CN201972681U - Heat injection and mechanical oil extraction integrated device - Google Patents

Heat injection and mechanical oil extraction integrated device Download PDF

Info

Publication number
CN201972681U
CN201972681U CN2010206598919U CN201020659891U CN201972681U CN 201972681 U CN201972681 U CN 201972681U CN 2010206598919 U CN2010206598919 U CN 2010206598919U CN 201020659891 U CN201020659891 U CN 201020659891U CN 201972681 U CN201972681 U CN 201972681U
Authority
CN
China
Prior art keywords
heat injection
tubing string
machine
adopted
tubular column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206598919U
Other languages
Chinese (zh)
Inventor
徐文江
孙永涛
唐晓旭
段凯滨
邹剑
马增华
林涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Tianjin Branch
Original Assignee
China Oilfield Services Ltd
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Tianjin Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Oilfield Services Ltd, China National Offshore Oil Corp CNOOC, CNOOC China Ltd Tianjin Branch filed Critical China Oilfield Services Ltd
Priority to CN2010206598919U priority Critical patent/CN201972681U/en
Application granted granted Critical
Publication of CN201972681U publication Critical patent/CN201972681U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Jet Pumps And Other Pumps (AREA)

Abstract

The utility model provides a heat injection and mechanical oil extraction integrated device, which comprises a tubular column arranged in a mineshaft, a heat injection structure, a mechanical oil extraction device and a movable brake shoe, wherein one end of the tubular column is connected with a wellhead, and the other end of the tubular column is connected with the heat injection structure; the heat injection structure is arranged at the bottom of the mineshaft, and one end of the heat injection structure is communicated with the tubular column and a hohlraum; the mechanical oil extraction device is arranged in the mineshaft, one end of the mechanical oil extraction structure is communicated with the tubular column, and the other end of the mechanical oil extraction structure is connected with a pump for the mechanical oil extraction; and the movable brake shoe is matched with the inner structure of the tubular column and is movably arranged between the tubular column and the heat injection structure. The tubular column adopted by the device can be communicated with the heat injection structure and the mechanical oil extraction structure respectively and communicated with a channel of the tubular column in a way that the movable brake shoe blocks the heat injection structure, so that the switch of heat injection, natural flow and mechanical oil extraction can be realized without replacing the tubular column.

Description

A kind of heat injection and machine are adopted integrated apparatus
Technical field
The utility model relates to a kind of heat injection and machine is adopted integrated apparatus.
Background technology
The thermal recovery technology is the effective means of viscous crude field exploitation.Oil-field thick-oil thermal recovery technology has been brought into play huge advantage at heavy crude heat extraction, has obtained insider's approval.Steam soak is a method the most frequently used in the heavy crude heat extraction.The steam soak process generally is divided into three phases: the phase I is to annotate the vapour stage.This stage is injected oil reservoir fast with high-temperature steam.Second stage is the stewing well stage.Closing well immediately after annotating vapour and finishing is convenient to heat effectively exchange in oil reservoir that steam carries, thus the heating oil reservoir.Phase III is the oil recovery stage, and this stage generally comprises blowing and two stages of oil pumping again.Pressure is higher near the shaft bottom when annotating vapour because of HTHP, and for blowing provides energy, flowing phase was generally kept several days to tens of days, and this moment, main output object was condensed water around the oil well and the crude oil that heated in a large number.When bottom pressure and strata pressure near the time, just must change the oil pumping stage over to.The oil pumping stage need trip out steam injection tubing string lower sucker rod post, utilizes sucker rod pumping then.Recover the oil and finish, trip out rod string, steam injection again repeats.What the hoisting system that land oil thermal recovery operation notes are adopted adopted is rod pumping pump.The surface driving equipment of sucker rod pump is huge, such as beam pumping unit.Offshore oil production is subjected to the restriction of platform space, can not put so huge surface driving equipment, therefore can not use sucker rod pump to carry out lifting and recover the oil.
But in thermal recovery huff and puff oil recovery process, oil thermal recovery transfers the oil recovery stage to after annotating vapour, must trip out steam injection string, descends flow string then.In the process of changing tubing string, a large amount of flushing fluids, well killing fluid cause cold damage to the stratum, and thermal loss in a large amount of wells is arranged.Play lower tubular column continually.Play lower tubular column and can cause a large amount of heat-energy losses, heat waste is bigger under the situation that especially fluid temperature (F.T.) of Zhu Ruing is lower, calorific value is less, influences the thermal recovery effect.And, under the situation of changing tubing string repeatedly, improved cost, reduced operating efficiency.
The utility model content
The technical problems to be solved in the utility model provides a kind of can the conversion between heat injection, blowing and machine are adopted, the heat injection and the machine that need not to change tubing string are adopted integrated apparatus.
In order to address the above problem, the utility model provides a kind of heat injection and machine to adopt integrated apparatus, comprising:
Tubing string, described tubing string is arranged in the pit shaft, and described tubing string one end connects well head, and the other end connects the heat injection structure;
The heat injection structure, described heat injection structure is arranged on described wellbore bottom, and an end is communicated with described tubing string and annular space;
Machine is adopted structure, and described machine is adopted structure and is arranged in the described pit shaft, and described machine is adopted structure one end and is communicated with described tubing string, and the other end connects and is used for the pump that machine is adopted;
Movable chock, described movable chock and described tubing string internal construction match, and are movably arranged between described tubing string and the heat injection structure.
Further, described machine is adopted between structure and the tubing string and is communicated with by threeway.
Further, described movable chock is movably arranged between described threeway and the heat injection structure.
Further, described pump is an electric submersible pump.
The utlity model has following advantage:
1, the utility model adopts tubing string, and this tubing string can be communicated with the heat injection structure respectively and machine is adopted structure, and stops up the passage that the heat injection structure is communicated with tubing string by movable chock, can realize the switching that heat injection, blowing and machine are adopted, and need not to change tubing string.
2, the utility model is simple in structure, is convenient to manufacture, and cost of manufacture is cheap, and result of use is good reliable, is suitable for and promotes the use of.
Description of drawings
Below in conjunction with accompanying drawing embodiment of the present utility model is described further:
Fig. 1 shows a kind of heat injection of the utility model and machine is adopted the integrated apparatus structural representation.
The specific embodiment
As shown in Figure 1, the utility model comprises that tubing string 1, heat injection structure 2, machine adopt structure 3 and movable chock 4.Wherein, tubing string 1 is general tubing string, both can be used as the heat injection tubing string, and also the machine of can be used as is adopted the tubing string use.Heat injection structure 2 is used for injecting multielement hot fluid and nitrogen to target oil reservoir 5, carries out blowing to impel this target oil reservoir.Machine is adopted structure 3 and is used for aspirating pit shaft 6 fluid, and is pumped into ground.Movable chock 4 is movable between heat injection structure 2 and the tubing string 1, stops up passage between tubing string 1 and the heat injection structure 2 when machine is adopted, and what the machine of assurance was adopted carries out smoothly.
Tubing string 1 is arranged in the pit shaft 6, and with pit shaft 6 sealed separation.Tubing string 1 one ends connect well head 7, can inject multielement hot fluid to tubing string 1 at well head 7, also the fluid that can send via tubing string 1 in well head 7 collections etc.Tubing string 1 other end connects heat injection structure 2, and the multielement hot fluid that injects via tubing string 1 injects target oil reservoir 5 by this heat injection structure 2.
Heat injection structure 2 is arranged on pit shaft 6 bottoms, is communicated with target oil reservoir 5.Heat injection structure 2 one ends are communicated with tubing string 1 and annular space 8, can make things convenient for to receive multielement hot fluid and the nitrogen that is injected by tubing string 1 and annular space 8 respectively, and inject target oil reservoir 5.
Machine is adopted structure 3 and is arranged in the pit shaft 6, and machine is adopted structure 3 one ends and is communicated with tubing string 1, and the other end connects and is used for the pump 9 that machine is adopted.This pump 9 starts when machine is adopted state, and pump is got pit shaft 6 inner fluids, and adopts structure 3 and tubing string 1 is pumped into well head 7 by machine, to ground installation.
Movable chock 4 matches with tubing string 1 internal construction, is movably arranged between tubing string 1 and the heat injection structure 2.This activity chock 4 can move in tubing string 1, when heat injection and blowing, this activity chock 4 allows the passage of 2 on open tubular column 1 and heat injection structure, should 4 activities of activity chock when machine is adopted to passage between tubing string 1 and the heat injection structure 2, because this activity chock 4 is suitable with tubing string 1 inner structure size, passage between tubing string 1 and the heat injection structure 2 can be stopped up, conveniently carry out machine and adopt.
This activity chock 4 also can be arranged on tubing string 1 outside, when needs stop up the heat injection passage, because tubing string 1 size from top to bottom for from big to small, should drop into tubing string 1 by activity chock 4, can this activity chock 4 be moved into place by gravity.When needs are mentioned this activity chock 4, can easily tubing string 1 be proposed movable chock 4 by hawser, make that passage is unimpeded between heat injection structure 2 and the tubing string 1.
The utility model adopts tubing string 1, and this tubing string 1 can be communicated with heat injection structure 2 respectively and adopt structure 3 with machine, and stops up the passage that heat injection structure 2 is communicated with tubing string 1 by movable chock 4, can realize the switching that heat injection, blowing and machine are adopted, and need not to change tubing string.
In the utility model, machine is adopted between structure 3 and the tubing string 1 and is communicated with by threeway 11.This tubing string 1 comprises tubing string 12 and lower tubular column 13, and last tubing string 12, lower tubular column 13 and machine are adopted threeway 11 is set between the structure 3, can be divided into three passages.This structure can be set up multi-channel structure, with low cost, reliable in function easily.
In the utility model, movable chock 4 is movably arranged between threeway 11 and the heat injection structure 2.These activity chock 4 blocking positions are positioned at lower tubular column 13, can realize the effect of passage between break-make tubing string 1 and the heat injection structure 2.In the passage that these activity chock 4 active tunnels also can intersect with lower tubular column 13, control device is set, thereby realizes the effect of similar spool.
In the utility model, pump 9 is an electric submersible pump.Adopt electric submersible pump, reliable in action, and can adapt to 6 particular surroundings in the pit shaft, what help that machine adopts carries out smoothly.
The utility model is simple in structure, is convenient to manufacture, and cost of manufacture is cheap, and result of use is good reliable, is suitable for and promotes the use of.
In sum; it below only is preferred embodiment of the present utility model; be not to be used to limit protection domain of the present utility model; therefore; all any modifications of within spirit of the present utility model and principle, being done, be equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.

Claims (4)

1. heat injection and machine are adopted integrated apparatus, it is characterized in that, comprising:
Tubing string, described tubing string is arranged in the pit shaft, and described tubing string one end connects well head, and the other end connects the heat injection structure;
The heat injection structure, described heat injection structure is arranged on described wellbore bottom, and an end is communicated with described tubing string and annular space;
Machine is adopted structure, and described machine is adopted structure and is arranged in the described pit shaft, and described machine is adopted structure one end and is communicated with described tubing string, and the other end connects and is used for the pump that machine is adopted;
Movable chock, described movable chock and described tubing string internal construction match, and are movably arranged between described tubing string and the heat injection structure.
2. heat injection as claimed in claim 1 and machine are adopted integrated apparatus, it is characterized in that: described machine is adopted between structure and the tubing string and is communicated with by threeway.
3. heat injection as claimed in claim 2 and machine are adopted integrated apparatus, it is characterized in that: described movable chock is movably arranged between described threeway and the heat injection structure.
4. heat injection as claimed in claim 3 and machine are adopted integrated apparatus, it is characterized in that: described pump is an electric submersible pump.
CN2010206598919U 2010-12-14 2010-12-14 Heat injection and mechanical oil extraction integrated device Expired - Fee Related CN201972681U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206598919U CN201972681U (en) 2010-12-14 2010-12-14 Heat injection and mechanical oil extraction integrated device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206598919U CN201972681U (en) 2010-12-14 2010-12-14 Heat injection and mechanical oil extraction integrated device

Publications (1)

Publication Number Publication Date
CN201972681U true CN201972681U (en) 2011-09-14

Family

ID=44577788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206598919U Expired - Fee Related CN201972681U (en) 2010-12-14 2010-12-14 Heat injection and mechanical oil extraction integrated device

Country Status (1)

Country Link
CN (1) CN201972681U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392624A (en) * 2011-09-22 2012-03-28 中国海洋石油总公司 Injection-and-production-separated oil well heat-injecting oil production process and units
CN102654048A (en) * 2012-05-25 2012-09-05 中国海洋石油总公司 Injection-production two-trip pipe string balanced well killing control method
CN103867171A (en) * 2012-12-10 2014-06-18 中国海洋石油总公司 Production pipe string of electric submersible pump for offshore heavy oil thermal recovery

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392624A (en) * 2011-09-22 2012-03-28 中国海洋石油总公司 Injection-and-production-separated oil well heat-injecting oil production process and units
CN102392624B (en) * 2011-09-22 2014-09-10 中国海洋石油总公司 Injection-and-production-separated oil well heat-injecting oil production process and units
CN102654048A (en) * 2012-05-25 2012-09-05 中国海洋石油总公司 Injection-production two-trip pipe string balanced well killing control method
CN102654048B (en) * 2012-05-25 2014-08-20 中国海洋石油总公司 Injection-production two-trip pipe string balanced well killing control method
CN103867171A (en) * 2012-12-10 2014-06-18 中国海洋石油总公司 Production pipe string of electric submersible pump for offshore heavy oil thermal recovery
CN103867171B (en) * 2012-12-10 2016-06-08 中国海洋石油总公司 A kind of Offshore Heavy Oil Field thermal recovery electric submersible pump producing tubular column and application thereof

Similar Documents

Publication Publication Date Title
US20200011573A1 (en) Geothermal system operable between heat recovery and heat storage modes
CN201212387Y (en) Gas injection, gas production and brine discharge integration process pipe column for underground gas storage
US20120174581A1 (en) Closed-Loop Systems and Methods for Geothermal Electricity Generation
CN106968601B (en) Exploit the casing programme and method of dry-hot-rock geothermal resource
CN102587981B (en) Underground salt cavern gas storage and building method thereof
US20110048005A1 (en) Loop geothermal system
CN204252967U (en) Hot dry rock multi cycle heating system
CN201972682U (en) Gas-injection oil-exploitation tubular column adopting packer technology for horizontal well
CN201843600U (en) SAGD (Steam Assisted Gravity Drainage) mechanical lifting circulating preheating equipment
CN106499376A (en) A kind of air injection auxiliary super-viscous oil underground cracking modifying process based on pit shaft heating mode
CN102352744A (en) Circulating hot water heavy oil thermal recovery system for ultra-deep well and process thereof
CN201972681U (en) Heat injection and mechanical oil extraction integrated device
CN210033395U (en) Single horizontal well gravity oil drainage exploitation device using underground steam generation
CN201874543U (en) Underground boosting water injection process pipe string
CN106382106B (en) The method and apparatus for carrying out underground period huff and puff oil recovery using supercritical carbon dioxide
CN108386167A (en) Horizontal well water pumping gas production completion tubular column and production method
CN203145912U (en) Bypassing controller
CN103867171A (en) Production pipe string of electric submersible pump for offshore heavy oil thermal recovery
CN101936152A (en) Seaborne thick oil thermal extracting and lifting technology and device
CN101666221A (en) Oil well geothermal self-energy wax-proofing device
CN102720475A (en) Safe and energy-saving immovable-string viscosity-breaking and paraffin-inhibiting system for offshore oilfields
CN204344428U (en) A kind of thick oil pump
US20220154564A1 (en) Low Emissions Well Pad with Integrated Enhanced Oil Recovery
CN201517374U (en) Gas production well completion column jacket
CN202810812U (en) An oil extraction pipe column lifting thickened oil with steam power

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110914

Termination date: 20181214

CF01 Termination of patent right due to non-payment of annual fee