CN202047376U - Walking rail device for hanging basket forward shifting - Google Patents

Walking rail device for hanging basket forward shifting Download PDF

Info

Publication number
CN202047376U
CN202047376U CN201120139660XU CN201120139660U CN202047376U CN 202047376 U CN202047376 U CN 202047376U CN 201120139660X U CN201120139660X U CN 201120139660XU CN 201120139660 U CN201120139660 U CN 201120139660U CN 202047376 U CN202047376 U CN 202047376U
Authority
CN
China
Prior art keywords
track
hanging basket
rail
sleeper
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120139660XU
Other languages
Chinese (zh)
Inventor
王祥军
谢亮
张敏
章源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Wuxin Steel Formwork Co Ltd
Original Assignee
China Railway Wuxin Steel Formwork Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Wuxin Steel Formwork Co Ltd filed Critical China Railway Wuxin Steel Formwork Co Ltd
Priority to CN201120139660XU priority Critical patent/CN202047376U/en
Application granted granted Critical
Publication of CN202047376U publication Critical patent/CN202047376U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a hanging basket walking rail device for hanging basket forward shifting. The hanging basket walking rail device comprises a rail, a sleeper, a rail pressure beam and a connecting rod. The rail is formed by connecting two I-shaped steels and connection beam through bolts, the sleeper is arranged below the rail, the rail pressure beam is arranged above the rail, the lower end of a finish rolling threaded steel is connected with a vertical tensioning prestressed reinforcing steel through a connector, the upper end is connected with the rail pressure beam through the bolts, and the rail is anchored on the surface of a box beam. With the adoption of the hanging basket walking rail device for hanging basket forward shifting, the forward shift of a hanging basket is convenient, smooth and safe.

Description

Hanging Basket reach walking rails device
Technical field
The utility model relates to a kind of rail set that is used for Hanging Basket reach traveling.
Background technology
In the present stage engineering construction, prestressed concrete continuous beam bridge cantilever pouring worker method commonly used is constructed, and Hanging Basket to be this worker's method construct necessary a kind of equipment.The continuous girder bridge of employing cast-in-place cantilever method is whenever striden and is divided into some joint pieces, and Hanging Basket need move forward behind the joint piece on having built, for next building of piece of joint is prepared.In the process that Hanging Basket moves forward because the construction safety accident that the problem of Hanging Basket track causes happens occasionally, therefore in the Hanging Basket reach process whether steadily, the structure of its walking rails device whether safety, reliably be directly connected to the safe in utilization of whole Hanging Basket, how to make safer in the reach process, the convenient problem that needs emphasis to solve in the Hanging Basket design that becomes of Hanging Basket.
Summary of the invention
The utility model provides a kind of can make more convenient, steady, the safe suspended basket rail set of Hanging Basket reach.
This Hanging Basket reach walking rails device of the present utility model, comprise track, sleeper, track pressure beam and connecting rod, described track is connected to form by bolt by two i iron at some contact beams and its two ends, sleeper is placed on the track below, track presses beam to be placed on the track top, the connecting rod lower end links together by connector and threaded vertical tensioned prestressing bar, and the upper end then presses beam to be connected by bolt and track, and track is anchored on the case beam surface.
Described sleeper adopts shaped steel processing.Described connecting rod adopts fining twisted steel.
The beneficial effects of the utility model are as follows:
Above-mentioned track is to be connected to form by the contact beam by two i iron, and processing is simple, and seam is few, makes Hanging Basket more steady in the traveling process.
Above-mentioned track has solved the problem of the vertical tensioned prestressing bar interference of track and case beam by the sleeper bed hedgehopping.
Above-mentioned track pressure beam is anchored at track on the case beam surface by fining twisted steel and connector, is not subjected to the influence of prestressed reinforcement embedding precision, reduces the requirement to construction, and is square in orbit because of the anchoring nut simultaneously, tightens anchoring conveniently.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Anchoring status schematic diagram when Fig. 2 uses for the utility model.
The specific embodiment
As shown in Figure 1, this Hanging Basket reach of the utility model walking rails device, mainly comprise track 1, sleeper 2, track pressure beam 3 and connecting rod 5, above-mentioned track 1 is connected to form by bolt by two i iron at some contact beams and its two ends, sleeper 2 is placed on track 1 below, track presses beam 3 to be placed on track 1 top, connecting rod 5 lower ends link together by connector 4 and screwed vertical tensioned prestressing bar, the upper end then presses beam 3 to be connected by bolt and track, and track 1 is anchored on the case beam surface.Above-mentioned sleeper 2 adopts shaped steel processing, is used to avoid the interference problem of track and the vertical tensioned prestressing bar of case beam.Above-mentioned connecting rod 5 adopts fining twisted steel.
When specifically constructing, after the beam section is built and is finished, the front fulcrum of jack-up Hanging Basket, pine removes the bolt that track is pressed beam 3, presses beam 3, connector 4, connecting rod 5 to take off successively on track, and track 1 moves forward freely at this moment.After track 1 being drawn to the assigned address of next beam section, connecting rod 5 lower ends are connected by connector 4 with the vertical tensioned prestressing bar of case beam, and the upper end is then passed track and pressed beam 3 and press beam 3 to be fixed on the track 1 on track with bolt.At this moment, whole rail reach and anchoring finish, and wait for the reach of Hanging Basket rod member part.

Claims (3)

1. Hanging Basket reach walking rails device, it is characterized in that this rail set comprises track (1), sleeper (2), track is pressed beam (3) and connecting rod (5), described track (1) is connected to form with bolt by two i iron at some contact beams and its two ends, sleeper (2) is placed on track (1) below, track presses beam (3) to be placed on track (1) top, connecting rod (5) lower end links together by connector (4) and threaded vertical tensioned prestressing bar, the upper end then presses beam (3) to be connected by bolt and track, and track (1) is anchored on the case beam surface.
2. Hanging Basket reach walking rails device according to claim 1 is characterized in that described sleeper (2) adopts shaped steel processing.
3. Hanging Basket reach walking rails device according to claim 1 and 2 is characterized in that described connecting rod (5) adopts fining twisted steel.
CN201120139660XU 2011-05-05 2011-05-05 Walking rail device for hanging basket forward shifting Expired - Fee Related CN202047376U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120139660XU CN202047376U (en) 2011-05-05 2011-05-05 Walking rail device for hanging basket forward shifting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120139660XU CN202047376U (en) 2011-05-05 2011-05-05 Walking rail device for hanging basket forward shifting

Publications (1)

Publication Number Publication Date
CN202047376U true CN202047376U (en) 2011-11-23

Family

ID=44987690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120139660XU Expired - Fee Related CN202047376U (en) 2011-05-05 2011-05-05 Walking rail device for hanging basket forward shifting

Country Status (1)

Country Link
CN (1) CN202047376U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804385A (en) * 2016-04-15 2016-07-27 中铁五局集团有限公司 Hollow type walking track structure for hanging basket
CN106592445A (en) * 2016-11-23 2017-04-26 中铁五局集团有限公司 Full-automatic hydraulic traction walking system for hanging basket of cantilever casting continuous beam
CN111042004A (en) * 2019-12-06 2020-04-21 中铁广州工程局集团有限公司 Hanging basket track beam traveling method
CN111188284A (en) * 2020-01-08 2020-05-22 中铁十六局集团路桥工程有限公司 Anchoring method for hanging basket in cantilever construction
CN113089502A (en) * 2021-04-19 2021-07-09 山东博远重工有限公司 Hang basket construction and use track anchor

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804385A (en) * 2016-04-15 2016-07-27 中铁五局集团有限公司 Hollow type walking track structure for hanging basket
CN106592445A (en) * 2016-11-23 2017-04-26 中铁五局集团有限公司 Full-automatic hydraulic traction walking system for hanging basket of cantilever casting continuous beam
CN111042004A (en) * 2019-12-06 2020-04-21 中铁广州工程局集团有限公司 Hanging basket track beam traveling method
CN111188284A (en) * 2020-01-08 2020-05-22 中铁十六局集团路桥工程有限公司 Anchoring method for hanging basket in cantilever construction
CN111188284B (en) * 2020-01-08 2021-07-16 中铁十六局集团路桥工程有限公司 Anchoring method for hanging basket in cantilever construction
CN113089502A (en) * 2021-04-19 2021-07-09 山东博远重工有限公司 Hang basket construction and use track anchor

Similar Documents

Publication Publication Date Title
CN202047376U (en) Walking rail device for hanging basket forward shifting
CN101220580B (en) Portrait multi-point continuously dragging construction method for trussed steel beam
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN202139833U (en) Cantilever scaffold for building construction
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN201512345U (en) Multifunctional integrated lifting frame
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN103911957A (en) Prestressed continuous box-girder cantilever construction basket
CN206736731U (en) Bridge construction bracket
CN201506952U (en) Temporary cable matched hanging basket building concrete cable stayed bridge without supporting frame
CN205999802U (en) A kind of continuous bridge zero number section, the new prepressing device of Cast-in-place Segment Support
CN203559354U (en) Stay cable anchoring structure applied to prestressed concrete partially cable-stayed bridge
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN205242238U (en) Be applied to self anchored suspension bridge's main girder structure
CN103306495B (en) Wooden construction truncated cylinder reinforced construction method
CN205630974U (en) Pre -tensioning system precast beam pedestal
CN202433253U (en) Auxiliary device for pull-out test of hooked anchors
CN205636521U (en) Basket is hung in construction of truss -like cantilever
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
KR101356675B1 (en) Structural girder using a loading anchor system for girder
CN201526006U (en) Prestressed concrete continuous box girder
CN203834366U (en) Energy-saving universal hanging basket for bridge construction
CN205557288U (en) U -shaped prestressed structure of concrete box beam web and bottom plate
CN102003070A (en) Construction method of suspending scaffold
CN205153212U (en) Steel pipe concrete shear force wall and building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123

Termination date: 20160505