CN202047427U CN2011201205142U CN201120120514U CN202047427U CN 202047427 U CN202047427 U CN 202047427U CN 2011201205142 U CN2011201205142 U CN 2011201205142U CN 201120120514 U CN201120120514 U CN 201120120514U CN 202047427 U CN202047427 U CN 202047427U
Authority
CN
China
Prior art keywords
well seat
pass connection
hooking
hook structures
manhole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201205142U
Other languages
Chinese (zh)
Inventor
张应忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meiwoshi Electromechanical Sci & Tech Co Ltd Chengdu
Original Assignee
Meiwoshi Electromechanical Sci & Tech Co Ltd Chengdu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meiwoshi Electromechanical Sci & Tech Co Ltd Chengdu filed Critical Meiwoshi Electromechanical Sci & Tech Co Ltd Chengdu
Priority to CN2011201205142U priority Critical patent/CN202047427U/en
Application granted granted Critical
Publication of CN202047427U publication Critical patent/CN202047427U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses an inspection well, which is capable of improving mounting efficiency and comprises a well seat and bypass connectors connected onto the well seat. The well seat and/or the bypass connectors are provided with a plurality of hook structures. By the aid of the hook structures arranged on the well seat and/or the bypass connectors, when pipes are connected, take-up devices can be directly hung on the hook structures, constructors and construction machinery can exert pull force through the take-up devices, so that the bypass connectors and the pipes are connected together conveniently, the mounting efficiency of the pipes is greatly improved and the inspection well is not easy to damage. The hook structures formed by arranging hanging holes on a base are simple in manufacturing, low in cost, firm in hooking and not easy to fall off. The hook structures which are formed by arranging bends at the ends of bearing posts are convenient in hooking, simple in structure and low in cost. By the aid of a plurality of hook structures distributed uniformly, the inspection well is even in stressing, more convenient in pipe connecting and suitable for popularization and application in the field of plastic parts.

Description

Manhole
Technical field
The utility model relates to the working of plastics field, especially a kind of manhole.
Background technology
Existing manhole comprises well seat and by-pass connection, and by-pass connection is connected on the well seat, in use, usually need on by-pass connection, connect tubing, at present, when connecting tubing, general pit shaft position of adopting the direct push-and-pull well of the mode seat of manpower push-and-pull, or putting rope at the boss of manhole applies pulling force with construction machinery, and tubing is connected on the by-pass connection, and this mode is firmly inconvenient, require great effort again during installation fee, installation effectiveness is low and damage manhole when mounted easily.
The utility model content
Technical problem to be solved in the utility model provides a kind of manhole that improves installation effectiveness.
The technical scheme that its technical problem that solves the utility model adopts is: this manhole, comprise the well seat, and by-pass connection, by-pass connection are connected on the well seat, and described well seat and/or by-pass connection are provided with a plurality of hooking structures.
Further be, described hooking structure comprises pedestal, and pedestal is provided with hanging hole.
Further be, described hooking structure comprises bearing column, is provided with elbow in the termination of bearing column.
Further be, describedly be arranged on a plurality of hooking structures on the well seat, describedly be arranged on a plurality of hooking structures on the by-pass connection along the uniform arrangement of the circumferential direction of by-pass connection along the uniform arrangement of the circumferential direction of well seat.
The beneficial effects of the utility model are: be provided with a plurality of hooking structures by well seat and/or by-pass connection, when connecting tubing, spooler can be directly hung on the hooking structure, constructor and construction machinery can apply pulling force by spooler, thereby conveniently by-pass connection and tubing are linked together, save time and laborsaving, the tubing installation effectiveness improves greatly, and is not easy to damage manhole.The hooking structure that hanging hole forms is set on pedestal, makes simply, cost is low, and hook is firm, difficult drop-off.The hooking structure that elbow forms is set in the bearing column termination, and hook is convenient, and simple in structure, cost is low.Be arranged on a plurality of hooking structures on the well seat along the uniform arrangement of the circumferential direction of well seat, be arranged on a plurality of hooking structures on the by-pass connection, can make manhole stressed evenly along the uniform arrangement of the circumferential direction of by-pass connection, more convenient when connecting tubing.
Description of drawings
Fig. 1 is the utility model manhole structural representation;
Fig. 2 is another structural representation of the utility model manhole;
Be labeled as among the figure: well seat 1, by-pass connection 2, pedestal 3, hanging hole 4, bearing column 5, elbow 6.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further specified.
As shown in Figure 1, 2, this manhole comprises well seat 1, and by-pass connection 2, by-pass connection 2 are connected on the well seat 1, and described well seat 1 and/or by-pass connection 2 are provided with a plurality of hooking structures.Be provided with a plurality of hooking structures by well seat 1 and/or by-pass connection 2, when connecting tubing, spooler can be directly hung on the hooking structure, constructor and construction machinery can apply pulling force by spooler, thereby conveniently by-pass connection 2 and tubing are linked together, save time and laborsaving, the tubing installation effectiveness improves greatly, and is not easy to damage manhole.Described hooking structure comprises pedestal 3, and pedestal 3 is provided with hanging hole 4, and this hooking structure is made simple, and cost is low, and hook is firm, difficult drop-off.Described hooking structure comprises bearing column 5, is provided with elbow 6 in the termination of bearing column 5, and hook is convenient, and simple in structure, cost is low.Describedly be arranged on a plurality of hooking structures on the well seat 1 along the uniform arrangement of the circumferential direction of well seat 1, describedly be arranged on a plurality of hooking structures on the by-pass connection 2 along the uniform arrangement of the circumferential direction of by-pass connection 2, can make manhole stressed evenly, more convenient when connecting tubing.
Concrete, this manhole comprises well seat 1, and by-pass connection 2, by-pass connection 2 are connected on the well seat 1, and described well seat 1 and/or by-pass connection 2 are provided with a plurality of hooking structures.Described hooking structure can have numerous embodiments, for example, can on well seat 1 and/or by-pass connection 2 the U-shaped drag hook be set and form described hooking structure, also can on well seat 1 and/or by-pass connection 2 groove be set, the hook on the spooler can be hooked in the edge of groove, as a kind of preferred mode be: described hooking structure comprises pedestal 3, pedestal 3 is provided with hanging hole 4, and this hooking structure is made simple, and cost is low, hook is firm, difficult drop-off.When tubing is installed, the hook on the spooler is hooked the frame of pedestal, or rope is passed hanging hole, then spooler or rope are connected with construction machinery, and tubing is aimed at by-pass connection 2, construction machinery applies pulling force, tubing and by-pass connection 2 are docking together, finish the installation of tubing.In the above-described embodiment, can be according to actual needs or the restriction of processing conditions, pedestal 3 can be processed into different shapes such as cuboid, cylinder or cone, can be circular port, square opening or bellmouth etc. with the shaped design of hanging hole 4 according to the shape of pedestal 3 and the size of load.In addition, be arranged on a plurality of hooking structures on the well seat 1, be arranged on a plurality of hooking structures on the by-pass connection 2, can make manhole stressed evenly along the uniform arrangement of the circumferential direction of by-pass connection 2 along the uniform arrangement of the circumferential direction of well seat 1, more convenient when connecting tubing.
This manhole another preferred embodiment be: this manhole, comprise well seat 1, and by-pass connection 2, by-pass connection 2 are connected on the well seat 1, and described well seat 1 and/or by-pass connection 2 are provided with a plurality of hooking structures.Described hooking structure comprises bearing column 5, is provided with elbow 6 in the termination of bearing column 5, and hook is convenient, and simple in structure, cost is low.When tubing is installed, hook on the spooler is hooked in elbow 6 places of bearing column 5, or rope hung on the elbow 6, then spooler or rope are connected with construction machinery, and tubing aimed at by-pass connection 2, construction machinery applies pulling force, and tubing and by-pass connection 2 are docking together, and finishes the installation of tubing.In addition, be arranged on a plurality of hooking structures on the well seat 1, be arranged on a plurality of hooking structures on the by-pass connection 2, can make manhole stressed evenly along the uniform arrangement of the circumferential direction of by-pass connection 2 along the uniform arrangement of the circumferential direction of well seat 1, more convenient when connecting tubing.

Claims (4)

1. manhole comprises well seat (1), by-pass connection (2), and by-pass connection (2) is connected on the well seat (1), it is characterized in that: described well seat (1) and/or by-pass connection (2) are provided with a plurality of hooking structures.
2. manhole as claimed in claim 1 is characterized in that: described hooking structure comprises pedestal (3), and pedestal (3) is provided with hanging hole (4).
3. manhole as claimed in claim 1 is characterized in that: described hooking structure comprises bearing column (5), is provided with elbow (6) in the termination of bearing column (5).
4. according to any described manhole of claim in the claim 1 to 3, it is characterized in that: describedly be arranged on a plurality of hooking structures on the well seat (1), describedly be arranged on a plurality of hooking structures on the by-pass connection (2) along the uniform arrangement of circumferential direction of by-pass connection (2) along the uniform arrangement of circumferential direction of well seat (1).
CN2011201205142U 2011-04-22 2011-04-22 Inspection well Expired - Fee Related CN202047427U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201205142U CN202047427U (en) 2011-04-22 2011-04-22 Inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201205142U CN202047427U (en) 2011-04-22 2011-04-22 Inspection well

Publications (1)

Publication Number Publication Date
CN202047427U true CN202047427U (en) 2011-11-23

Family

ID=44987740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201205142U Expired - Fee Related CN202047427U (en) 2011-04-22 2011-04-22 Inspection well

Country Status (1)

Country Link
CN (1) CN202047427U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266627A (en) * 2013-04-27 2013-08-28 宁夏大林科技有限公司 Manhole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103266627A (en) * 2013-04-27 2013-08-28 宁夏大林科技有限公司 Manhole
CN103266627B (en) * 2013-04-27 2015-09-02 宁夏大林科技有限公司 Manhole

Similar Documents

Publication Publication Date Title
CN204643383U (en) A kind of cable drum with locking mechanism
CN202047427U (en) Inspection well
CN203390799U (en) Pump body clamp for oil pump
CN201870415U (en) Simple curtain hook mounting and dismounting device
CN201450302U (en) Sliding cable clamp component
CN203835456U (en) Hose hoisting device on working surface for coal mining
CN203756202U (en) Rapid feeder for vertical anchor cable
CN203809903U (en) Lightningproof and antistatic flange bridging device
CN202812472U (en) Leaky coaxial cable (LCC) type feeder clamp
CN201875316U (en) Moving device for blind flange
CN202752500U (en) Steel wire bending device
CN202846480U (en) Water meter bridge extractor
CN203471711U (en) Three-jaw extractor
CN202285994U (en) Bionic bird scaring device for power transmission line
CN202610527U (en) Suspended thread leading device for sewing machine tool
CN204022273U (en) Pipe clamp
CN201316979Y (en) Mounting device of plastic pipe
CN203026851U (en) Simple cable extraction device
CN203607751U (en) Portable drawing device
CN203034471U (en) Structural design of single-pipe-pile foundation plug type accessory in offshore wind plant
CN202971529U (en) Corresponding combined transmission shaft
CN201737225U (en) Storage tank with reinforcing rib
CN203352113U (en) Cable carriage
CN210430737U (en) Auxiliary device for cable laying
CN202564893U (en) Lead fixing fitting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123