CN103266627B - Manhole - Google Patents

Manhole Download PDF

Info

Publication number
CN103266627B
CN103266627B CN201310151803.2A CN201310151803A CN103266627B CN 103266627 B CN103266627 B CN 103266627B CN 201310151803 A CN201310151803 A CN 201310151803A CN 103266627 B CN103266627 B CN 103266627B
Authority
CN
China
Prior art keywords
base
interface
well bore
manhole
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310151803.2A
Other languages
Chinese (zh)
Other versions
CN103266627A (en
Inventor
王大林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA DALIN TECHNOLOGY Co Ltd
Original Assignee
NINGXIA DALIN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA DALIN TECHNOLOGY Co Ltd filed Critical NINGXIA DALIN TECHNOLOGY Co Ltd
Priority to CN201310151803.2A priority Critical patent/CN103266627B/en
Publication of CN103266627A publication Critical patent/CN103266627A/en
Application granted granted Critical
Publication of CN103266627B publication Critical patent/CN103266627B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a kind of municipal engineering underdrainage, blowdown manhole, manhole comprises base, sealing mat and well bore; Base comprises bottom and the first side wall, in base bottom, sediment space is set, two symmetrical first interfaces are set in the both sides of base the first side wall, base and well bore joint arrange the first docking section, two symmetrical the first prefabricated interfaces are set in the both sides of base the first side wall, this first prefabricated interface is made up of the semicircular body of different-diameter, and well bore comprises the second sidewall and the second docking section, arranges two symmetrical the second interfaces in the side of the second sidewall.The invention has the beneficial effects as follows: by the standard component of injection mo(u)lding, manhole generalization is improved, easy construction, its sealing is good to adopt the sealing mat of quality of rubber materials to guarantee between base and well bore, adopting plastic material to improve anti-oxidant and decay resistance, improve the application life of manhole by arranging reinforcing rib.

Description

Manhole
Technical field
The present invention relates to a kind of municipal engineering underdrainage, blowdown manhole, particularly high, the easy construction of a kind of generalization, good airproof performance, antioxidant anticorrosive performance be good, easy to use, long service life and the manhole that adopts plastic material to make.
Background technology
Under existing municipal engineering land used, webmaster manhole mostly is brick concrete inspection well, mainly there is following shortcoming in it: first intensity is low, the support strength of brickwork construction is low, and the brickwork construction reducing reducing part especially near road surface is easily subsided because the horizontal active force of imbalance impacts; Secondly well body construction cycle is long, and construction is complicated, owing to must piling up at manual scene, high to civil engineering requirement, and standardization, generalization, seriation degree are poor, by hand and materials number be the key factor affecting quality; Exist in addition and can not change, easily break and seepage and the defect such as to pollute, need frequently keep in repair.
Summary of the invention
Technical problem to be solved by this invention is to provide that a kind of generalization is high, easy construction, good airproof performance, antioxidant anticorrosive performance are good, easy to use, long service life and the manhole that makes of plastic material, to overcome the above-mentioned defect that existing manhole exists.
The technical scheme of technical solution problem of the present invention is as follows: manhole comprises base, sealing mat and well bore from bottom to up, base is integrated injection molded, base comprises bottom and the first side wall, bottom is positioned at one end of the first side wall, in base bottom, sediment space is set, survey in base bottom week and wavy reinforcing rib is set, two symmetrical first interfaces are set in the both sides of base the first side wall, this first interface is arc body, bottom outside in base arranges the first horizontal and vertical reinforcing rib, base and well bore joint arrange the first docking section, first fixing hole is set on the first docking section, two symmetrical the first prefabricated interfaces are set in the both sides of base the first side wall, this first prefabricated interface is made up of the semicircular body of different-diameter, and the front end of this first prefabricated interface is closed, and the first prefabricated interface and first interface are alternately arranged on the first side wall, well bore is integrated injection molded, well bore comprises the second sidewall, the second docking section be combined with the first docking section, in the second reinforcing rib of the outer setting of well bore second sidewall, second docking section is arranged at one end of the second sidewall, two symmetrical the second interfaces are set in the side of the second sidewall, this second interface is arc body, two symmetrical the second prefabricated interfaces are set in the both sides of the second sidewall, this second prefabricated interface is made up of the semicircular body of different-diameter, and the front end of this second prefabricated interface is closed, and the second prefabricated interface and the second interface are alternately arranged on the first side wall.
As preferably, the end face of first interface is semi-annular shape.
As preferably, the end face of the second interface is semi-annular shape.
The invention has the beneficial effects as follows: by the standard component of injection mo(u)lding, manhole generalization is improved, manhole adopts the Split type structure of base, sealing mat and well bore to make easy construction, its sealing is good to adopt the sealing mat of quality of rubber materials to guarantee between base and well bore, adopt plastic material to improve anti-oxidant and decay resistance, base arranges the application life that the 3rd reinforcing rib that the first reinforcing rib and the second reinforcing rib and well bore arrange improves manhole.
Accompanying drawing explanation
Fig. 1 is manhole front view of the present invention.
Fig. 2 is manhole top view of the present invention.
Fig. 3 is manhole upward view of the present invention.
In figure: base 1, sealing mat 2, well bore 3, bottom 11, the first side wall 12, sediment space 13, wavy reinforcing rib 14, the prefabricated interface 35 of first interface 15, first reinforcing rib 16, first docking section 17, first fixing hole the 18, first prefabricated interface 19, second sidewall 31, second docking section 32, second reinforcing rib 33, second.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described, composition graphs 1 to Fig. 3, and manhole comprises base 1, sealing mat 2 and well bore 3 from bottom to up, base 1 is integrated injection molded, base 1 comprises bottom 11 and the first side wall 12, bottom 11 is positioned at one end of the first side wall 12, bottom base 1,11 arrange sediment space 13, within 11 weeks bottom base 1, survey and wavy reinforcing rib 14 is set, two symmetrical first interfaces 15 are set in the both sides of base 1 the first side wall 12, this first interface 15 is arc body, the end face of first interface 15 is semi-annular shape, in the first reinforcing rib 16 that bottom 11 arranged outside of base 1 is horizontal and vertical, base 1 and well bore 3 joint arrange the first docking section 17, first fixing hole 18 is set on the first docking section 17, two symmetrical the first prefabricated interfaces 19 are set in the both sides of base 1 the first side wall 12, this first prefabricated interface 19 is made up of the semicircular body of different-diameter, and the front end of this first prefabricated interface 19 is closed, and the first prefabricated interface 19 is alternately arranged on the first side wall with first interface 15, well bore 3 is integrated injection molded, well bore 3 comprises the second sidewall 31, the second docking section 32 be combined with the first docking section 17, in the second reinforcing rib 33 of the outer setting of well bore 3 second sidewall 31, second docking section 32 is arranged at one end of the second sidewall 31, two symmetrical the second interfaces 34 are set in the side of the second sidewall 31, this second interface 34 is arc body, the end face of the second interface 34 is semi-annular shape, two symmetrical the second prefabricated interfaces 35 are set in the both sides of the second sidewall 31, this second prefabricated interface 35 is made up of the semicircular body of different-diameter, and the front end of this second prefabricated interface 35 is closed, and the second prefabricated interface 35 and the second interface 34 are alternately arranged on the second sidewall 31.

Claims (2)

1. a manhole, is characterized in that: manhole comprises base, sealing mat and well bore from bottom to up, base is integrated injection molded, base comprises bottom and the first side wall, bottom is positioned at one end of the first side wall, in base bottom, sediment space is set, in all sides of base bottom, wavy reinforcing rib is set, two symmetrical first interfaces are set in the both sides of base the first side wall, this first interface is arc body, bottom outside in base arranges the first horizontal and vertical reinforcing rib, base and well bore joint arrange the first docking section, first fixing hole is set on the first docking section, two symmetrical the first prefabricated interfaces are set in the both sides of base the first side wall, this first prefabricated interface is made up of the semicircular body of different-diameter, and the front end of this first prefabricated interface is closed, and the first prefabricated interface and first interface are alternately arranged on the first side wall, well bore is integrated injection molded, well bore comprises the second sidewall, the second docking section be combined with the first docking section, in the second reinforcing rib of the outer setting of well bore second sidewall, second docking section is arranged at one end of the second sidewall, two symmetrical the second interfaces are set in the both sides of the second sidewall, this second interface is arc body, two symmetrical the second prefabricated interfaces are set in the both sides of the second sidewall, this second prefabricated interface is made up of the semicircular body of different-diameter, and the front end of this second prefabricated interface is closed, and the second prefabricated interface and the second interface are alternately arranged on the second sidewall.
2. manhole according to claim 1, is characterized in that: the end face of first interface is semi-annular shape.
3. manhole according to claim 1, is characterized in that: the end face of the second interface is semi-annular shape.
CN201310151803.2A 2013-04-27 2013-04-27 Manhole Expired - Fee Related CN103266627B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310151803.2A CN103266627B (en) 2013-04-27 2013-04-27 Manhole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310151803.2A CN103266627B (en) 2013-04-27 2013-04-27 Manhole

Publications (2)

Publication Number Publication Date
CN103266627A CN103266627A (en) 2013-08-28
CN103266627B true CN103266627B (en) 2015-09-02

Family

ID=49010281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310151803.2A Expired - Fee Related CN103266627B (en) 2013-04-27 2013-04-27 Manhole

Country Status (1)

Country Link
CN (1) CN103266627B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245744A (en) * 2016-09-28 2016-12-21 齐建军 A kind of closed one inspection shaft
CN109372084A (en) * 2018-12-12 2019-02-22 江苏通全球工程管业有限公司 A kind of inspection shaft
CN110126292A (en) * 2019-05-09 2019-08-16 常州信息职业技术学院 Large-scale combined plastic inspection well seat, contour machining equipment and forming method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4089139A (en) * 1976-08-24 1978-05-16 Armco Steel Corporation Segmented cylindrical reinforced plastic manhole structure
JPH11172711A (en) * 1997-12-11 1999-06-29 Miyama Kogyo Kk Synthetic resin manhole
CN202047427U (en) * 2011-04-22 2011-11-23 成都美沃实机电科技有限公司 Inspection well
CN202809815U (en) * 2012-07-27 2013-03-20 广东联塑科技实业有限公司 Assembled inspection shaft
CN203284876U (en) * 2013-04-27 2013-11-13 宁夏大林科技有限公司 Inspection well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4089139A (en) * 1976-08-24 1978-05-16 Armco Steel Corporation Segmented cylindrical reinforced plastic manhole structure
JPH11172711A (en) * 1997-12-11 1999-06-29 Miyama Kogyo Kk Synthetic resin manhole
CN202047427U (en) * 2011-04-22 2011-11-23 成都美沃实机电科技有限公司 Inspection well
CN202809815U (en) * 2012-07-27 2013-03-20 广东联塑科技实业有限公司 Assembled inspection shaft
CN203284876U (en) * 2013-04-27 2013-11-13 宁夏大林科技有限公司 Inspection well

Also Published As

Publication number Publication date
CN103266627A (en) 2013-08-28

Similar Documents

Publication Publication Date Title
CN103266627B (en) Manhole
CN102296987A (en) Roadside packing gob-side entry retaining soft medium top filling method
CN205475201U (en) A device for constructing steel plate concrete ground is wall even
CN203654427U (en) Inspection well
CN203284876U (en) Inspection well
CN203429771U (en) Manhole
CN203284802U (en) Inspection well body
CN103266626B (en) Manhole
CN203213149U (en) Inspection well
CN202925661U (en) Inspection well base
CN203429774U (en) Inspection well base
CN203654429U (en) Inspection well base
CN203654426U (en) Inspection well
CN203654428U (en) Inspection well body
CN203429772U (en) Manhole pedestal
CN203022029U (en) Inspection well base
CN203022026U (en) Inspection well component part
CN203022025U (en) Inspection well component part
CN204572029U (en) A kind of roadway floor reinforcing anchor rope component
CN103590429B (en) A kind of underground engineering cast-in-place concrete structure deformation joint structure
CN203213153U (en) Inspection well
CN204738446U (en) Prefabricated restraint concrete shear force wall wallboard
CN204491432U (en) Gate-type corrugated steel passage
CN103015291B (en) Oblique-angle two-way locking type sidewalk floor tile
KR20120134677A (en) The precast concrete closed conduit that is reinforced by the shear connector and constructing method of it

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150902

Termination date: 20160427