CN202039606U - Concrete pump pipe fixing structure of super high rise building construction - Google Patents
Concrete pump pipe fixing structure of super high rise building construction Download PDFInfo
- Publication number
- CN202039606U CN202039606U CN2011201371458U CN201120137145U CN202039606U CN 202039606 U CN202039606 U CN 202039606U CN 2011201371458 U CN2011201371458 U CN 2011201371458U CN 201120137145 U CN201120137145 U CN 201120137145U CN 202039606 U CN202039606 U CN 202039606U
- Authority
- CN
- China
- Prior art keywords
- concrete pump
- building construction
- body frame
- super high
- pump pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The utility model discloses a concrete pump pipe fixing structure of super high rise building construction, which comprises a main frame which is in a rectangle shape and arranged horizontally. One end of the main frame is fixedly connected with a building, and the other end of the main frame is provided with a square frame. Pump pipes are sleeved inside the square frame and fixed on the square frame through hoops. Supporting legs are slantly connected with two lateral sides of the main frame, and the tail ends of the supporting legs are fixedly connected with the building. The concrete pump pipe fixing structure of the super high rise building construction has the advantages that by means of the main point development of the patent, the concrete pump pipes in the super high rise building construction can be fixedly safely and effectively, safe operation and management of the concrete pumping in the super high rise building construction can be ensured, and safe management level and overall efficiency of the super high rise building construction are improved. The concrete pump pipe fixing structure of the super high rise building construction is firm and reliable in method, economic, practical, flexible and convenient, can be recycled in a plurality of projects and convenient to popularize and apply widely in building construction enterprises.
Description
Technical field
The utility model relates to a kind of concrete pump pipe fixation structure, more specifically says, it relates to a kind of construction of super highrise building concrete pump pipe fixation structure.
Background technology
At present construction of super highrise building concrete pump line is fixing all is to adopt steelframe and the scaffold material as the fixed pump pipe holder by rule of thumb, in construction of super highrise building, the construction of core tube vertical structure is constructed prior to horizontal structure, can only bear by the vertical structure of finishing of constructing the fixing of concrete pump line, give vertical structure by the special delivery of pump line fixed mount the power that produces in the transmission and concrete transmission.Present construction of super highrise building is fixed by rule of thumb pump line, in the transmission and concrete transmission process because all multifactor uncertainties, have bigger security risk, construction enterprises do not form the fixing systems approach of concrete pump line, have bigger potential safety hazard in the construction of superelevation layer concrete.
Summary of the invention
The purpose of this utility model is to overcome deficiency of the prior art, provides a kind of rational in infrastructure, and cost is low, and safety and firmness effectively reduces the construction of super highrise building concrete pump pipe fixation structure of security risk.
This construction of super highrise building concrete pump pipe fixation structure, the body frame that comprises rectangular horizontal positioned, one end of body frame is fixedlyed connected with building, the other end of body frame is provided with square frame, be arranged with pump line in the square frame, pump line is fixed on the square frame by hoop, each oblique supporting leg that is connected with of the dual-side of body frame, and the end of described supporting leg is fixedlyed connected with building.
As preferably: described hoop and square frame are fixed by double nut.
As preferably: assisting between described hoop and pump line has rubber for tire.
As preferably: described midleg also is provided with lacing and is connected with body frame.
As preferably: the end that described body frame is fixedlyed connected with building is provided with the body frame steel plate, and the body frame steel plate is fixedlyed connected with building by split bolt.
As preferably: the end that described supporting leg is fixedlyed connected with building is provided with the supporting leg steel plate, and the supporting leg steel plate is fixedlyed connected with building by split bolt.
The beneficial effects of the utility model are: by above patent main points exploitation, can realize in the construction of super highrise building concrete pump line being carried out safe and effective fixing, guarantee the safe operation and the management of construction of super highrise building concrete pumping, improve the safety management level and the comprehensive benefit of construction of super highrise building.This construction of super highrise building concrete pump pipe fixing method is solid and reliable, economic and practical, flexible, can have enough to meet the need use in a plurality of engineerings, is convenient to enterprise in charge of construction and applies widely.
Description of drawings
Fig. 1 is the utility model master TV structure schematic diagram;
Fig. 2 is the utility model plan structure schematic diagram;
Fig. 3 is the utility model left side TV structure schematic diagram;
Reference numeral: body frame 1; Supporting leg 2; Lacing 3; Pump line 4; Hoop 5; Body frame steel plate 6; Supporting leg steel plate 7; Split bolt 8; Double nut 9; Square frame 10.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is described further.Though the utility model will be described in conjunction with preferred embodiment, should know, do not represent that the utility model is limited among the described embodiment.On the contrary, the utility model will be contained alternative, modified and the equivalent in the scope of the present utility model that can be included in attached claims qualification.
Extremely shown in Figure 3 referring to Fig. 1, construction of super highrise building concrete pump pipe fixation structure of the present utility model, the body frame 1 that comprises rectangular horizontal positioned, one end of body frame 1 is fixedlyed connected with building, the other end of body frame 1 is provided with square frame 10, is arranged with pump line 4 in the square frame 10, and pump line 4 is fixed on the square frame 10 by hoop 5, each oblique supporting leg 2 that is connected with of the dual-side of body frame 1, the end of described supporting leg 2 is fixedlyed connected with building.Described hoop 5 is fixing by double nut 9 with square frame 10.4 of described hoop 5 and pump lines are assisted rubber for tire are arranged.Described supporting leg 2 middle parts also are provided with lacing 3 and are connected with body frame 1.The end that described body frame 1 is fixedlyed connected with building is provided with body frame steel plate 6, and body frame steel plate 6 is fixedlyed connected with building by split bolt 8.The end that described supporting leg 2 is fixedlyed connected with building is provided with supporting leg steel plate 7, and supporting leg steel plate 7 is fixedlyed connected with building by split bolt 8.
Size according to the concrete pump line, the equal leg angle of employing 80 * 80 is welded as the long 1240mm that is, wide is the body frame 1 of 350mm, 80 * 80 equal leg angle and body frame 1 welding are adopted in body frame 1 one end tops and middle part, mill the bolt hole of Ф 14 apart from end 138mm, 303mm, 438mm, 603mm place, adopt external application double nuts 9 in the hoop 5 of Ф 12,5 of pump line 4 and hoops assist rubber for tire to carry out pump line 4 to fix.Equal leg angle apart from 520mm place, body frame 1 end employing 80 * 80 becomes 27 degree welding support supporting legs 2 with two side skeletons, length is 994mm, the supporting leg steel plate 7 of the thick 200mm * 240mm of supporting leg 2 ends welding 10mm, supporting leg steel plate 7 mills 4 bolts hole of Ф 22, supporting leg 2 welds 50 * 50 equal leg angle lacing 3 with body frame 1, the body frame steel plate 6 of the thick 200mm * 500mm of body frame 1 end welding 10mm, body frame steel plate 6 mills 6 bolts hole of Ф 22, and body frame steel plate 6 adopts the split bolt 8 of Ф 20 to fixedly connected with the building structure vertical member.
Claims (6)
1. construction of super highrise building concrete pump pipe fixation structure, it is characterized in that: the body frame (1) that comprises rectangular horizontal positioned, one end of body frame (1) is fixedlyed connected with building, the other end of body frame (1) is provided with square frame (10), be arranged with pump line (4) in the square frame (10), pump line (4) is fixed on the square frame (10) by hoop (5), each oblique supporting leg (2) that is connected with of the dual-side of body frame (1), and the end of described supporting leg (2) is fixedlyed connected with building.
2. construction of super highrise building concrete pump pipe fixation structure according to claim 1 is characterized in that: described hoop (5) is fixing by double nut (9) with square frame (10).
3. construction of super highrise building concrete pump pipe fixation structure according to claim 1 is characterized in that: assisting between described hoop (5) and pump line (4) has rubber for tire.
4. construction of super highrise building concrete pump pipe fixation structure according to claim 1 is characterized in that: described supporting leg (2) middle part also is provided with lacing (3) and is connected with body frame (1).
5. construction of super highrise building concrete pump pipe fixation structure according to claim 1, it is characterized in that: the end that described body frame (1) is fixedlyed connected with building is provided with body frame steel plate (6), and body frame steel plate (6) is fixedlyed connected with building by split bolt (8).
6. construction of super highrise building concrete pump pipe fixation structure according to claim 1, it is characterized in that: the end that described supporting leg (2) is fixedlyed connected with building is provided with supporting leg steel plate (7), and supporting leg steel plate (7) is fixedlyed connected with building by split bolt (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201371458U CN202039606U (en) | 2011-04-27 | 2011-04-27 | Concrete pump pipe fixing structure of super high rise building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201371458U CN202039606U (en) | 2011-04-27 | 2011-04-27 | Concrete pump pipe fixing structure of super high rise building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202039606U true CN202039606U (en) | 2011-11-16 |
Family
ID=44967055
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201371458U Expired - Fee Related CN202039606U (en) | 2011-04-27 | 2011-04-27 | Concrete pump pipe fixing structure of super high rise building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202039606U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102277968A (en) * | 2011-04-27 | 2011-12-14 | 中天建设集团有限公司 | Concrete pump pipe fixing structure for ultra-high rise building construction |
CN103541551A (en) * | 2012-07-11 | 2014-01-29 | 上海建工五建集团有限公司 | Construction structure suitable for super high-rise concrete-filled steel tubes and side throwing vibration-free method |
CN105387279A (en) * | 2015-12-01 | 2016-03-09 | 上海建工一建集团有限公司 | Pipeline wall-attaching fixing device and method |
CN108868146A (en) * | 2018-07-04 | 2018-11-23 | 上海建工七建集团有限公司 | A kind of vertical pump line room external fixer of concrete and construction method |
-
2011
- 2011-04-27 CN CN2011201371458U patent/CN202039606U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102277968A (en) * | 2011-04-27 | 2011-12-14 | 中天建设集团有限公司 | Concrete pump pipe fixing structure for ultra-high rise building construction |
CN103541551A (en) * | 2012-07-11 | 2014-01-29 | 上海建工五建集团有限公司 | Construction structure suitable for super high-rise concrete-filled steel tubes and side throwing vibration-free method |
CN103541551B (en) * | 2012-07-11 | 2015-06-24 | 上海建工五建集团有限公司 | Construction structure suitable for super high-rise concrete-filled steel tubes and side throwing vibration-free method |
CN105387279A (en) * | 2015-12-01 | 2016-03-09 | 上海建工一建集团有限公司 | Pipeline wall-attaching fixing device and method |
CN108868146A (en) * | 2018-07-04 | 2018-11-23 | 上海建工七建集团有限公司 | A kind of vertical pump line room external fixer of concrete and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103075020B (en) | A kind of steel tray supports actuating system | |
CN202039606U (en) | Concrete pump pipe fixing structure of super high rise building construction | |
CN204098918U (en) | Dimensional parameters multiple degrees of freedom is adjustable uses shield launching bracket repeatedly | |
CN202954557U (en) | Scaffold wall connection part | |
CN102277968A (en) | Concrete pump pipe fixing structure for ultra-high rise building construction | |
CN103953061B (en) | A kind of offshore wind farm jacket frame foundation structure | |
CN202936996U (en) | Wall connecting piece for scaffold | |
CN204728217U (en) | Positioning plate device for assembling steel box girder segments | |
CN204024084U (en) | Easy unloading type triangular pipe truss just spells moulding bed | |
CN204040494U (en) | The assembled moulding bed of easy unloading type triangular pipe truss | |
CN203907010U (en) | Flexible connection device for pipe jacking construction in soft soil layer | |
CN203830937U (en) | Auxiliary device for butt welding of sectional materials | |
CN103362315B (en) | Hanger for integral hoisting of pipeline and construction method thereof | |
CN203420269U (en) | prestress connecting piece for building foundation pit support | |
CN203920973U (en) | A kind of Multi-functional transporting chassis for large-scale penstock installation in tunnel | |
CN203878779U (en) | Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint | |
CN203905008U (en) | Diagonal brace supporting structure for superior angle of foundation pit | |
CN203330611U (en) | Adjustable pipeline assembly welding bracket | |
CN204038986U (en) | For removing the fork truck of inner support steel pipe | |
CN203475867U (en) | Lattice type supporting system | |
CN203284886U (en) | Connection node structure of rectangular steel pipe column and I-shaped steel beam | |
CN202745061U (en) | Inner supporting connection piece capable of varying size and force transmission direction and used for protecting foundation pit | |
CN203160729U (en) | Steel pallet supporting power transmission system | |
CN206220472U (en) | A kind of bracing means for improving bracing members stability of strutting system | |
CN205001658U (en) | Modular heating power pipeline support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111116 Termination date: 20120427 |