CN202034703U - Operating lever for jumper conductor clamper - Google Patents

Operating lever for jumper conductor clamper Download PDF

Info

Publication number
CN202034703U
CN202034703U CN2010206301391U CN201020630139U CN202034703U CN 202034703 U CN202034703 U CN 202034703U CN 2010206301391 U CN2010206301391 U CN 2010206301391U CN 201020630139 U CN201020630139 U CN 201020630139U CN 202034703 U CN202034703 U CN 202034703U
Authority
CN
China
Prior art keywords
outer sleeve
inverted
inner sleeve
groove
wire clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206301391U
Other languages
Chinese (zh)
Inventor
马俊彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Electric Power Corp
State Grid Corp of China SGCC
Original Assignee
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Electric Power Corp filed Critical Beijing Electric Power Corp
Priority to CN2010206301391U priority Critical patent/CN202034703U/en
Application granted granted Critical
Publication of CN202034703U publication Critical patent/CN202034703U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

本实用新型提供了一种引流线夹操作杆,包含外套筒,内套筒,设置在外套筒内,绝缘操作杆,连接在外套筒的底端;其中,外套筒的侧壁上开有一倒L型槽,内套筒的侧壁上安装有螺栓,螺栓与倒L型槽相配合,用于引导内套筒沿倒L型槽在外套筒内轴向滑动或转动;内套筒与外套筒之间连接有一弹力部件。解决了内套筒与外套筒之间的摩擦阻力问题,还通过在绝缘操作杆底部设置折叠把手加大了引流线夹的紧固力,提高了电气连接的可靠性,同时减少了人员作业的强度,大大减少了挂拆引流线夹的时间。

Figure 201020630139

The utility model provides an operating rod of a drainage wire clip, which comprises an outer sleeve, an inner sleeve arranged in the outer sleeve, and an insulating operating rod connected to the bottom end of the outer sleeve; wherein, the side wall of the outer sleeve is opened There is an inverted L-shaped groove, and bolts are installed on the side wall of the inner sleeve, and the bolts cooperate with the inverted L-shaped groove to guide the inner sleeve to slide or rotate axially in the outer sleeve along the inverted L-shaped groove; the inner sleeve An elastic component is connected with the outer sleeve. It solves the problem of frictional resistance between the inner sleeve and the outer sleeve, and increases the fastening force of the drainage clamp by setting a folding handle at the bottom of the insulating operating rod, improves the reliability of the electrical connection, and reduces personnel work The strength greatly reduces the time for hanging and removing the drainage clip.

Figure 201020630139

Description

一种引流线夹操作杆A drain wire clip operating lever

技术领域 technical field

本实用新型涉及一种引流线夹操作杆,具体而言,涉及电力系统中一种带电作业时对引流线夹进行挂摘的引流线夹操作杆。The utility model relates to a drain wire clip operating lever, in particular to a drain wire clip operating rod for hanging and removing the drain wire clip during live work in a power system.

背景技术 Background technique

带电作业是在高压电工设备上不停电进行检修、测试的一种作业方法。带电作业是避免检修停电,保证正常供电的有效措施。其内容可分为带电测试、带电检查和带电维修等几个方面。其对象包括发电厂和变电所电工设备、架空输电线路、配电线路和配电设备。Live work is a method of maintenance and testing on high-voltage electrical equipment without power failure. Live work is an effective measure to avoid maintenance blackouts and ensure normal power supply. Its content can be divided into several aspects such as live test, live inspection and live maintenance. Its objects include electrical equipment in power plants and substations, overhead transmission lines, distribution lines and distribution equipment.

带电作业分为等电位作业(人体直接接触高压带电部分,工作人员应穿全套屏蔽服)、地电位作业(人体处于接地的杆塔或构架上,通过绝缘操作杆带电作业)和中间电位作业(通过绝缘棒等工具进入高压电场中某一区域,但尚未直接接触高压带电体)。Live work is divided into equipotential work (the human body is in direct contact with the high-voltage live part, and the staff should wear a full set of shielding clothing), ground potential work (the human body is on a grounded tower or frame, and the live work is carried out through an insulating operating rod) and intermediate potential work (through Tools such as insulating rods enter a certain area in the high-voltage electric field, but have not directly contacted the high-voltage electrified body).

现有技术的技术方案:Technical scheme of prior art:

参见图6,现有引流线夹绝缘操作杆30’有一个专用的紧杆销拴22’,并为紧杆销拴22’设计专门的倒L型槽12’,在紧杆完成后,向左转动绝缘操作杆30’,紧杆销拴22’自动滑落。Referring to Fig. 6, the existing drainage clamp insulating operating rod 30' has a special tightening rod pin 22', and a special inverted L-shaped groove 12' is designed for the tightening rod pin 22', after the tightening rod is completed, it is Rotate the insulating operating lever 30' to the left, and the tight rod pin 22' will slide down automatically.

第一步:使用时,先将内套筒沿竖槽提至横槽并将栓母移至横槽左侧,防止内套筒沿竖槽掉下,内套筒上端有一凹槽,此时将引流线夹螺杆底部横销41对准内套筒凹槽,旋转绝缘操作杆30’,将引流线夹螺杆紧固。Step 1: When using, first lift the inner sleeve to the horizontal groove along the vertical groove and move the nut to the left side of the horizontal groove to prevent the inner sleeve from falling down along the vertical groove. There is a groove at the upper end of the inner sleeve. At this time Align the horizontal pin 41 at the bottom of the drain clamp screw with the groove of the inner sleeve, rotate the insulating operating lever 30', and tighten the drain clamp screw.

第二步:当螺杆紧到尽头时,稍松绝缘杆,内套筒上的螺母自动由横槽13’左侧右移到竖槽并滑至套筒底部,再继续旋紧绝缘操作杆30’将引流线夹上螺母42紧固。Step 2: When the screw rod is tightened to the end, loosen the insulating rod slightly, and the nut on the inner sleeve will automatically move from the left side of the horizontal groove 13' to the vertical groove and slide to the bottom of the sleeve, and then continue to tighten the insulating operating rod 30 'Tighten the nut 42 on the drain wire clip.

现有技术的缺点:Disadvantages of existing technology:

(1)在使用中,操作杆要始终往上托起紧固,如有不慎,引流线夹与操作杆就会拖开。引流线没卡紧,会从引流线夹中脱离。此时还要将内套筒对准引流线夹螺杆重新紧固。(1) During use, the operating lever should always be held up and fastened. If there is carelessness, the drainage clamp and the operating lever will be pulled apart. The drain wire is not fastened and will come out of the drain wire clip. At this time, the inner sleeve must be aligned with the screw of the drain clamp and tightened again.

(2)内套筒在与引流线夹螺杆分离时,由于靠内套筒的自身重量滑至外套同底部,有时由于内套筒与外套摩擦力的作用,内套筒受到阻力,不会很顺利的下滑至外套筒底部。(2) When the inner sleeve is separated from the screw of the drainage clamp, the inner sleeve slides to the bottom of the outer sleeve due to its own weight, and sometimes due to the friction between the inner sleeve and the outer sleeve, the inner sleeve is resisted and will not be very Smoothly slide down to the bottom of the outer sleeve.

(3)在紧固螺母、螺杆时,操作杆底部没有扳手紧固点,全靠双手紧固,这样引流线夹的紧固的力度不到家,有可能造成引流线与主导线虚接的现象发生。(3) When tightening the nut and screw, there is no wrench fastening point at the bottom of the operating rod, and it is all tightened by both hands. In this way, the tightening force of the drainage wire clip is not enough, which may cause the phenomenon of false connection between the drainage wire and the main wire occur.

实用新型内容 Utility model content

本实用新型所要解决的技术问题是提供一种,操作简单、快速、连接可靠的引流线夹操作杆。The technical problem to be solved by the utility model is to provide an operation lever of the drainage wire clip which is easy to operate, fast and reliable in connection.

为解决上述技术问题,本实用新型提供了一种引流线夹操作杆,包含外套筒,内套筒,设置在外套筒内,绝缘操作杆,连接在外套筒的底端;其中,外套筒的侧壁上开有一倒L型槽,内套筒的侧壁上安装有螺栓,螺栓与倒L型槽相配合,用于引导内套筒沿倒L型槽在外套筒内轴向滑动或转动;内套筒与外套筒之间连接有一弹力部件。In order to solve the above-mentioned technical problems, the utility model provides a drainage clamp operating rod, which includes an outer sleeve, an inner sleeve, arranged in the outer sleeve, and an insulating operating rod connected to the bottom of the outer sleeve; wherein, the outer sleeve There is an inverted L-shaped groove on the side wall of the barrel. Bolts are installed on the side wall of the inner sleeve. The bolts cooperate with the inverted L-shaped groove to guide the inner sleeve to slide axially in the outer sleeve along the inverted L-shaped groove. Or rotate; an elastic component is connected between the inner sleeve and the outer sleeve.

进一步地,弹力部件的下端连接在位于外套筒上的固定端子上,上端连接在螺栓上。Further, the lower end of the elastic component is connected to the fixed terminal on the outer sleeve, and the upper end is connected to the bolt.

进一步地,引流线夹操作杆固定端子在外套筒上的位置相对倒L型槽的轴向槽在外套筒上的位置在圆周方向偏离一夹角。Further, the position of the fixed terminal of the drain clamp operation rod on the outer sleeve deviates from the position of the axial groove of the inverted L-shaped groove on the outer sleeve by an included angle in the circumferential direction.

进一步地,引流线夹操作杆固定端子与倒L型槽的横向槽的延伸偏离端上下相对地布置在倒L型槽的轴向槽的同一侧。Further, the fixed terminal of the drain clamp operating rod is arranged on the same side of the axial groove of the inverted L-shaped groove as opposed to the extended and deviated end of the transverse groove of the inverted L-shaped groove up and down.

进一步地,引流线夹操作杆倒L型槽的横向槽以其延伸偏离端向下倾斜,使得横向槽与外套筒的横截面之间有一夹角θ。Further, the transverse groove of the inverted L-shaped groove of the drain wire clip operating rod is inclined downward with its extended deviation end, so that there is an angle θ between the transverse groove and the cross-section of the outer sleeve.

进一步地,引流线夹操作杆外套筒的顶端具有与套设在引流线夹上的紧固螺杆上的紧固螺母相配合的内六角凹槽。Further, the top end of the outer sleeve of the drain clamp operating rod has an inner hexagonal groove that fits with the fastening nut sleeved on the fastening screw rod on the drain clamp.

进一步地,引流线夹操作杆外套筒的侧壁上开有一固定孔,在内套筒滑动到倒L型槽的顶端的状态下将外套筒与内套筒固定在一起。Further, a fixing hole is opened on the side wall of the outer sleeve of the drain clamp operating rod, and the outer sleeve and the inner sleeve are fixed together when the inner sleeve slides to the top of the inverted L-shaped groove.

进一步地,引流线夹操作杆内套筒的顶端垂直于轴向开有凹槽。Further, the top end of the inner sleeve of the operating rod of the drain clamp is provided with a groove perpendicular to the axial direction.

进一步地,引流线夹操作杆绝缘操作杆的尾部安装有一可折叠把手。Further, a foldable handle is installed at the tail of the insulating operating rod of the drainage clamp operating rod.

进一步地,引流线夹操作杆可折叠把手包括带有长槽的手柄,和与长槽相配合的固定螺栓,手柄通过螺栓沿长槽滑动,具有收藏在把手内部的收起状态以及垂直于绝缘杆的轴向的操作状态。Further, the foldable handle of the drainage clamp operating rod includes a handle with a long slot, and a fixing bolt matched with the long slot, the handle slides along the long slot through the bolt, has a retracted state stored inside the handle, and is perpendicular to the insulation The operating state of the axis of the rod.

本实用新型具有以下优点:The utility model has the following advantages:

1.内套筒可以通过弹力部件的作用将其拉至外套筒底部,解决了内套筒与外套筒之间的摩擦阻力问题;1. The inner sleeve can be pulled to the bottom of the outer sleeve through the action of the elastic component, which solves the problem of frictional resistance between the inner sleeve and the outer sleeve;

2.同时通过底部力矩杆加大了引流线夹的紧固力,保证了电气连接的可靠性;2. At the same time, the fastening force of the drainage clamp is increased through the bottom torque rod, which ensures the reliability of the electrical connection;

3.减少了人员作业的强度,大大减少了挂拆引流线的时间。3. Reduce the intensity of personnel work and greatly reduce the time for hanging and removing the drainage line.

总体而言,本实用新型的引流线夹操作杆结构简单,操作方便,减少了人员作业的强度。Generally speaking, the drainage wire clamp operating lever of the utility model has a simple structure, is convenient to operate, and reduces the intensity of personnel's work.

附图说明 Description of drawings

附图用来提供对本实用新型的进一步理解,构成本申请的一部分,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。在附图中:The accompanying drawings are used to provide a further understanding of the utility model and constitute a part of the application. The schematic embodiments of the utility model and their descriptions are used to explain the utility model and do not constitute improper limitations to the utility model. In the attached picture:

图1A为外套筒的主视图;Fig. 1A is the front view of outer sleeve;

图1B为外套筒的顶视图;Figure 1B is a top view of the outer sleeve;

图2为操作示意图;Figure 2 is a schematic diagram of the operation;

图3A为内套筒的侧视图;Figure 3A is a side view of the inner sleeve;

图3B为内套筒的主视图;Figure 3B is a front view of the inner sleeve;

图3C为内套筒的顶视图;Figure 3C is a top view of the inner sleeve;

图4A为引流线夹操作杆手柄的主视图;Fig. 4A is the front view of the handle of the drain wire clip operating lever;

图4B为引流线夹操作杆手柄的操作图;Fig. 4B is an operation diagram of the handle of the drainage wire clip operating lever;

图5为引流线夹操作杆的操作图;Fig. 5 is an operation diagram of the drain clamp operating lever;

图6为现有技术引流线夹操作杆的示意图。Fig. 6 is a schematic diagram of the operating lever of the drain wire clamp in the prior art.

附图标记说明:Explanation of reference signs:

11为外套筒;11 is the outer sleeve;

12为外套筒11上的倒L型槽;12 is an inverted L-shaped groove on the outer sleeve 11;

13为倒L型槽12的横向槽;13 is the transverse groove of inverted L-shaped groove 12;

14为弹力部件15的固定端子;14 is the fixed terminal of elastic component 15;

15为连接固定端子14与螺栓22的弹力部件;15 is an elastic component connecting the fixed terminal 14 and the bolt 22;

16为横向槽13与外套筒11的横截面之间的夹角θ;16 is the angle θ between the transverse groove 13 and the cross section of the outer sleeve 11;

17为拆卸引流线夹时固定内套筒使用的螺栓;17 is the bolt used to fix the inner sleeve when disassembling the drain clamp;

18为外套筒11顶端的内六角凹槽;18 is an inner hexagonal groove at the top of the outer sleeve 11;

19为固定孔;19 is a fixing hole;

21为内套筒;21 is inner sleeve;

22为固定在内套筒21上的螺栓;22 is the bolt fixed on the inner sleeve 21;

23为内套筒21顶端的凹槽;23 is the groove at the top of the inner sleeve 21;

24为内套筒21上与外套筒11上固定孔19相配合的固定孔;24 is the fixing hole on the inner sleeve 21 that matches the fixing hole 19 on the outer sleeve 11;

30为绝缘操作杆;30 is an insulating operating rod;

31为安装在绝缘操作杆30尾部的可折叠把手;31 is a foldable handle installed at the end of the insulating operating rod 30;

32为可折叠把手31上的手柄;32 is the handle on the foldable handle 31;

33为可折叠把手31上的固定螺栓;33 is the fixing bolt on the foldable handle 31;

41为引流线夹螺栓上的横销;41 is the horizontal pin on the drain clamp bolt;

42为引流线夹上的锁紧螺母;42 is the locking nut on the drain clamp;

11’为现有技术的外套筒;11' is the outer sleeve of the prior art;

12’为现有技术的倒L型槽;12' is an inverted L-shaped groove of the prior art;

13’为现有技术的横槽;13' is the horizontal groove of prior art;

22’为现有技术的紧杆销拴;22 ' is the tight rod pin of prior art;

30’为现有技术的操作杆。30' is an operating rod of the prior art.

具体实施方式 Detailed ways

下面将参考附图并结合实施例,来详细说明本实用新型。The utility model will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

参见图1A和图2,挂接引流线夹操作时,将螺栓22沿倒L型槽12向上推动,带动内套筒21至顶部后转动螺栓22卡入倒L型槽12的横槽13内。Referring to Fig. 1A and Fig. 2, when hooking up the drainage clamp, push the bolt 22 upward along the inverted L-shaped groove 12, drive the inner sleeve 21 to the top, and then turn the bolt 22 to snap into the horizontal groove 13 of the inverted L-shaped groove 12 .

参加图3A、图3B和图3C,凹槽23位于内套筒21的顶端,固定孔24位于凹槽23的下部,用于和外套筒11上的固定孔19配合;螺栓22固定在内套筒21的侧面,用于带动内套筒21在外套筒11内滑动。Referring to Fig. 3A, Fig. 3B and Fig. 3C, the groove 23 is located at the top of the inner sleeve 21, and the fixing hole 24 is located at the lower part of the groove 23, which is used to cooperate with the fixing hole 19 on the outer sleeve 11; the bolt 22 is fixed inside The side of the sleeve 21 is used to drive the inner sleeve 21 to slide in the outer sleeve 11 .

参见图3A,举高引流线夹操作杆,将引流线夹下端的横销41嵌入内套筒21顶端的凹槽23内,参见图4A,握住绝缘操作杆30底端的可折叠把手31转动并旋紧引流线夹上的螺栓,使引流线夹固定在导线上。然后向相反方向旋转绝缘操作杆30,使卡入横槽13内的螺栓22脱离出来,在弹力部件15的拉力作用下使内套筒21滑至倒L型槽12的底部与引流线夹脱离,弹力部件15为弹簧。参见图5和图1B,将外套筒11顶端的内六角凹槽18卡接引流线夹上的螺母42,转动绝缘操作杆30旋紧螺母42将引流线夹锁紧。Referring to Fig. 3A, raise the operating lever of the drain wire clamp, insert the horizontal pin 41 at the lower end of the drain wire clamp into the groove 23 at the top of the inner sleeve 21, see Fig. 4A, hold the foldable handle 31 at the bottom of the insulating operating rod 30 and turn it And tighten the bolts on the drain wire clamp to fix the drain wire clamp on the wire. Then rotate the insulating operating lever 30 in the opposite direction to disengage the bolt 22 stuck in the transverse groove 13, and under the pulling force of the elastic member 15, the inner sleeve 21 slides to the bottom of the inverted L-shaped groove 12 and disengages from the drain clamp. , The elastic component 15 is a spring. Referring to FIG. 5 and FIG. 1B , snap the inner hexagonal groove 18 on the top of the outer sleeve 11 into the nut 42 on the drain clamp, turn the insulating operating lever 30 to tighten the nut 42 to lock the drain clamp.

参见图4A,可折叠把手31为中空部件;手柄32与可折叠把手31垂直时,处于工作状态;参见图4B,手柄32旋转90度后与可折叠把手31同向状态时,处于收纳状态;固定螺栓33用于固定手柄32的位置。Referring to Fig. 4A, the foldable handle 31 is a hollow part; when the handle 32 is perpendicular to the foldable handle 31, it is in the working state; referring to Fig. 4B, when the handle 32 is rotated 90 degrees to the same direction as the foldable handle 31, it is in the storage state; The fixing bolt 33 is used to fix the position of the handle 32 .

参见图5和图3A,拆卸引流线夹操作时,将螺栓22沿倒L型槽12向上推动,带动内套筒21至顶部后,用螺栓17通过外套筒11上的固定孔19和内套筒21上的固定孔24配合,将内套筒21固定在倒L型槽12的顶端,将引流线夹操作杆顶端卡入引流线夹下端的横销41,旋转绝缘操作杆30顺序松开锁紧螺母42和螺栓,使引流线夹从导线上脱离。Referring to Fig. 5 and Fig. 3A, when disassembling the drain clamp, push the bolt 22 upward along the inverted L-shaped groove 12, and after driving the inner sleeve 21 to the top, use the bolt 17 to pass through the fixing hole 19 and the inner sleeve 11 on the outer sleeve 11. The fixing hole 24 on the sleeve 21 cooperates to fix the inner sleeve 21 on the top of the inverted L-shaped groove 12, and snaps the top of the drainage clamp operating rod into the horizontal pin 41 at the lower end of the drainage clamp, and rotates the insulating operating rod 30 to loosen in sequence. Unlock the locking nut 42 and the bolt to disengage the drain clamp from the lead.

其它实施方式:Other implementations:

弹力部件15可以是弹簧,也可以使用橡皮筋等其它弹性部件。The elastic member 15 can be a spring, and other elastic members such as rubber bands can also be used.

以上所述仅为本实用新型的优选实施例而已,并不用于限制本实用新型,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the utility model, and are not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (10)

1. drainage wire clamp action bars comprises:
Outer sleeve (11);
Inner sleeve (21) is arranged in the described outer sleeve (11); And
Insulating bar (30) is connected the bottom of described outer sleeve (11),
Wherein, have an inverted L shape groove (12) on the sidewall of described outer sleeve (11), bolt (22) is installed on the sidewall of described inner sleeve (21), described bolt (22) matches with described inverted L shape groove (12), be used to guide described inner sleeve (21) in described outer sleeve (11), to endwisely slip or rotate along described inverted L shape groove (12)
It is characterized in that: be connected with an elasticity part (15) between described inner sleeve (21) and the described outer sleeve (11).
2. drainage wire clamp action bars according to claim 1 is characterized in that: the lower end of described elasticity part (15) is connected on the fixed terminal (14) that is positioned on the described outer sleeve (11), and the upper end is connected on the described bolt (22).
3. drainage wire clamp action bars according to claim 2 is characterized in that: described fixed terminal (14) departs from an angle in the position of axial groove on described outer sleeve (11) of the described relatively inverted L shape groove in the position on the described outer sleeve (11) (12) at circumferencial direction.
4. drainage wire clamp action bars according to claim 3 is characterized in that: described fixed terminal (14) departs from the same side that end relatively is arranged in the axial groove of described inverted L shape groove (12) up and down with the extension of the transverse groove of described inverted L shape groove (12).
5. drainage wire clamp action bars according to claim 1, it is characterized in that: it is downward-sloping that the transverse groove (13) of described inverted L shape groove (12) departs from end with its extension, and making has an angle theta between the cross section of described transverse groove (13) and described outer sleeve (11).
6. drainage wire clamp action bars according to claim 1 is characterized in that: the top of described outer sleeve (11) have be set in described drainage wire clamp on fastening screw on the interior hexagonal groove (18) that matches of clamp nut.
7. drainage wire clamp action bars according to claim 1, it is characterized in that: have a fixing hole (19) on the sidewall of described outer sleeve (11), slide at described inner sleeve (21) under the state on top of described inverted L shape groove (12) and described outer sleeve (11) and described inner sleeve (21) are fixed together with bolt.
8. drainage wire clamp action bars according to claim 1 is characterized in that: the top of described inner sleeve (21) groove (23) that has perpendicular to axial direction.
9. drainage wire clamp action bars according to claim 1 is characterized in that: the afterbody of described insulating bar (30) is equipped with a collapsible handle (31).
10. drainage wire clamp action bars according to claim 9, it is characterized in that: described collapsible handle (31) comprises the handle (32) that has elongated slot, with the set bolt (33) that matches with described elongated slot, described handle (32) slides along described elongated slot by described bolt (33), and has the collapsed state that is collected in described collapsible handle (31) inside and perpendicular to the axial mode of operation of described insulating bar (30).
CN2010206301391U 2010-11-26 2010-11-26 Operating lever for jumper conductor clamper Expired - Lifetime CN202034703U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206301391U CN202034703U (en) 2010-11-26 2010-11-26 Operating lever for jumper conductor clamper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206301391U CN202034703U (en) 2010-11-26 2010-11-26 Operating lever for jumper conductor clamper

Publications (1)

Publication Number Publication Date
CN202034703U true CN202034703U (en) 2011-11-09

Family

ID=44896989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206301391U Expired - Lifetime CN202034703U (en) 2010-11-26 2010-11-26 Operating lever for jumper conductor clamper

Country Status (1)

Country Link
CN (1) CN202034703U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102629746A (en) * 2012-05-09 2012-08-08 辽宁省电力有限公司沈阳供电公司 Electrified separator for fixture of diverting lines
CN103683091A (en) * 2013-11-18 2014-03-26 重庆市电力公司永川供电局 Remote wire clamp live working assembly and disassembly rod
CN104348122A (en) * 2014-11-19 2015-02-11 国家电网公司 Ground potential mounting type shunt wire clamp device and mounting method thereof
CN107994556A (en) * 2017-12-21 2018-05-04 国家电网公司 Strain insulator yoke plate overload fever part flow arrangement
CN109768501A (en) * 2019-02-27 2019-05-17 国网安徽省电力有限公司芜湖供电公司 A kind of insulating bar overlap joint drainage the Line tool and its application method
CN110994454A (en) * 2019-12-16 2020-04-10 国网北京市电力公司 Insulation operating tool and method for temporary wire hook
CN111136607A (en) * 2020-03-03 2020-05-12 盐城市大冈石油工具厂有限责任公司 Emergency tools for working under pressure
CN112421475A (en) * 2020-09-29 2021-02-26 国网浙江省电力有限公司电力科学研究院 Operating rod for quickly lapping drainage wire and using method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102629746A (en) * 2012-05-09 2012-08-08 辽宁省电力有限公司沈阳供电公司 Electrified separator for fixture of diverting lines
CN103683091A (en) * 2013-11-18 2014-03-26 重庆市电力公司永川供电局 Remote wire clamp live working assembly and disassembly rod
CN103683091B (en) * 2013-11-18 2016-06-29 重庆市电力公司永川供电局 Remote wire clamp livewire work mounting or dismounting bar
CN104348122A (en) * 2014-11-19 2015-02-11 国家电网公司 Ground potential mounting type shunt wire clamp device and mounting method thereof
CN104348122B (en) * 2014-11-19 2017-02-08 国家电网公司 Ground potential mounting type shunt wire clamp device and mounting method thereof
CN107994556A (en) * 2017-12-21 2018-05-04 国家电网公司 Strain insulator yoke plate overload fever part flow arrangement
CN109768501A (en) * 2019-02-27 2019-05-17 国网安徽省电力有限公司芜湖供电公司 A kind of insulating bar overlap joint drainage the Line tool and its application method
CN109768501B (en) * 2019-02-27 2021-01-26 国网安徽省电力有限公司芜湖供电公司 Application method of insulating rod lap joint drainage wire tool
CN110994454A (en) * 2019-12-16 2020-04-10 国网北京市电力公司 Insulation operating tool and method for temporary wire hook
CN111136607A (en) * 2020-03-03 2020-05-12 盐城市大冈石油工具厂有限责任公司 Emergency tools for working under pressure
CN112421475A (en) * 2020-09-29 2021-02-26 国网浙江省电力有限公司电力科学研究院 Operating rod for quickly lapping drainage wire and using method thereof

Similar Documents

Publication Publication Date Title
CN202034703U (en) Operating lever for jumper conductor clamper
CN104201489B (en) A kind of novel electric power circuit anti-fall grounding wire line clamping device
CN203983842U (en) Repair apparatus hangs eminence grounding wire device
CN204658281U (en) Portable bird-scaring unit assembly wrench
CN208112103U (en) A kind of drainage thread ground connection cross-arm
CN103368110B (en) The charged installation and removal construction method of non-bearing connecting clip
CN204011790U (en) Repair apparatus hangs the binding clip of eminence grounding wire device
CN209626813U (en) The combination tool of isolation is fixed in a kind of livewire work with bypass cable
CN202616659U (en) Foldable dismounting device for bird's nest
CN202721387U (en) Special tool for changing split conductor spacer
CN202872261U (en) Insulated lever
CN211867696U (en) Special tool for fastening 110kV wiring board bolt in electrified manner
CN205542445U (en) High pressure brake pullrod
CN204088617U (en) Case dress portable telescopic ground operation bar
CN210778287U (en) Insulating rod
CN206432612U (en) A kind of switch cabinet bus static contact earthing or grounding means
CN203580945U (en) Fixing device of locomotive ground rod
CN202394727U (en) Cascading style operating rod connecting sleeve
CN108775315A (en) A kind of quick coupling
CN204012435U (en) A kind of insulating tool for fastening straight bottle
CN204205413U (en) A kind of link rod of Electrified fastening screw
CN204389542U (en) High-altitude converting equipment verification junction pole
CN209389559U (en) Power transmission line ground wire presss from both sides auxiliary installation device
CN209626064U (en) A kind of insulating bar
CN202586176U (en) Insulating operation lever

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: BEIJING ELECTRIC POWER CORP.

Effective date: 20130515

Owner name: BEIJING ELECTRIC POWER CORP.

Effective date: 20130515

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100031 XICHENG, BEIJING TO: 100031 DONGCHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130515

Address after: 100031 West Chang'an Avenue, Beijing, No. 86

Patentee after: State Grid Corporation of China

Patentee after: Beijing Electric Power Corp.

Address before: 100031 Beijing Qianmen West Street, Xicheng District, No. 41

Patentee before: Beijing Electric Power Corp.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20111109