CN202047427U - Inspection well - Google Patents
Inspection well Download PDFInfo
- Publication number
- CN202047427U CN202047427U CN2011201205142U CN201120120514U CN202047427U CN 202047427 U CN202047427 U CN 202047427U CN 2011201205142 U CN2011201205142 U CN 2011201205142U CN 201120120514 U CN201120120514 U CN 201120120514U CN 202047427 U CN202047427 U CN 202047427U
- Authority
- CN
- China
- Prior art keywords
- well seat
- pass connection
- hooking
- hook structures
- manhole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses an inspection well, which is capable of improving mounting efficiency and comprises a well seat and bypass connectors connected onto the well seat. The well seat and/or the bypass connectors are provided with a plurality of hook structures. By the aid of the hook structures arranged on the well seat and/or the bypass connectors, when pipes are connected, take-up devices can be directly hung on the hook structures, constructors and construction machinery can exert pull force through the take-up devices, so that the bypass connectors and the pipes are connected together conveniently, the mounting efficiency of the pipes is greatly improved and the inspection well is not easy to damage. The hook structures formed by arranging hanging holes on a base are simple in manufacturing, low in cost, firm in hooking and not easy to fall off. The hook structures which are formed by arranging bends at the ends of bearing posts are convenient in hooking, simple in structure and low in cost. By the aid of a plurality of hook structures distributed uniformly, the inspection well is even in stressing, more convenient in pipe connecting and suitable for popularization and application in the field of plastic parts.
Description
Technical field
The utility model relates to the working of plastics field, especially a kind of manhole.
Background technology
Existing manhole comprises well seat and by-pass connection, and by-pass connection is connected on the well seat, in use, usually need on by-pass connection, connect tubing, at present, when connecting tubing, general pit shaft position of adopting the direct push-and-pull well of the mode seat of manpower push-and-pull, or putting rope at the boss of manhole applies pulling force with construction machinery, and tubing is connected on the by-pass connection, and this mode is firmly inconvenient, require great effort again during installation fee, installation effectiveness is low and damage manhole when mounted easily.
The utility model content
Technical problem to be solved in the utility model provides a kind of manhole that improves installation effectiveness.
The technical scheme that its technical problem that solves the utility model adopts is: this manhole, comprise the well seat, and by-pass connection, by-pass connection are connected on the well seat, and described well seat and/or by-pass connection are provided with a plurality of hooking structures.
Further be, described hooking structure comprises pedestal, and pedestal is provided with hanging hole.
Further be, described hooking structure comprises bearing column, is provided with elbow in the termination of bearing column.
Further be, describedly be arranged on a plurality of hooking structures on the well seat, describedly be arranged on a plurality of hooking structures on the by-pass connection along the uniform arrangement of the circumferential direction of by-pass connection along the uniform arrangement of the circumferential direction of well seat.
The beneficial effects of the utility model are: be provided with a plurality of hooking structures by well seat and/or by-pass connection, when connecting tubing, spooler can be directly hung on the hooking structure, constructor and construction machinery can apply pulling force by spooler, thereby conveniently by-pass connection and tubing are linked together, save time and laborsaving, the tubing installation effectiveness improves greatly, and is not easy to damage manhole.The hooking structure that hanging hole forms is set on pedestal, makes simply, cost is low, and hook is firm, difficult drop-off.The hooking structure that elbow forms is set in the bearing column termination, and hook is convenient, and simple in structure, cost is low.Be arranged on a plurality of hooking structures on the well seat along the uniform arrangement of the circumferential direction of well seat, be arranged on a plurality of hooking structures on the by-pass connection, can make manhole stressed evenly along the uniform arrangement of the circumferential direction of by-pass connection, more convenient when connecting tubing.
Description of drawings
Fig. 1 is the utility model manhole structural representation;
Fig. 2 is another structural representation of the utility model manhole;
Be labeled as among the figure: well seat 1, by-pass connection 2, pedestal 3, hanging hole 4, bearing column 5, elbow 6.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further specified.
As shown in Figure 1, 2, this manhole comprises well seat 1, and by-pass connection 2, by-pass connection 2 are connected on the well seat 1, and described well seat 1 and/or by-pass connection 2 are provided with a plurality of hooking structures.Be provided with a plurality of hooking structures by well seat 1 and/or by-pass connection 2, when connecting tubing, spooler can be directly hung on the hooking structure, constructor and construction machinery can apply pulling force by spooler, thereby conveniently by-pass connection 2 and tubing are linked together, save time and laborsaving, the tubing installation effectiveness improves greatly, and is not easy to damage manhole.Described hooking structure comprises pedestal 3, and pedestal 3 is provided with hanging hole 4, and this hooking structure is made simple, and cost is low, and hook is firm, difficult drop-off.Described hooking structure comprises bearing column 5, is provided with elbow 6 in the termination of bearing column 5, and hook is convenient, and simple in structure, cost is low.Describedly be arranged on a plurality of hooking structures on the well seat 1 along the uniform arrangement of the circumferential direction of well seat 1, describedly be arranged on a plurality of hooking structures on the by-pass connection 2 along the uniform arrangement of the circumferential direction of by-pass connection 2, can make manhole stressed evenly, more convenient when connecting tubing.
Concrete, this manhole comprises well seat 1, and by-pass connection 2, by-pass connection 2 are connected on the well seat 1, and described well seat 1 and/or by-pass connection 2 are provided with a plurality of hooking structures.Described hooking structure can have numerous embodiments, for example, can on well seat 1 and/or by-pass connection 2 the U-shaped drag hook be set and form described hooking structure, also can on well seat 1 and/or by-pass connection 2 groove be set, the hook on the spooler can be hooked in the edge of groove, as a kind of preferred mode be: described hooking structure comprises pedestal 3, pedestal 3 is provided with hanging hole 4, and this hooking structure is made simple, and cost is low, hook is firm, difficult drop-off.When tubing is installed, the hook on the spooler is hooked the frame of pedestal, or rope is passed hanging hole, then spooler or rope are connected with construction machinery, and tubing is aimed at by-pass connection 2, construction machinery applies pulling force, tubing and by-pass connection 2 are docking together, finish the installation of tubing.In the above-described embodiment, can be according to actual needs or the restriction of processing conditions, pedestal 3 can be processed into different shapes such as cuboid, cylinder or cone, can be circular port, square opening or bellmouth etc. with the shaped design of hanging hole 4 according to the shape of pedestal 3 and the size of load.In addition, be arranged on a plurality of hooking structures on the well seat 1, be arranged on a plurality of hooking structures on the by-pass connection 2, can make manhole stressed evenly along the uniform arrangement of the circumferential direction of by-pass connection 2 along the uniform arrangement of the circumferential direction of well seat 1, more convenient when connecting tubing.
This manhole another preferred embodiment be: this manhole, comprise well seat 1, and by-pass connection 2, by-pass connection 2 are connected on the well seat 1, and described well seat 1 and/or by-pass connection 2 are provided with a plurality of hooking structures.Described hooking structure comprises bearing column 5, is provided with elbow 6 in the termination of bearing column 5, and hook is convenient, and simple in structure, cost is low.When tubing is installed, hook on the spooler is hooked in elbow 6 places of bearing column 5, or rope hung on the elbow 6, then spooler or rope are connected with construction machinery, and tubing aimed at by-pass connection 2, construction machinery applies pulling force, and tubing and by-pass connection 2 are docking together, and finishes the installation of tubing.In addition, be arranged on a plurality of hooking structures on the well seat 1, be arranged on a plurality of hooking structures on the by-pass connection 2, can make manhole stressed evenly along the uniform arrangement of the circumferential direction of by-pass connection 2 along the uniform arrangement of the circumferential direction of well seat 1, more convenient when connecting tubing.
Claims (4)
1. manhole comprises well seat (1), by-pass connection (2), and by-pass connection (2) is connected on the well seat (1), it is characterized in that: described well seat (1) and/or by-pass connection (2) are provided with a plurality of hooking structures.
2. manhole as claimed in claim 1 is characterized in that: described hooking structure comprises pedestal (3), and pedestal (3) is provided with hanging hole (4).
3. manhole as claimed in claim 1 is characterized in that: described hooking structure comprises bearing column (5), is provided with elbow (6) in the termination of bearing column (5).
4. according to any described manhole of claim in the claim 1 to 3, it is characterized in that: describedly be arranged on a plurality of hooking structures on the well seat (1), describedly be arranged on a plurality of hooking structures on the by-pass connection (2) along the uniform arrangement of circumferential direction of by-pass connection (2) along the uniform arrangement of circumferential direction of well seat (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201205142U CN202047427U (en) | 2011-04-22 | 2011-04-22 | Inspection well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201205142U CN202047427U (en) | 2011-04-22 | 2011-04-22 | Inspection well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202047427U true CN202047427U (en) | 2011-11-23 |
Family
ID=44987740
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201205142U Expired - Fee Related CN202047427U (en) | 2011-04-22 | 2011-04-22 | Inspection well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202047427U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103266627A (en) * | 2013-04-27 | 2013-08-28 | 宁夏大林科技有限公司 | Manhole |
-
2011
- 2011-04-22 CN CN2011201205142U patent/CN202047427U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103266627A (en) * | 2013-04-27 | 2013-08-28 | 宁夏大林科技有限公司 | Manhole |
CN103266627B (en) * | 2013-04-27 | 2015-09-02 | 宁夏大林科技有限公司 | Manhole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204643383U (en) | A kind of cable drum with locking mechanism | |
CN202047427U (en) | Inspection well | |
CN203390799U (en) | Pump body clamp for oil pump | |
CN201870415U (en) | Simple curtain hook mounting and dismounting device | |
CN201450302U (en) | Sliding cable clamp component | |
CN203835456U (en) | Hose hoisting device on working surface for coal mining | |
CN203756202U (en) | Rapid feeder for vertical anchor cable | |
CN203809903U (en) | Lightningproof and antistatic flange bridging device | |
CN202812472U (en) | Leaky coaxial cable (LCC) type feeder clamp | |
CN201875316U (en) | Moving device for blind flange | |
CN202752500U (en) | Steel wire bending device | |
CN202846480U (en) | Water meter bridge extractor | |
CN203471711U (en) | Three-jaw extractor | |
CN202285994U (en) | Bionic bird scaring device for power transmission line | |
CN202610527U (en) | Suspended thread leading device for sewing machine tool | |
CN204022273U (en) | Pipe clamp | |
CN201316979Y (en) | Mounting device of plastic pipe | |
CN203026851U (en) | Simple cable extraction device | |
CN203607751U (en) | Portable drawing device | |
CN203034471U (en) | Structural design of single-pipe-pile foundation plug type accessory in offshore wind plant | |
CN202971529U (en) | Corresponding combined transmission shaft | |
CN201737225U (en) | Storage tank with reinforcing rib | |
CN203352113U (en) | Cable carriage | |
CN210430737U (en) | Auxiliary device for cable laying | |
CN202564893U (en) | Lead fixing fitting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111123 Termination date: 20170422 |