CN203429774U - Inspection well base - Google Patents

Inspection well base Download PDF

Info

Publication number
CN203429774U
CN203429774U CN201320465676.9U CN201320465676U CN203429774U CN 203429774 U CN203429774 U CN 203429774U CN 201320465676 U CN201320465676 U CN 201320465676U CN 203429774 U CN203429774 U CN 203429774U
Authority
CN
China
Prior art keywords
interface
inspection well
prefabricated
sidewall
interfaces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320465676.9U
Other languages
Chinese (zh)
Inventor
王大林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA DALIN TECHNOLOGY Co Ltd
Original Assignee
NINGXIA DALIN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA DALIN TECHNOLOGY Co Ltd filed Critical NINGXIA DALIN TECHNOLOGY Co Ltd
Priority to CN201320465676.9U priority Critical patent/CN203429774U/en
Application granted granted Critical
Publication of CN203429774U publication Critical patent/CN203429774U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model relates to an underground drainage and sewage disposal inspection well base for municipal engineering. The inspection well base comprises a bottom and a side wall, wherein the bottom is provided with a sediment space; a first reinforcing rib is arranged at the outer side of the end surface of the bottom; the side wall is a reduced body; two symmetrical interfaces are respectively arranged at the two sides of the side wall; a reinforcing base is arranged outside the interfaces; the reinforcing base is provided with a horizontal third reinforcing rib and a vertical third reinforcing rib; two symmetrical prefabricated interfaces are respectively arranged at the two sides of the side wall; each prefabricated interface is formed by semicircle bodies with different diameters, and the front end of the prefabricated interface is sealed; the prefabricated interfaces and the interfaces are alternately arranged on the side wall. The inspection well base has the beneficial effects that the universality of the inspection well base is improved by standard parts formed by injection molding; the inspection well base is formed by integral injection molding, thus having good sealing property; the inspection well base is made of plastic, so that the oxidation resistance and the corrosion resistance are improved; the inspection well base is provided with the reinforcing ribs, so that the service life of an inspection well body is prolonged.

Description

Manhole base
Technical field
The utility model relates to a kind of underdrainage, blowdown manhole base for municipal engineering, and particularly high, the easy construction of a kind of generalization, good airproof performance, antioxidant anticorrosive performance are good, easy to use, long service life and the manhole base that adopts plastic material to make.
Background technology
Under existing municipal engineering land used, webmaster manhole mostly is brick concrete inspection well, and it mainly exists following shortcoming: first intensity is low, and the support strength of brickwork construction is low, especially near the brickwork construction reducing reducing part on road surface, because active force impacts, easily subsides; Secondly well body construction cycle long, construction is complicated, owing to must piling up at manual scene, high to civil engineering requirement, standardization, generalization, seriation degree are poor, by hand and materials number be the key factor that affects quality; Exist in addition and can not change, easily break and seepage and the defect such as pollute, need frequently keep in repair.
Summary of the invention
Technical problem to be solved in the utility model is to provide that a kind of generalization is high, easy construction, good airproof performance, antioxidant anticorrosive performance are good, easy to use, long service life and the manhole base made of plastic material, to overcome the above-mentioned defect existing in prior art.
The technical scheme of the utility model technical solution problem is as follows: manhole base is integrated injection molded, manhole base comprises bottom and sidewall, bottom is positioned at one end of sidewall, thereby bottom is a hollow form forms sediment space, and the end face of bottom is rectangle, in bottom end face arranged outside the first reinforcing rib; Sidewall is for reducing shape body, wavy the second reinforcing rib is set on sidewall, the both sides of sidewall arrange two symmetrical interfaces, and this interface is arc body, and the end face of interface is semi-annular shape, interface outside arranges reinforced seat, this reinforced seat arranges the 3rd horizontal and vertical reinforcing rib, and the both sides of sidewall arrange two symmetrical prefabricated interfaces, and this prefabricated interface is comprised of the semicircular body of different-diameter, and the front end of this prefabricated interface sealing, and prefabricated interface and interface are alternately arranged on sidewall.
As preferably, the end face of interface is semi-annular shape.
As preferably, the end face of prefabricated interface is semi-annular shape.
The beneficial effects of the utility model are: by the standard component of injection mo(u)lding, the generalization of manhole base is improved, manhole base is integrated the injection molded good sealing property that makes it have, adopt plastic material to improve anti-oxidant and decay resistance, manhole base arranges the application life that reinforcing rib has improved manhole well bore.
Accompanying drawing explanation
Fig. 1 is the utility model manhole front view.
Fig. 2 is the utility model manhole top view.
Fig. 3 is the utility model manhole rear elevation.
Fig. 4 is the utility model manhole left view.
In figure: bottom 1, sediment space 11, sidewall 2, end face 12, the first reinforcing rib 13, the second reinforcing rib 3, interface 4, reinforced seat 5, the 3rd reinforcing rib 51, prefabricated interface 6.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further illustrated, in conjunction with Fig. 1 to Fig. 4, manhole base is integrated injection molded, manhole base comprises bottom 1 and sidewall 2, bottom 1 is positioned at one end of sidewall 2, form sediment space 11, and the end face 12 of bottom 1 is playground shape thereby bottom 1 is a hollow form, the cross section of bottom 1 is runway shape, end face 12 arranged outside the first reinforcing ribs 13 of 1 in bottom, sidewall 2 is for reducing shape body, wavy the second reinforcing rib 3 is set on sidewall 2, the both sides of sidewall 2 arrange two symmetrical interfaces 4, this interface 4 is arc body, the end face of interface 4 is semi-annular shape, the end face of interface 4 is semi-annular shape, interface 4 outsides arrange reinforced seat 5, this reinforced seat 5 arranges the 3rd horizontal and vertical reinforcing rib 51, the both sides of sidewall 2 arrange two symmetrical prefabricated interfaces 6, the end face of prefabricated interface 6 is semi-annular shape, this prefabricated interface 6 is comprised of the semicircular body of different-diameter, and the front end of this prefabricated interface 6 sealing, and prefabricated interface 6 is alternately arranged on sidewall 2 with interface 4.

Claims (3)

1. a manhole base, it is characterized in that: manhole base is integrated injection molded, manhole base comprises bottom and sidewall, bottom is positioned at one end of sidewall, thereby bottom is a hollow form forms sediment space, and the end face of bottom is rectangle, in bottom end face arranged outside the first reinforcing rib; Sidewall is for reducing shape body, wavy the second reinforcing rib is set on sidewall, the both sides of sidewall arrange two symmetrical interfaces, and this interface is arc body, and the end face of interface is semi-annular shape, interface outside arranges reinforced seat, this reinforced seat arranges the 3rd horizontal and vertical reinforcing rib, and the both sides of sidewall arrange two symmetrical prefabricated interfaces, and this prefabricated interface is comprised of the semicircular body of different-diameter, and the front end of this prefabricated interface sealing, and prefabricated interface and interface are alternately arranged on sidewall.
2. manhole base according to claim 1, is characterized in that: the end face of interface is semi-annular shape.
3. manhole base according to claim 1, is characterized in that: the end face of prefabricated interface is semi-annular shape.
CN201320465676.9U 2013-08-01 2013-08-01 Inspection well base Expired - Fee Related CN203429774U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320465676.9U CN203429774U (en) 2013-08-01 2013-08-01 Inspection well base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320465676.9U CN203429774U (en) 2013-08-01 2013-08-01 Inspection well base

Publications (1)

Publication Number Publication Date
CN203429774U true CN203429774U (en) 2014-02-12

Family

ID=50058822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320465676.9U Expired - Fee Related CN203429774U (en) 2013-08-01 2013-08-01 Inspection well base

Country Status (1)

Country Link
CN (1) CN203429774U (en)

Similar Documents

Publication Publication Date Title
CN103061782B (en) Large-section earth pressure balancing rectangular jacking pipe joint of motor vehicle tunnel and method for constructing large-section earth pressure balancing rectangular jacking pipe
CN103266627B (en) Manhole
CN205190987U (en) Polypropylene corrugated pipe
CN203654427U (en) Inspection well
CN203429774U (en) Inspection well base
CN203284802U (en) Inspection well body
CN203284876U (en) Inspection well
CN203429771U (en) Manhole
CN203654429U (en) Inspection well base
CN202925661U (en) Inspection well base
CN203384573U (en) Section bar special for spiral winding enhanced pipeline
CN203654428U (en) Inspection well body
CN103266626B (en) Manhole
CN203429772U (en) Manhole pedestal
CN203654426U (en) Inspection well
CN203213149U (en) Inspection well
CN203022026U (en) Inspection well component part
CN203022029U (en) Inspection well base
CN203022025U (en) Inspection well component part
CN203462488U (en) Three-way plastic inspection well with precipitating chamber
CN203462489U (en) Tee-joint plastic inspection well
CN204491432U (en) Gate-type corrugated steel passage
CN203213153U (en) Inspection well
CN204282402U (en) A kind of manhole well seat
CN202500155U (en) Plastic manhole having generally round structure and provided with ribs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20150801

EXPY Termination of patent right or utility model