706U (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102173102A (en) * 2011-03-09 2011-09-07 保定市汉德新材料科技有限公司 Device for installing carton handles
CN102602051A (en) * 2012-04-16 2012-07-25 柴长银 Conveying device for environment friendly bag carrying handle
CN103042726A (en) * 2013-01-28 2013-04-17 于颢明 Transmission device for threading machine of handle of paper box
CN103350525A (en) * 2013-07-16 2013-10-16 王前宏 Full-automatic paper box handle drawing-in machine
CN103350524A (en) * 2013-07-16 2013-10-16 王前宏 Plastic lifting handle sizing device of full-automatic carton lifting handle eyeleting machine
CN103600515A (en) * 2013-12-05 2014-02-26 天津商业大学 Automatic device for assembling handle
CN104228141A (en) * 2014-09-18 2014-12-24 王前宏 Carton mouth opening device for carton handle buckle drawing-in machine
CN104228146A (en) * 2014-09-18 2014-12-24 王前宏 Carton handle buckle sizing device for carton handle buckle drawing-in machine
CN104260421A (en) * 2014-09-18 2015-01-07 王前宏 Carton supporting fastener conveying part translation device for carton handle fastener passing machine
CN105058866A (en) * 2015-07-14 2015-11-18 宣城市博思特日用品有限公司 Processing device with automatic piece attaching function for paper cups with handles
CN106393792A (en) * 2016-08-31 2017-02-15 侯全虎 Machine equipment for online mounting of lifting ribbon
CN109016644A (en) * 2018-08-27 2018-12-18 唐山新联印刷机械集团有限公司 A kind of method and apparatus that packing case installs plastic handles
CN109049849A (en) * 2018-07-10 2018-12-21 佛山市思耐塑料科技有限公司 A kind of carton eye ring fitting machine
CN112193876A (en) * 2020-09-18 2021-01-08 温州职业技术学院 Three-station handle belt transfer installation device of handle installation machine and use method thereof

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102173102A (en) * 2011-03-09 2011-09-07 保定市汉德新材料科技有限公司 Device for installing carton handles
CN102173102B (en) * 2011-03-09 2012-11-28 保定市汉德新材料科技有限公司 Device for installing carton handles
CN102602051A (en) * 2012-04-16 2012-07-25 柴长银 Conveying device for environment friendly bag carrying handle
CN103042726A (en) * 2013-01-28 2013-04-17 于颢明 Transmission device for threading machine of handle of paper box
CN103042726B (en) * 2013-01-28 2015-12-09 于颢明 Tape threading machine for paper box handle transmission device
CN103350524B (en) * 2013-07-16 2015-04-22 王前宏 Plastic lifting handle sizing device of full-automatic carton lifting handle eyeleting machine
CN103350524A (en) * 2013-07-16 2013-10-16 王前宏 Plastic lifting handle sizing device of full-automatic carton lifting handle eyeleting machine
CN103350525A (en) * 2013-07-16 2013-10-16 王前宏 Full-automatic paper box handle drawing-in machine
CN103350525B (en) * 2013-07-16 2015-05-20 王前宏 Full-automatic paper box handle drawing-in machine
CN103600515A (en) * 2013-12-05 2014-02-26 天津商业大学 Automatic device for assembling handle
CN104228146B (en) * 2014-09-18 2016-09-07 王前宏 A kind of carton eye ring wears the carton eye ring button shaping equipment of deduction
CN104260421A (en) * 2014-09-18 2015-01-07 王前宏 Carton supporting fastener conveying part translation device for carton handle fastener passing machine
CN104228146A (en) * 2014-09-18 2014-12-24 王前宏 Carton handle buckle sizing device for carton handle buckle drawing-in machine
CN104228141A (en) * 2014-09-18 2014-12-24 王前宏 Carton mouth opening device for carton handle buckle drawing-in machine
CN104228141B (en) * 2014-09-18 2017-01-11 王前宏 Carton mouth opening device for carton handle buckle drawing-in machine
CN105058866A (en) * 2015-07-14 2015-11-18 宣城市博思特日用品有限公司 Processing device with automatic piece attaching function for paper cups with handles
CN105058866B (en) * 2015-07-14 2018-06-08 宣城市博思特日用品有限公司 A kind of handle dixie cup automatic chip mounting processing unit (plant)
CN106393792A (en) * 2016-08-31 2017-02-15 侯全虎 Machine equipment for online mounting of lifting ribbon
CN106393792B (en) * 2016-08-31 2018-11-20 廊坊大鹏自动化科技有限公司 A kind of machinery equipment of online installation lift belt
CN109049849A (en) * 2018-07-10 2018-12-21 佛山市思耐塑料科技有限公司 A kind of carton eye ring fitting machine
CN109016644A (en) * 2018-08-27 2018-12-18 唐山新联印刷机械集团有限公司 A kind of method and apparatus that packing case installs plastic handles
CN112193876A (en) * 2020-09-18 2021-01-08 温州职业技术学院 Three-station handle belt transfer installation device of handle installation machine and use method thereof

Similar Documents

Publication Publication Date Title
CN202062706U (en) Carton handle installing equipment
CN102173102B (en) Device for installing carton handles
CN203237458U (en) Packaging film end sealing device and single-piece wet tissue machine
CN102328755B (en) Continuous sealing and cutting machine
CN102674069A (en) Novel tape adhering machine
CN107097520A (en) One kind windowing laminating machine
CN105398603B (en) A kind of elongate body package system
CN113715320B (en) Automatic PVC membrane device that pastes of gypsum board
CN207107012U (en) The laminating machine of aluminium alloy label
CN204078121U (en) Automatic bag sheathing sealing machine
CN109109380A (en) A kind of hot melt adhesive of carton eye ring wears deduction and its installation method automatically
CN202379522U (en) Glass fiber cloth trimming machine
CN205853551U (en) A kind of 3D double-sided glass laminating machine
CN106607952B (en) Hand-held feeding and cutting device of full-automatic bag making machine
CN107775965A (en) A kind of film automatic mosaic system
CN207536893U (en) A kind of full-automatic patch double faced adhesive tape machine
CN205526862U (en) Asynchronous cutting device
CN210763504U (en) A cloth detecting system is woven to bad for on braided bag guillootine
CN105329498B (en) A kind of packaging bag continuity process equipment of automatic blanking
CN205114675U (en) Automatic check board apparatus for producing
CN105415747A (en) Packing strip machining control system conducting feeding and discharging automatically
CN212556960U (en) Film pasting mechanism
CN205600893U (en) Full -automatic infinity connects lead aircraft
CN204078956U (en) A kind of automatic charging device
RU43536U1 (en) CAPACITY LABELING MACHINE

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20111207

Effective date of abandoning: 20130306

RGAV Abandon patent right to avoid regrant