CN202039511U - Hidden water guide system for hyperbolic daylighting roofs - Google Patents

Hidden water guide system for hyperbolic daylighting roofs Download PDF

Info

Publication number
CN202039511U
CN202039511U CN 201120034534 CN201120034534U CN202039511U CN 202039511 U CN202039511 U CN 202039511U CN 201120034534 CN201120034534 CN 201120034534 CN 201120034534 U CN201120034534 U CN 201120034534U CN 202039511 U CN202039511 U CN 202039511U
Authority
CN
China
Prior art keywords
guiding gutter
horizontal
guiding
gutter
hyperbolic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120034534
Other languages
Chinese (zh)
Inventor
王世明
马福宪
黄京新
杨春林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Engineering Group Co Ltd
Original Assignee
China Railway Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Engineering Group Co Ltd filed Critical China Railway Construction Engineering Group Co Ltd
Priority to CN 201120034534 priority Critical patent/CN202039511U/en
Application granted granted Critical
Publication of CN202039511U publication Critical patent/CN202039511U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
  • Building Environments (AREA)

Abstract

The utility model discloses a hidden water guide system for hyperbolic daylighting roofs, which comprises a profile gutter system (A) for gathering and discharging water, and a built-in gutter system (B) for gathering and guiding water into an open valley, wherein the two systems are connected with and communicated with each other, and are hidden crisscross in a hyperbolic daylighting roof system, the two systems and a roof keel grid are formed into a whole body, the profile gutter system (A) comprises a second transverse gutter (05), a longitudinal gutter (03) and a first transverse gutter (04), water-discharging holes (12) are distributed at intervals on the bottom of the second transverse gutter (05), and a gutter (11) which is perpendicular to the second transverse gutter (05) and communicated with the second transverse gutter (05) is arranged in the built-in gutter system (B), and is communicated with an open valley system (13). The hidden water guide system realizes the secondary water guiding and waterproofing of hyperbolic daylighting roofs, has the advantages of simple structure, good technical effect, high practicability and the like, is easy to construct and operate, quick to mount and convenient to maintain, and can be widely applied on public buildings with hyperbolic daylighting roofs, such as stations, airports, exhibition centers and the like.

Description

A kind of dark water guide system of applying of hyperbolic lighting roof
Technical field the utility model relates to a kind of water guide system, specifically, relates to a kind of dark water guide system of applying of hyperbolic lighting roof.
Background technology is well-known, public buildings such as more domestic large-scale stations, airport, exhibition center are for solving the daylighting problem, the general hyperbolic lighting roof that adopts, lighting roof generally adopts sunlight board, draining generally adopts the sunlight board gradient to carry out draining, and rainwater comes together in the open valley system of roofing periphery.The linear expansion coeffcient of this Merlon sunlight board and main material (aluminium alloy extrusions) has a long way to go, under the situation of variations in temperature, because the different problem of the coefficient of expansion, polycarbonate plate produces to expand with heat and contract with cold and produces the stroke that expands with heat and contract with cold with aluminium alloys master material and differ bigger, therefore polycarbonate plate four limits can not use waterproof gasket cement to carry out waterproof, mainly by EPDM waterproof adhesive tape waterproof.Polycarbonate plate is under the storm condition, rainwater produces surface tension on the polycarbonate plate surface, to around scattering and permeating, even inwardly infiltration of moment slight gap (the blast effect produces down) by producing between plate and adhesive tape, and generation seepage phenomenon, if deal with improperly, will produce so-called leaking, whole roof waterproof lost efficacy.Therefore need a kind of secondary leakage problem that solves the device solves lighting roof of lighting roof roof panel periphery percolating water.
Utility model content the purpose of this utility model is to provide a kind of dark water guide system of applying of hyperbolic lighting roof.
In order to achieve the above object, the utility model has adopted following technical scheme: the dark water guide system of applying that designs a kind of hyperbolic lighting roof, this system comprises the section bar guiding gutter A of system of charge for remittance draining and the built-in guiding gutter B of system that Jiang Shui compiles and import open valley, the section bar guiding gutter A of system is positioned on the big bi-curved keel of slope, on the keel in length and breadth at the panel lattice place that the slope that the built-in guiding gutter B of system is positioned at changeable many curved surfaces and hyperbolic trough is little, two systems are connected with each other and communicate, two crisscross hiding in hyperbolic lighting roof system of system, and and the roofing grid network constitute an integral body, the body cross-section of each guiding gutter among section bar guiding gutter A of system and the built-in guiding gutter B of system all is the U type.
The section bar guiding gutter A of system of the present utility model comprises horizontal two guiding gutters 05, a vertical guiding gutter 03 and a horizontal guiding gutter 04, a vertical guiding gutter 03 and a horizontal guiding gutter 04 are at grade and be perpendicular to one another and intersect and be communicated with, vertical guiding gutter 03 and horizontal two guiding gutters 05 intersect vertically at grade and communicate with each other, the bottom interval of horizontal two guiding gutters 05 is distributed with spilled water hole 12, a horizontal guiding gutter 04, horizontal two guiding gutters 05 are individually fixed on the adjacent keel 02 of going up or down stairway intersection, and vertical guiding gutter 03 is fixed on the ladder main joist 01 at the corresponding levels.
Have a guiding gutter 11 that is perpendicular to one another and communicates with horizontal two guiding gutters 05 among the built-in guiding gutter B of system of the present utility model, horizontal two guiding gutters 05 are fixed on two side wing edges of guiding gutter 11, and guiding gutter 11 communicates with open valley system 13.
Horizontal two guiding gutters 05 of the present utility model fixedly are equipped with the gland 06 that adapts with them respectively, press strip 08 and gland 07 on a vertical guiding gutter 03 and the horizontal guiding gutter 04.
Compared with prior art, the utility model has the advantages that: 1, simple in structure and technique effect good, organized dredging and the secondary water guide carried out in the issuable infiltration of hyperbolic lighting roof, efficiently solve the secondary waterproof problem of hyperbolic lighting roof; 2, guiding gutter is combined cleverly with the roof panel keel, guiding gutter secretly spreads in the Roof system, has guaranteed the associative perception of roofing, can be widely used in public buildings such as station, airport, exhibition center, thereby practical; 3, the utility model constructing operation is simple and convenient, and is quick for installation, easy to maintenance.
Be description of drawings of the present utility model below the description of drawings:
Fig. 1 is the utility model guiding gutter entire system distribution schematic diagram;
Fig. 2 is the utility model section bar guiding gutter A of system perspective view;
Fig. 3 is the section bar guiding gutter A of a system cross-sectional structure schematic diagram;
Fig. 4 is vertical guiding gutter 03 cross-sectional structure schematic diagram;
Fig. 5 is the section bar guiding gutter A of a system longitudinal profile structural representation;
Fig. 6 is horizontal two guiding gutters, 05 cross-sectional structure schematic diagram;
Fig. 7 is a horizontal guiding gutter 04 cross-sectional structure schematic diagram;
Fig. 8 is the built-in guiding gutter B of a system perspective view of the present utility model;
Fig. 9 is the built-in guiding gutter B of system longitudinal profile structural representation;
Figure 10 is guiding gutter 11 cross-sectional structure schematic diagrames;
Figure 11 is the built-in guiding gutter B of system cross-sectional structure schematic diagram;
Figure 12 is the utility model and open valley system 13 connection diagrams.
Among Fig. 1~Figure 12, A is a section bar guiding gutter system, and B is a built-in guiding gutter system, the 01st, ladder main joist at the corresponding levels, the 02nd, keel, the 03rd, vertical guiding gutter, the 04th, a horizontal guiding gutter, the 05th, horizontal two guiding gutters, the 06, the 07th, gland, the 08th, press strip, the 09th, PC plate, the 10th, EPDM adhesive tape, the 11st, guiding gutter, the 12nd, spilled water hole, the 13rd, open valley system.
The specific embodiment is further described the utility model below in conjunction with accompanying drawing:
With reference to Fig. 1, the dark water guide system of applying of hyperbolic lighting roof comprises the section bar guiding gutter A of system of charge for remittance draining and the built-in guiding gutter B of system that Jiang Shui compiles and import open valley, the section bar guiding gutter A of system is positioned on the big bi-curved keel of slope, on the keel in length and breadth at the panel lattice place that the slope that the built-in guiding gutter B of system is positioned at changeable many curved surfaces and hyperbolic trough is little, two systems are connected with each other and communicate, two crisscross hiding in hyperbolic lighting roof system of system, and and the roofing grid network constitute an integral body, constituted secondary water guide waterproofing system.The section bar guiding gutter A of system is set on the bigger hyperboloid of slope ratio, adopts stepped charge for remittance draining.Changeable many curved surfaces that two ends are milder and hyperbolic trough position are provided with the built-in guiding gutter B of system water guide at panel lattice place during schematic design and handle because slope is little, and the ratio of slope is milder, by built-in guiding gutter water are come together in the open valley system 13.
With reference to Fig. 2~Fig. 7, the section bar guiding gutter A of system comprises horizontal two guiding gutters 05, a vertical guiding gutter 03 and a horizontal guiding gutter 04, a vertical guiding gutter 03 and a horizontal guiding gutter 04 are at grade and be perpendicular to one another and intersect and be communicated with, vertical guiding gutter 03 and horizontal two guiding gutters 05 intersect vertically at grade and communicate with each other, the bottom interval of horizontal two guiding gutters 05 is distributed with spilled water hole 12, a horizontal guiding gutter 04, horizontal two guiding gutters 05 are individually fixed on the adjacent keel 02 of going up or down stairway intersection, and vertical guiding gutter 03 is fixed on the ladder main joist 01 at the corresponding levels.Horizontal two guiding gutters 05 fixedly are equipped with the gland 06 that adapts separately with them respectively, press strip 08 and gland 07 on a vertical guiding gutter 03 and the horizontal guiding gutter 04.
In concrete the enforcement, vertical guiding gutter 03 can be elongated, though the shape of vertical guiding gutter 03, a horizontal guiding gutter 04 and horizontal two guiding gutters 05 is different, the body cross-section of each guiding gutter all is the U type.The water guide principle of the section bar guiding gutter A of system: when producing rain leakage, capillary water infiltrates in the aluminium alloys guiding gutter along polycarbonate PC plate 09 surface, water in the horizontal guiding gutter 04 flows in the vertical guiding gutter 03, water in this keel guiding gutter imports again in horizontal two guiding gutters 05, can be drilled with in the distance of every 300mm in horizontal two guiding gutters 05
Figure BSA00000430894700041
Spilled water hole, percolating water will clocklike drip to roofing by spilled water hole, enter open valley 13 at last.
During installation: adopt zinc-plated junction plate will indulge on the ladder main joist 01 at the corresponding levels that guiding gutter 03 is fixed in rectangle, with a horizontal guiding gutter 04, horizontal two guiding gutters 05 are fixed on the keel 02 of rectangle, installed and fixed behind the aluminium alloys guiding gutter polycarbonate PC plate, be fixed by bolts to vertical guiding gutter 03, on a horizontal guiding gutter 04 and horizontal two guiding gutters 05, the vertical guiding gutter 03 polycarbonate PC of place plate 09 seam crossing carries out capping with the press strip 08 of aluminum alloy material, press strip 08 is fixed by bolts on the vertical guiding gutter 03, pitch of bolts preferably is no more than 300mm, press strip 08 adopts EPDM adhesive tape 10 to seal with polycarbonate PC plate 09 seam crossing, prevents to leak.Polycarbonate PC plate 09 embeds in a horizontal guiding gutter 04, horizontal two guiding gutters 05, a horizontal guiding gutter 04, horizontal two guiding gutters 05 are suitable for reading carries out capping with gland 06 and gland 07 respectively, gland 06 and gland 07 adopt EPDM adhesive tape 10 to seal with polycarbonate PC plate 09 seam crossing, prevent to leak.
With reference to Fig. 8~Figure 12, have a guiding gutter 11 that is perpendicular to one another and communicates with horizontal two guiding gutters 05 among the built-in guiding gutter B of system, horizontal two guiding gutters 05 are fixed on two side wing edges of guiding gutter 11, and guiding gutter 11 communicates with open valley system 13.Can know from Fig. 8 and to find out: this system mainly is made up of the guiding gutter 11 of horizontal two guiding gutters 05, gland 06, galvanized steel material.
The water guide principle of the built-in guiding gutter B of system: have capillary water to infiltrate by the EPDM adhesive tape along polycarbonate PC plate 09, infiltration can directly penetrate into horizontal two guiding gutters 05, be discharged to by spilled water hole 12 in the guiding gutter 11 of galvanized steel quality, and then enter open valley 12.
During installation: earlier guiding gutter 11 is fixedly welded on ladder main joist 01 at the corresponding levels and the keel 02, with bolt horizontal two guiding gutters 05 are fixed on 11 liang of side wing edges of guiding gutter again, after fixing horizontal two guiding gutters 05 polycarbonate PC plate 09 is embedded in horizontal two guiding gutters 05, carry out capping with gland 06 again, gland 06 adopts EPDM adhesive tape 10 to seal with polycarbonate PC plate 09 seam crossing, prevents to leak.

Claims (4)

1. the dark water guide system of applying of a hyperbolic lighting roof, it is characterized in that: this system comprises the section bar guiding gutter system (A) of charge for remittance draining and water is compiled and imports the built-in guiding gutter system (B) of open valley, section bar guiding gutter system (A) is positioned on the big bi-curved keel of slope, built-in guiding gutter system (B) is positioned on the keel in length and breadth at the little panel lattice place of the slope of changeable many curved surfaces and hyperbolic trough, two systems are connected with each other and communicate, two crisscross hiding in hyperbolic lighting roof system of system, and and the roofing grid network constitute an integral body, the cross section of each the guiding gutter main body in section bar guiding gutter system (A) and the built-in guiding gutter system (B) all is the U type.
2. the dark water guide system of applying according to claim 1, it is characterized in that: section bar guiding gutter system (A) comprises horizontal two guiding gutters (05), a vertical guiding gutter (03) and a horizontal guiding gutter (04), a vertical guiding gutter (03) and a horizontal guiding gutter (04) are at grade and be perpendicular to one another and intersect and connection, vertical guiding gutter (03) and horizontal two guiding gutters (05) intersect vertically at grade and communicate with each other, the bottom interval of horizontal two guiding gutters (05) is distributed with spilled water hole (12), a horizontal guiding gutter (04), horizontal two guiding gutters (05) are individually fixed on the adjacent keel (02) of going up or down stairway intersection, and vertical guiding gutter (03) is fixed on the ladder main joist at the corresponding levels (01).
3. the dark water guide system of applying according to claim 1, it is characterized in that: have a guiding gutter (11) that is perpendicular to one another and communicates with horizontal two guiding gutters (05) in the built-in guiding gutter system (B), horizontal two guiding gutters (05) are fixed on two side wing edges of guiding gutter (11), and guiding gutter (11) communicates with open valley system (13).
4. the dark water guide system of applying according to claim 2 is characterized in that: horizontal two guiding gutters (05), fixedly be equipped with the gland (06) that adapts separately with them respectively, press strip (08) and gland (07) on a vertical guiding gutter (03) and the horizontal guiding gutter (04).
CN 201120034534 2011-01-30 2011-01-30 Hidden water guide system for hyperbolic daylighting roofs Expired - Fee Related CN202039511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120034534 CN202039511U (en) 2011-01-30 2011-01-30 Hidden water guide system for hyperbolic daylighting roofs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120034534 CN202039511U (en) 2011-01-30 2011-01-30 Hidden water guide system for hyperbolic daylighting roofs

Publications (1)

Publication Number Publication Date
CN202039511U true CN202039511U (en) 2011-11-16

Family

ID=44966960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120034534 Expired - Fee Related CN202039511U (en) 2011-01-30 2011-01-30 Hidden water guide system for hyperbolic daylighting roofs

Country Status (1)

Country Link
CN (1) CN202039511U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869219A (en) * 2017-11-22 2018-04-03 芜湖宏晟金属制品有限公司 A kind of dome-shaped smoke-discharge skylight structure with drainage system
CN110158499A (en) * 2019-06-18 2019-08-23 西藏中驰集团股份有限公司 A kind of totally-enclosed sound barrier

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107869219A (en) * 2017-11-22 2018-04-03 芜湖宏晟金属制品有限公司 A kind of dome-shaped smoke-discharge skylight structure with drainage system
CN110158499A (en) * 2019-06-18 2019-08-23 西藏中驰集团股份有限公司 A kind of totally-enclosed sound barrier

Similar Documents

Publication Publication Date Title
CN103883081B (en) Open draining water-proof heat insulating system certainly
CN204738462U (en) Portable building photovoltaic roofing
CN210238957U (en) Energy-conserving roofing of green building
CN202039511U (en) Hidden water guide system for hyperbolic daylighting roofs
CN202187495U (en) Gutter hung at metal roofing cornice
CN103758221A (en) Roof deformation joint structure of automobile ramp
CN216428814U (en) Bottom plate directly spreads separation bearing high performance metal roofing
CN104124913B (en) The installation method of newly-built solar energy roof integrated power generation system
CN203701307U (en) Deformation joint structure of ramp roof of automobile
CN114508203B (en) BIPV photovoltaic roof system and construction method
CN207863328U (en) A kind of draining support construction for photovoltaic roofing system
CN205259424U (en) Two sloping ridge structures
CN214941164U (en) Steel construction gable inner panel and roofing planking face limit seam node
CN210798093U (en) Steel plate gutter for producing color steel plates
CN216893181U (en) Novel waterproof support of aluminum alloy
CN113482252A (en) Slope roof photovoltaic system and construction method thereof
CN208380184U (en) A kind of architecture-integral photovoltaic bicycle shed applied to automobile logistics garden
CN112878592A (en) Double-deck heat preservation fire prevention waterproof decoration aluminum plate
CN102704626B (en) Roof sunlight plate and mounting method
CN111219080A (en) Construction method for improving anti-leakage performance of maintenance structure of steel structure factory building
CN202187499U (en) Heavy equipment platform on metal roof
CN211473098U (en) Metal roof of prevention of seepage water
CN217975110U (en) Solar roof structure of ecological energy-saving building
CN219298558U (en) Node waterproof construction based on roofing
CN215106698U (en) Assembled BIPV unit and structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111116

Termination date: 20200130