CN202831182U - Component part of well bore of inspection well - Google Patents
Component part of well bore of inspection well Download PDFInfo
- Publication number
- CN202831182U CN202831182U CN 201220364922 CN201220364922U CN202831182U CN 202831182 U CN202831182 U CN 202831182U CN 201220364922 CN201220364922 CN 201220364922 CN 201220364922 U CN201220364922 U CN 201220364922U CN 202831182 U CN202831182 U CN 202831182U
- Authority
- CN
- China
- Prior art keywords
- protuberance
- well bore
- building block
- strengthening
- strengthens
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model discloses a component part of a well bore of an inspection well. The component part of the well bore of the inspection well is formed by integral injection molding, and comprises a main body part and steps. The main body part comprises upper ports, lower ports and a spherical side wall, wherein the spherical side wall is provided with first strengthening bulges, second strengthening bulges and strengthening ribs; the upper ports are provided with clamping bumps and clamping grooves; the first strengthening bulges are arranged on the inner side of the spherical side wall; the second strengthening bulges are arranged on the outer side of the spherical side wall; smooth transition is formed from the upper ports to the middle position of the main body part; the strengthening ribs are arranged at concave positions of the outer sides of the first strengthening bulges; and the lower ports are provided with butting bumps and butting grooves. The component part has the benefits that the height of the well bore of the inspection well can be adjusted; the service life of the component part of the well bore of the inspection well is prolonged; the universalization is improved; the construction is convenient; the sealability is good; and the oxidation corrosion resistance is good.
Description
Technical field
The utility model relates to a kind of municipal engineering with underground draining, blowdown manhole building block, particularly high, the easy construction of a kind of generalization, good airproof performance, the manhole well bore building block that the antioxidant anticorrosive performance is good, easy to use.
Background technology
The webmaster manhole mostly is brick concrete inspection well under the existing municipal engineering land used, and mainly there is following shortcoming in it:
At first, height can't arbitrarily be changed, and the user is only using fixing height, thus larger increase the difficulty of construction and can't guaranteeing of workmanship;
Secondly, intensity is low, and the support strength of brickwork construction is low, especially easily subsides because the horizontal active force of imbalance impacts near the brickwork construction reducing reducing part on road surface; Secondly well body construction cycle long, construction is complicated, and is high to the civil engineering requirement owing to must piling up at manual scene, standardization, generalization, seriation degree are poor, by hand and materials how much be the key factor that affects quality; Exist in addition and can not change, easily break and seepage and the defective such as pollute, need frequently maintenance.
Again; the ladder great majority that need to check pile up fixedly by brick concrete pit well bore that reinforcing bar forms, and ladder is become flexible, and understand crisis procurator's personal safety; then carry the ladder inspection of going into the well by the inspection personnel, cause workload to increase.
Summary of the invention
Technical problem to be solved in the utility model provides that a kind of generalization is high, easy construction, good airproof performance, antioxidant anticorrosive performance are good, be convenient to adjust the manhole well bore building block well bore height and that improve work safety, the defects that exists to overcome existing inspection shaft.
The technical scheme of the utility model technical solution problem is as follows: manhole well bore building block is formed by integrated injection molding, and it comprises main part and step.
Aforementioned body section comprises upper port, lower port and sphere sidewall; The upper port setting holds projection and holds groove, and holding projection and holding groove is that arrange the space; The sphere sidewall is provided with first and strengthens protuberance, the second reinforcement protuberance and ribs, first strengthens protuberance is arranged at sphere sidewall inwall, and the first convex surface of strengthening protuberance arranges towards the sphere interior, it comprises sector and reduces arcwall face, sector is concordant with the lower surface, reduces arcwall face towards extending to the upper surface and not to the upper end surface rounding off; Second strengthens protuberance is arranged at sphere sidewall outer wall, and the second convex surface of strengthening protuberance is towards sphere sidewall outer setting, and second strengthens the direction of protuberance from upper port to lower port arranges along the sphere sidewall; Ribs is arranged at the sector place in the first reinforcement protuberance outside, and extends towards upper port along the first concave surface of strengthening protuberance, and lower port arranges docking projection and docking recess.
Above-mentioned step is arranged at sphere sidewall inner surface wall and concordant with the upper port end face, and it comprises and is at least two U shape bodies and is combined to form side by side.
Its use is as follows: the upper port of a manhole well bore building block is docked with the upper port of another manhole well bore building block, wherein a manhole well bore building block hold projection and another manhole well bore building block hold that groove is supporting to be engaged, and then again will be wherein a manhole well bore building block hold groove and another manhole well bore building block hold that projection is supporting to be engaged, thereby above-mentioned two manhole well bore building blocks are combined, again the lower port of the 3rd manhole well bore building block is docked with the lower port of an above-mentioned manhole well bore building block, decide the number of assembling manhole well bore building block according to the height of construction requirement, thereby solve because of the out of use problem of differing heights.
Compared with prior art, the beneficial effects of the utility model are: can decide according to the height of construction requirement the number of assembling manhole well bore building block, thereby solve because of the out of use problem of differing heights; Strengthen protuberance towards the structure in the sphere sidewall outside by the first convex surface of strengthening protuberance towards sphere inside sidewalls and second simultaneously, strengthened the support strength of manhole well bore building block, thereby prolonged the application life of manhole well bore building block; Manhole well bore building block is formed by integrated injection molding, and generalization is improved, easy construction, good airproof performance, antioxidant anticorrosive performance are good.
Description of drawings
Fig. 1 is the top view of the manhole well bore building block of a better embodiment.
Fig. 2 is the enlarged drawing at A place among manhole well bore building block Fig. 1 of a better embodiment.
Fig. 3 is the front elevation drawing of the manhole well bore building block of a better embodiment.
Fig. 4 is the upward view of the manhole well bore building block of a better embodiment.
Fig. 5 is the enlarged drawing at B place among manhole well bore building block Fig. 4 of a better embodiment.
Among the figure: main part 1, step 2, upper port 3, hold projection 31, hold groove 32, lower port 4, docking projection 41, docking recess 42, sphere sidewall 5, first strengthen protuberance 51, second and strengthen protuberance 52, ribs 53, sector 54, reduces arcwall face 55.
The specific embodiment
By reference to the accompanying drawings, the utility model is described further, sees also Fig. 1, manhole well bore building block is formed by integrated injection molding, and it comprises main part 1 and step 2.
Consult Fig. 1, aforementioned body section 1 comprises upper port 3, lower port 4 and sphere sidewall 5; Consult Fig. 2, upper port 3 arranges and holds projection 31 and hold groove 32; In conjunction with Fig. 2 and Fig. 3, sphere sidewall 5 arranges first and strengthens protuberance 51, the second reinforcement protuberance 52 and ribs 53, first strengthens protuberance 51 is arranged at sphere sidewall 5 inwalls, and first strengthens the convex surface of protuberance 51 towards sphere sidewall 5 inner settings, it comprises sector 54 and reduces arcwall face 55, sector 54 is concordant with lower port 3 end faces, reduces arcwall face 55 towards extending to upper port and at rounding off to the sphere sidewall 5 at upper port place not; Second strengthens protuberance 52 is arranged at sphere sidewall 5 outer walls, and the second convex surface of strengthening protuberance 52 is towards sphere sidewall 5 outer setting, and second strengthens protuberance 52, and 4 direction arranges along sphere sidewall 5 from upper port 3 to lower port; Ribs 53 is arranged at first and strengthens sector 54 places in protuberance 51 outsides, and along the first concave surface of strengthening protuberance 51 towards upper port 3 extensions, consults Fig. 3 to Fig. 5, and lower port 4 arranges docking projection 41 and docking recess 42.
As preferentially, above-mentioned holding projection 31 and hold groove 32 is that arrange the space, holds projection 31 and is prismatoid, holds groove 32 and is the trapezoidal shape groove.
As preferentially, above-mentioned docking projection 41 and docking recess 42 are that arrange the space, connect projection 41 and are prismatoid, and docking recess 42 is the trapezoidal shape groove.
Above-mentioned step 2 is arranged at sphere sidewall 5 inner surface walls and concordant with upper port 3 end faces, and it comprises a plurality of U shape bodies and makes up side by side and be arranged at formation.
As preferentially, above-mentioned step 2 is made up side by side to be arranged at by three U shape bodies and forms.
Claims (6)
1. manhole well bore building block, it is characterized in that: manhole well bore building block is formed by integrated injection molding, and it comprises main part and step;
Aforementioned body section comprises upper port, lower port and sphere sidewall; The upper port setting holds projection and holds groove; The sphere sidewall is provided with first and strengthens protuberance, the second reinforcement protuberance and ribs, and first strengthens protuberance is arranged at sphere sidewall inwall, and the first convex surface of strengthening protuberance arranges towards the sphere interior; Second strengthens protuberance is arranged at sphere sidewall outer wall, and the second convex surface of strengthening protuberance is towards sphere sidewall outer setting, and second strengthens the direction of protuberance from upper port to lower port arranges along the sphere sidewall; Ribs is arranged at first and strengthens the protuberance outside, and extends towards upper port along the first concave surface of strengthening protuberance, and lower port arranges docking projection and docking recess;
Above-mentioned step is arranged at main part inwall and concordant with the upper port end face, and it comprises the U shape body that is at least two and is combined to form side by side.
2. manhole well bore building block according to claim 1 is characterized in that: above-mentioned holding projection and hold groove is that arrange the space, and holding projection is prismatoid, and holding groove is the trapezoidal shape groove.
3. manhole well bore building block according to claim 1 is characterized in that: above-mentioned docking projection and docking recess are that arrange the space, and connecing projection is prismatoid, and docking recess is the trapezoidal shape groove.
4. manhole well bore building block according to claim 1, it is characterized in that: above-mentioned step is made up side by side to be arranged at by three U shape bodies and forms.
5. manhole well bore building block according to claim 1, it is characterized in that: first strengthens protuberance comprises sector and reduces arcwall face, sector is concordant with the lower surface, reduces arcwall face towards extending to the upper surface and not to the upper end surface rounding off to the main part inner surface wall; Ribs is arranged at the sector place in the first reinforcement protuberance outside.
6. manhole well bore building block according to claim 1 is characterized in that: second strengthens protuberance extends to place, main part appearance wall centre position rounding off from upper port.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220364922 CN202831182U (en) | 2012-07-26 | 2012-07-26 | Component part of well bore of inspection well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220364922 CN202831182U (en) | 2012-07-26 | 2012-07-26 | Component part of well bore of inspection well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202831182U true CN202831182U (en) | 2013-03-27 |
Family
ID=47942926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220364922 Expired - Fee Related CN202831182U (en) | 2012-07-26 | 2012-07-26 | Component part of well bore of inspection well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202831182U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108952548A (en) * | 2017-05-17 | 2018-12-07 | 张柳世 | A kind of well formula ladder used for well formula cellar upper under people and well formula valve hole |
-
2012
- 2012-07-26 CN CN 201220364922 patent/CN202831182U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108952548A (en) * | 2017-05-17 | 2018-12-07 | 张柳世 | A kind of well formula ladder used for well formula cellar upper under people and well formula valve hole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121090A (en) | 3D prints the method for anchor connection reinforcing bar in filled wall | |
CN202831182U (en) | Component part of well bore of inspection well | |
CN201809961U (en) | Triangular diagonal bracing operation platform for elevator shaft | |
CN202831183U (en) | Component part of well bore of inspection well | |
CN103266627B (en) | Manhole | |
CN201593261U (en) | Wall body module | |
CN102767230B (en) | Manhole well bore building block | |
CN203654427U (en) | Inspection well | |
CN102767229A (en) | Constituent component of inspection well body | |
CN207144022U (en) | A kind of cross pile foundation reinforcement device | |
CN203429771U (en) | Manhole | |
CN203284876U (en) | Inspection well | |
CN213837066U (en) | Anti-seismic fabricated building structure | |
CN103015291B (en) | Oblique-angle two-way locking type sidewalk floor tile | |
CN203213149U (en) | Inspection well | |
CN203905483U (en) | Fixed keelson supporting template during structural arc construction | |
CN203429772U (en) | Manhole pedestal | |
CN203284802U (en) | Inspection well body | |
CN102168466A (en) | Hollow block used in construction | |
CN202925661U (en) | Inspection well base | |
CN203213153U (en) | Inspection well | |
CN203654426U (en) | Inspection well | |
CN203022029U (en) | Inspection well base | |
CN205223978U (en) | Stone masonry gravity dam | |
CN203022025U (en) | Inspection well component part |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130327 Termination date: 20150726 |
|
EXPY | Termination of patent right or utility model |