CN102277968A - Concrete pump pipe fixing structure for ultra-high rise building construction - Google Patents
Concrete pump pipe fixing structure for ultra-high rise building construction Download PDFInfo
- Publication number
- CN102277968A CN102277968A CN2011101133026A CN201110113302A CN102277968A CN 102277968 A CN102277968 A CN 102277968A CN 2011101133026 A CN2011101133026 A CN 2011101133026A CN 201110113302 A CN201110113302 A CN 201110113302A CN 102277968 A CN102277968 A CN 102277968A
- Authority
- CN
- China
- Prior art keywords
- body frame
- pump pipe
- concrete pump
- building construction
- ultra
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The invention discloses a concrete pump pipe fixing structure for ultra-high rise building construction, which comprises a horizontally-arranged rectangular body frame, wherein one end of the body frame is fixedly connected with a building, the other end of the body frame is provided with a square frame, a pump pipe is sleeved in the square frame and fixed on the square frame through a hoop, support legs are respectively aslant connected to two sides of the body frame, and tail ends of the support legs are fixedly connected with the building. The invention has the advantages of being capable of realizing safe and effective fixation of the concrete pump pipe during the ultra-high rise building construction, ensuring safe operation and management of concrete pumping during the ultra-high rise building construction, and improving safe management level and comprehensive benefits of the ultra-high rise building construction from the main points of the concrete pump pipe fixing structure. The concrete pump pipe fixing structure for the ultra-high rise building construction has the advantages of firmness, reliability, low cost and applicability, flexibility and convenience, can be repeatedly used in a plurality of projects and is convenient for wide popularization and application in building construction enterprises.
Description
Technical field
The present invention relates to a kind of concrete pump pipe fixation structure, more specifically say, it relates to a kind of construction of super highrise building concrete pump pipe fixation structure.
Background technology
At present construction of super highrise building concrete pump line is fixing all is to adopt steelframe and the scaffold material as the fixed pump pipe holder by rule of thumb, in construction of super highrise building, the construction of core tube vertical structure is constructed prior to horizontal structure, can only bear by the vertical structure of finishing of constructing the fixing of concrete pump line, give vertical structure by the special delivery of pump line fixed mount the power that produces in the transmission and concrete transmission.Present construction of super highrise building is fixed by rule of thumb pump line, in the transmission and concrete transmission process because all multifactor uncertainties, have bigger security risk, construction enterprises do not form the fixing systems approach of concrete pump line, have bigger potential safety hazard in the construction of superelevation layer concrete.
Summary of the invention
The objective of the invention is to overcome deficiency of the prior art, provide a kind of rational in infrastructure, cost is low, and safety and firmness effectively reduces the construction of super highrise building concrete pump pipe fixation structure of security risk.
This construction of super highrise building concrete pump pipe fixation structure, the body frame that comprises rectangular horizontal positioned, one end of body frame is fixedlyed connected with building, the other end of body frame is provided with square frame, be arranged with pump line in the square frame, pump line is fixed on the square frame by hoop, each oblique supporting leg that is connected with of the dual-side of body frame, and the end of described supporting leg is fixedlyed connected with building.
As preferably: described hoop and square frame are fixed by double nut.
As preferably: assisting between described hoop and pump line has rubber for tire.
As preferably: described midleg also is provided with lacing and is connected with body frame.
As preferably: the end that described body frame is fixedlyed connected with building is provided with the body frame steel plate, and the body frame steel plate is fixedlyed connected with building by split bolt.
As preferably: the end that described supporting leg is fixedlyed connected with building is provided with the supporting leg steel plate, and the supporting leg steel plate is fixedlyed connected with building by split bolt.
The invention has the beneficial effects as follows: by above patent main points exploitation, can realize in the construction of super highrise building concrete pump line being carried out safe and effective fixing, guarantee the safe operation and the management of construction of super highrise building concrete pumping, improve the safety management level and the comprehensive benefit of construction of super highrise building.This construction of super highrise building concrete pump pipe fixing method is solid and reliable, economic and practical, flexible, can have enough to meet the need use in a plurality of engineerings, is convenient to enterprise in charge of construction and applies widely.
Description of drawings
Fig. 1 is master's TV structure schematic diagram of the present invention;
Fig. 2 is a plan structure schematic diagram of the present invention;
Fig. 3 is the present invention left side TV structure schematic diagram;
Reference numeral: body frame 1; Supporting leg 2; Lacing 3; Pump line 4; Hoop 5; Body frame steel plate 6; Supporting leg steel plate 7; Split bolt 8; Double nut 9; Square frame 10.
The specific embodiment
Below in conjunction with drawings and Examples the present invention is described further.Though the present invention will be described in conjunction with preferred embodiment, should know, do not represent to limit the invention among the described embodiment.On the contrary, the present invention will be contained alternative, modified and the equivalent in the scope of the present invention that can be included in attached claims qualification.
Extremely shown in Figure 3 referring to Fig. 1, construction of super highrise building concrete pump pipe fixation structure of the present invention, the body frame 1 that comprises rectangular horizontal positioned, one end of body frame 1 is fixedlyed connected with building, the other end of body frame 1 is provided with square frame 10, is arranged with pump line 4 in the square frame 10, and pump line 4 is fixed on the square frame 10 by hoop 5, each oblique supporting leg 2 that is connected with of the dual-side of body frame 1, the end of described supporting leg 2 is fixedlyed connected with building.Described hoop 5 is fixing by double nut 9 with square frame 10.4 of described hoop 5 and pump lines are assisted rubber for tire are arranged.Described supporting leg 2 middle parts also are provided with lacing 3 and are connected with body frame 1.The end that described body frame 1 is fixedlyed connected with building is provided with body frame steel plate 6, and body frame steel plate 6 is fixedlyed connected with building by split bolt 8.The end that described supporting leg 2 is fixedlyed connected with building is provided with supporting leg steel plate 7, and supporting leg steel plate 7 is fixedlyed connected with building by split bolt 8.
Size according to the concrete pump line, the equal leg angle of employing 80 * 80 is welded as the long 1240mm that is, wide is the body frame 1 of 350mm, 80 * 80 equal leg angle and body frame 1 welding are adopted in body frame 1 one end tops and middle part, mill the bolt hole of Φ 14 apart from end 138mm, 303mm, 438mm, 603mm place, adopt external application double nuts 9 in the hoop 5 of Φ 12,5 of pump line 4 and hoops assist rubber for tire to carry out pump line 4 to fix.Equal leg angle apart from 520mm place, body frame 1 end employing 80 * 80 becomes 27 degree welding support supporting legs 2 with two side skeletons, length is 994mm, the supporting leg steel plate 7 of the thick 200mm * 240mm of supporting leg 2 ends welding 10mm, supporting leg steel plate 7 mills 4 bolts hole of Φ 22, supporting leg 2 welds 50 * 50 equal leg angle lacing 3 with body frame 1, the body frame steel plate 6 of the thick 200mm * 500mm of body frame 1 end welding 10mm, body frame steel plate 6 mills 6 bolts hole of Φ 22, and body frame steel plate 6 adopts the split bolt 8 of Φ 20 to fixedly connected with the building structure vertical member.
Claims (6)
1. construction of super highrise building concrete pump pipe fixation structure, it is characterized in that: the body frame (1) that comprises rectangular horizontal positioned, one end of body frame (1) is fixedlyed connected with building, the other end of body frame (1) is provided with square frame (10), be arranged with pump line (4) in the square frame (10), pump line (4) is fixed on the square frame (10) by hoop (5), each oblique supporting leg (2) that is connected with of the dual-side of body frame (1), and the end of described supporting leg (2) is fixedlyed connected with building.
2. construction of super highrise building concrete pump pipe fixation structure according to claim 1 is characterized in that: described hoop (5) is fixing by double nut (9) with square frame (10).
3. construction of super highrise building concrete pump pipe fixation structure according to claim 1 is characterized in that: assisting between described hoop (5) and pump line (4) has rubber for tire.
4. construction of super highrise building concrete pump pipe fixation structure according to claim 1 is characterized in that: described supporting leg (2) middle part also is provided with lacing (3) and is connected with body frame (1).
5. construction of super highrise building concrete pump pipe fixation structure according to claim 1, it is characterized in that: the end that described body frame (1) is fixedlyed connected with building is provided with body frame steel plate (6), and body frame steel plate (6) is fixedlyed connected with building by split bolt (8).
6. construction of super highrise building concrete pump pipe fixation structure according to claim 1, it is characterized in that: the end that described supporting leg (2) is fixedlyed connected with building is provided with supporting leg steel plate (7), and supporting leg steel plate (7) is fixedlyed connected with building by split bolt (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101133026A CN102277968A (en) | 2011-04-27 | 2011-04-27 | Concrete pump pipe fixing structure for ultra-high rise building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101133026A CN102277968A (en) | 2011-04-27 | 2011-04-27 | Concrete pump pipe fixing structure for ultra-high rise building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102277968A true CN102277968A (en) | 2011-12-14 |
Family
ID=45103665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011101133026A Pending CN102277968A (en) | 2011-04-27 | 2011-04-27 | Concrete pump pipe fixing structure for ultra-high rise building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102277968A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541551A (en) * | 2012-07-11 | 2014-01-29 | 上海建工五建集团有限公司 | Construction structure suitable for super high-rise concrete-filled steel tubes and side throwing vibration-free method |
CN103628685A (en) * | 2013-12-12 | 2014-03-12 | 深圳市鹏城建筑集团有限公司 | Method for preventing concrete lateral displacement of concrete pump pipe and concrete pump pipe strengthening device |
CN106353031A (en) * | 2016-08-26 | 2017-01-25 | 北京建工新型建材有限责任公司 | Horizontal coil system and method for monitoring super high-rise pumping pressure of large flowing concrete |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201344316Y (en) * | 2008-12-17 | 2009-11-11 | 李奇超 | Supporting fixing device of pipeline system |
CN201358588Y (en) * | 2008-12-30 | 2009-12-09 | 三一重工股份有限公司 | Concrete transportation pipe fixing device capable of absorbing shock and reducing noise |
CN201568641U (en) * | 2010-01-04 | 2010-09-01 | 山东电力研究院 | Apparatus for limiting horizontal pipe displacement |
CN201606575U (en) * | 2009-12-30 | 2010-10-13 | 中建一局集团第二建筑有限公司 | Copper pipe bearing support for super high-rise building |
CN201795174U (en) * | 2010-07-30 | 2011-04-13 | 北京城建设计研究总院有限责任公司 | Fixing support for erecting and laying ductile iron pipes |
CN202039606U (en) * | 2011-04-27 | 2011-11-16 | 中天建设集团有限公司 | Concrete pump pipe fixing structure of super high rise building construction |
-
2011
- 2011-04-27 CN CN2011101133026A patent/CN102277968A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201344316Y (en) * | 2008-12-17 | 2009-11-11 | 李奇超 | Supporting fixing device of pipeline system |
CN201358588Y (en) * | 2008-12-30 | 2009-12-09 | 三一重工股份有限公司 | Concrete transportation pipe fixing device capable of absorbing shock and reducing noise |
CN201606575U (en) * | 2009-12-30 | 2010-10-13 | 中建一局集团第二建筑有限公司 | Copper pipe bearing support for super high-rise building |
CN201568641U (en) * | 2010-01-04 | 2010-09-01 | 山东电力研究院 | Apparatus for limiting horizontal pipe displacement |
CN201795174U (en) * | 2010-07-30 | 2011-04-13 | 北京城建设计研究总院有限责任公司 | Fixing support for erecting and laying ductile iron pipes |
CN202039606U (en) * | 2011-04-27 | 2011-11-16 | 中天建设集团有限公司 | Concrete pump pipe fixing structure of super high rise building construction |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103541551A (en) * | 2012-07-11 | 2014-01-29 | 上海建工五建集团有限公司 | Construction structure suitable for super high-rise concrete-filled steel tubes and side throwing vibration-free method |
CN103541551B (en) * | 2012-07-11 | 2015-06-24 | 上海建工五建集团有限公司 | Construction structure suitable for super high-rise concrete-filled steel tubes and side throwing vibration-free method |
CN103628685A (en) * | 2013-12-12 | 2014-03-12 | 深圳市鹏城建筑集团有限公司 | Method for preventing concrete lateral displacement of concrete pump pipe and concrete pump pipe strengthening device |
CN103628685B (en) * | 2013-12-12 | 2015-11-18 | 深圳市鹏城建筑集团有限公司 | A kind of method and concrete pump pipe bracing means preventing concrete pump pipe lateral displacement |
CN106353031A (en) * | 2016-08-26 | 2017-01-25 | 北京建工新型建材有限责任公司 | Horizontal coil system and method for monitoring super high-rise pumping pressure of large flowing concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103075020B (en) | A kind of steel tray supports actuating system | |
CN204098918U (en) | Dimensional parameters multiple degrees of freedom is adjustable uses shield launching bracket repeatedly | |
CN202039606U (en) | Concrete pump pipe fixing structure of super high rise building construction | |
CN105484514A (en) | Method for strengthening circular reinforced concrete pier column | |
CN102277968A (en) | Concrete pump pipe fixing structure for ultra-high rise building construction | |
CN202954557U (en) | Scaffold wall connection part | |
CN205207907U (en) | Novel pipeline bracket of tape base plinth | |
CN206738723U (en) | A kind of U-shaped hydraulic pipeline support | |
CN202936996U (en) | Wall connecting piece for scaffold | |
CN101881029A (en) | Detachable tower foundation | |
CN204024084U (en) | Easy unloading type triangular pipe truss just spells moulding bed | |
CN204552111U (en) | Material distributing machine | |
CN203907010U (en) | Flexible connection device for pipe jacking construction in soft soil layer | |
CN204040494U (en) | The assembled moulding bed of easy unloading type triangular pipe truss | |
CN206015628U (en) | Combination type for pressure penstock installation in hole is unloaded arc bracket assembly from jacking | |
CN202248255U (en) | Inclined single-end steel support | |
CN202577162U (en) | Combined-type steel pipe bracket | |
CN105569368A (en) | Annular steel plate strengthening device for reinforced concrete column with circular cross section | |
CN205575471U (en) | Reducing jar body hoisting device on power station desulfurization absorption tower | |
CN204728149U (en) | Be applicable to the quick lap joint track of geological hazard control engineering rolling topography | |
CN203878779U (en) | Rectangular concrete-filled steel tube column and I-steel beam rebar penetrating type joint | |
CN203475867U (en) | Lattice type supporting system | |
CN203411908U (en) | Temporary tensioned prestress anchoring device | |
CN207582985U (en) | A kind of fixing bracket for transporting prefabricated panel | |
CN206397109U (en) | The connecting elements of external scaffolding wall connecting rod part and shear wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20111214 |