CN108386167A - Horizontal well water pumping gas production completion tubular column and production method - Google Patents

Horizontal well water pumping gas production completion tubular column and production method Download PDF

Info

Publication number
CN108386167A
CN108386167A CN201810101692.7A CN201810101692A CN108386167A CN 108386167 A CN108386167 A CN 108386167A CN 201810101692 A CN201810101692 A CN 201810101692A CN 108386167 A CN108386167 A CN 108386167A
Authority
CN
China
Prior art keywords
horizontal well
liquid level
water pumping
tubular column
drainpipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810101692.7A
Other languages
Chinese (zh)
Inventor
查永进
汪海阁
葛云华
纪国栋
李洪
刘明鑫
赵梦梨
马振喜
韩泽龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
CNPC Engineering Technology R&D Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
CNPC Drilling Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd, CNPC Drilling Research Institute Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201810101692.7A priority Critical patent/CN108386167A/en
Publication of CN108386167A publication Critical patent/CN108386167A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/34Arrangements for separating materials produced by the well

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a kind of horizontal well water pumping gas production completion tubular column and production method, which includes:Protective casing in horizontal well vertical well section is set;Slotted liner in horizontal well net horizontal section is set, and the slotted liner is suspended on the protective casing, and the net horizontal section is for being arranged in combustible ice payzone;Air collecting pipe in the protective casing is set, and the lower end of the air collecting pipe is located above the combustible ice payzone, and the upper end of the air collecting pipe is for fixing on the ground;The lower end of the mobilizable drainpipe being arranged in the horizontal well, the drainpipe is located in the horizontal segment, and space out predetermined elevation is provided with the first detecting liquid level part and the second detecting liquid level part on the drainpipe.Horizontal well water pumping gas production completion tubular column provided by the invention and production method have started the new technology of the horizontal well water pumping gas production of combustible ice exploitation, can be carried out efficiently combustible ice exploitation.

Description

Horizontal well water pumping gas production completion tubular column and production method
Technical field
The present invention relates to combustible ice production technique field, more particularly to a kind of horizontal well water pumping gas production completion tubular column and production Method.
Background technology
Gas hydrates (natural gas hydrate, abbreviation NGH) are natural gases under certain low temperature, high pressure The non-stoichiometric cage compound to be formed is combined with water, appearance is as snow or ice.It is a large amount of due to containing in gas hydrates The imflammable gas such as methane, easily burn, therefore be otherwise known as " combustible ice ".With the changes such as traditional coal, oil and natural gas The stone energy is compared, and the exploitation of combustible ice is more not easy.The exploitation of world combustible ice is limited to marine site more at present, and main recovery method has 3 kinds:First, heat shock method, i.e., decomposite the principle of methane gas when being heated using combustible ice;Second is that voltage drop method, expert proposes will Nuke rubbish is embedded to ground end, so that it is decomposited methane gas using nuclear radiation effect;Third, injectant method, injects to combustible ice payzone Brine, methanol, ethyl alcohol etc. destroy original balance and promote its decomposition.Above-mentioned recovery method technical sophistication, speed are slow, costly, and And in ocean hydrate pressure it is higher, realize pipeline Reasonable Arrangement, natural gas it is efficient collect it is more difficult.
In combustible ice recovery process, due to the infiltration of liquid, two phase flow is formed in infiltration runner and flow string, it is right The energy of gas well causes damages, and arranges the liquid that do not go out and is accumulated in oil pipe, forms gas well plug-ging, seriously affect production efficiency. Usually improve hydrops situation with the method for water pumping gas production, resumes production.Current water drainage-gas recovery technology method includes:Optimizing pipe string Method, foaming water discharge method, gaslift drainage, machine take out method, electric submersible pump drainage, ultrasonic wave water pumping gas production method and fluid jet etc..Wherein: Optimizing pipe string method is exactly the middle and later periods developed in gas well, by adjusting the size of flow string, reduces the slippage damage of gas-liquid two-phase It loses, to further the energy of gas well itself be utilized to drain outward, increases gas deposit recovery efficiency.Foam drainage gas recovery is exactly to pass through ground Face equipment injects surfactant to underground, is allowed to be contacted with water, and in the mixed of natural gas (or external injection air source) The foam that reaction under agitaion generates low-density is closed, the surface tension of liquid in well is reduced, changes gas-liquid two-phase in pit shaft Fluidised form dredges gas-liquid channel, and natural gas entrained foam rises to ground, to achieve the purpose that water pumping gas production.Machine takes out the work of method Mode is bar deep well pump to be mounted on oil pipe, and transfer to suitable depth, and machine drives sucker rod motive liquid and earthward Transport, sucker rod have plunger, are pumped in inspiration well by the switch tie surface of upper and lower stroke standing valve.Natural gas Constantly assemble in oil, collar-shaped space, after casing pressure is more than certain value, natural gas is just plucked out of and carries out gas-liquid point on ground From to achieve the purpose that water pumping gas production.Gas lift method refers to when the energy of gas well is not enough to lifting ponding, and artificial gives gas Well provides energy.High-pressure natural gas is injected into the well of stop-spraying to increase bottom pressure, supplements stratum energy, make the gas in shaft bottom Body has the ability of lifting liquid to carry out water pumping gas production, restores gas capacity of well.These methods both can be answered individually With can be combined again, for example gas lift method is combined with foaming water discharge method, can improve drainage efficiency to a greater extent.These Method is to be designed for straight well, and horizontal well is compared to straight well, has big with payzone contact area, and producing pressure differential is small, Flow resistance is small, and well yield is high, can avoiding obstacles and many advantages, such as bad environments area.At present in combustible ice exploitation Horizontal well water pumping gas production field is still in the exploratory stage.
Invention content
The object of the present invention is to provide a kind of horizontal well water pumping gas production completion tubular column and production methods, have started combustible ice and have opened The new technology for the horizontal well water pumping gas production adopted can be carried out efficiently combustible ice exploitation.
Following technical proposal can be used to realize in the above-mentioned purpose of the present invention:
A kind of horizontal well water pumping gas production completion tubular column, the horizontal well water pumping gas production completion tubular column include:
Protective casing in horizontal well vertical well section is set;
Slotted liner in horizontal well net horizontal section is set, and the slotted liner is suspended on the protective casing, described Net horizontal section is for being arranged in combustible ice payzone;
Air collecting pipe in the protective casing is set, the lower end of the air collecting pipe is located above the combustible ice payzone, The upper end of the air collecting pipe is for fixing on the ground;
The lower end of the mobilizable drainpipe being arranged in the horizontal well, the drainpipe is located in the horizontal segment, Space out predetermined elevation is provided with the first detecting liquid level part and the second detecting liquid level part on the drainpipe.
In one preferred embodiment, the drainpipe is the movable pipe made of continuously managing.
In one preferred embodiment, the lower end of the drainpipe is disposed with sand washing connector, electric submersible pump unit.
In one preferred embodiment, the electric submersible pump unit is centrifugal multistage pump multiple centrifugal pump comprising:Submersible motor, guarantor Protect device and electric submersible pump.
In one preferred embodiment, the slotted liner is suspended on by packer on the protective casing.
In one preferred embodiment, the upper end of the protective casing is connected with produced water treatment equipment and ground row Waterpipe.
In one preferred embodiment, the upper end of the air collecting pipe be connected in turn ground gas-liquid separator, wind turbine, Ground steam line.
In one preferred embodiment, further include controller, the controller and the first detecting liquid level part, the Two detecting liquid level parts, electric submersible pump unit, ground gas-liquid separator, wind turbine are electrically connected, and the controller can be according to described first Liquid level signal is opened the electric submersible pump unit and is drained;The electric submersible pump unit is closed according to second liquid level signal to stop Draining, and start the ground gas-liquid separator, wind turbine, carry out gas generation.
A kind of production method of above-mentioned horizontal well water pumping gas production completion tubular column, including:
Obtain the first liquid level signal of the first detecting liquid level part;The electric submersible pump machine is opened according to first liquid level signal Group is drained, the up and down drainpipe in draining;
Obtain the second liquid level signal of the second detecting liquid level part;The electric submersible pump machine is closed according to second liquid level signal Group stops draining, carries out gas generation.
In one preferred embodiment, the first level detection part is located at the upper of the second detecting liquid level part Portion.
The features and advantages of the invention are:Horizontal well water pumping gas production completion tubular column provided herein and production method, By the way that the protective casing in horizontal well vertical well section is arranged;Slotted liner in horizontal well net horizontal section, the slot lining are set Pipe is suspended on the protective casing, and the net horizontal section is for being arranged in combustible ice payzone;It is arranged in the protective casing The lower end of interior air collecting pipe, the air collecting pipe is located above the combustible ice payzone, and the upper end of the air collecting pipe is for being fixed on On ground;The lower end of the mobilizable drainpipe being arranged in the horizontal well, the drainpipe is located in the horizontal segment, institute It states space out predetermined elevation on drainpipe and is provided with the first detecting liquid level part and the second detecting liquid level part, in use, first liquid Face detection part is drained when detecting liquid level, and drainpipe can carry out up and down at this time, makes shaking out in well can be by It takes away.When second detecting liquid level part detects lower liquid level, terminate to draw water, carries out gas generation.It so alternately produces, starts The new technology of the horizontal well water pumping gas production of combustible ice exploitation can be carried out efficiently combustible ice exploitation.
With reference to following description and accompanying drawings, the particular implementation of the application is disclosed in detail, specifies the original of the application Reason can be in a manner of adopted.It should be understood that presently filed embodiment is not so limited in range.In appended power In the range of the spirit and terms that profit requires, presently filed embodiment includes many changes, modifications and is equal.
The feature for describing and/or showing for a kind of embodiment can be in a manner of same or similar one or more It is used in a other embodiment, it is combined with the feature in other embodiment, or substitute the feature in other embodiment.
It should be emphasized that term "comprises/comprising" refers to the presence of feature, one integral piece, step or component when being used herein, but simultaneously It is not excluded for the presence or additional of one or more other features, one integral piece, step or component.
Description of the drawings
Fig. 1 is a kind of schematic diagram of horizontal well water pumping gas production completion tubular column in the application embodiment;
Fig. 2 is a kind of step flow chart based on aforementioned production method in the application embodiment.
Reference sign:
1- slotted liners, 2- protective casings, the ground 3-, 4- air collecting pipes, 5- drainpipes, 6- combustible ices payzone, 7- sand washings connect Head, 8- electric submersible pumps unit, 9- produced water treatments equipment, 10- land drainages pipeline, the ground 11- gas-liquid separator, 12- wind turbines, The ground 13- steam line.
Specific implementation mode
Below in conjunction with the drawings and specific embodiments, elaborate to technical scheme of the present invention, it should be understood that these Embodiment is only illustrative of the invention and is not intended to limit the scope of the invention, after having read the present invention, this field skill Art personnel each fall in the application range as defined in the appended claims the modification of the various equivalent forms of the present invention.
Unless otherwise defined, all of technologies and scientific terms used here by the article and belong to the technical field of the application The normally understood meaning of technical staff is identical.The term used in the description of the present application is intended merely to description tool herein The purpose of the embodiment of body, it is not intended that in limitation the application.
It should be noted that when element is referred to as " being set to " another element, it can be directly on another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it can be directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", "upper", "lower", "left", "right" and similar statement for illustrative purposes only, are not offered as being unique embodiment.
A kind of horizontal well water pumping gas production completion tubular column of present invention offer and production method, have started the level of combustible ice exploitation The new technology of well water pumping gas production can be carried out efficiently combustible ice exploitation.
Referring to Fig. 1, providing a kind of horizontal well water pumping gas production completion tubular column in the application embodiment, may include: Protective casing 2 in horizontal well vertical well section is set;Slotted liner 1 in horizontal well net horizontal section, the slotted liner 1 are set It is suspended on the protective casing 2, the net horizontal section is for being arranged in combustible ice payzone 6;It is arranged in the protective casing 2 The lower end of interior air collecting pipe 4, the air collecting pipe 4 is located at 6 top of the combustible ice payzone, and the upper end of the air collecting pipe 4 is for solid It is scheduled on ground 3;The lower end of the mobilizable drainpipe 5 being arranged in the horizontal well, the drainpipe 5 is located at the level In section, space out predetermined elevation is provided with the first detecting liquid level part and the second detecting liquid level part on the drainpipe 5.
A kind of horizontal well water pumping gas production completion tubular column suitable for combustible ice exploitation, master are provided in the application embodiment Including:Slotted liner 1, protective casing 2, ground 3, air collecting pipe 4, drainpipe 5.Further, may include:Sand washing connector 7, Electric submersible pump unit 8, produced water treatment equipment 9, land drainage pipeline 10, ground gas-liquid separator 11, wind turbine 12, ground air supply pipe Road 13.
It, can be real using 1 completion technique of horizontal well slotted liner after completing Horizontal Well Drilling well operations when specific installation Now preferable sand control effect.Specifically, slotted liner 1 can be suspended on protective casing 2.Wherein, which can be with It is suspended on the protective casing 2 by packer.Due to there is slips to lock rubber sealing structure in packer, this slips is just The function of suspension can be undertaken.
From the air collecting pipe 4 and drainpipe 5 of the tripping in routine into well of ground 3.Wherein, which can be by continuous control At movable pipe.When needing carry out activity sand washing, continuous pipe top and continuous pipe pipe in coiled tubing unit are welded Dragging operation can be carried out using coiled tubing unit.Plain tubing, which carries out sand washing operation, to be influenced due to oil connection, lead Cause the damage to 4 column of air collecting pipe.And coiled tubing is since there is no the structure of oil connection, it can be to avoid to 4 column of air collecting pipe Damage.Continuous pipe, which removes speed, simultaneously can reach 2000 meters per hour, far above 200 meters of activity speed per hour of conventional oil pipe Degree.
Wherein, air collecting pipe 4 is fixed behind the top of straight well section combustible ice payzone 6.Specifically, the air collecting pipe 4 can be with It is fixed by the production tree of well head.And after drainpipe 5 is in horizontal segment, the manufactured drainpipe 5 of the continuous pipe of reason, which has, to be grasped For complicated pressure seal and well control during work, need not be threadedly coupled, and can work in production, and can be very Enter the characteristics of well neutralization is enhanced from well soon, drainpipe 5 can be movable in process of production.
In one embodiment, the bottom of the drainpipe 5 is sequentially arranged with sand washing connector 7 and electric submersible pump unit 8, wherein The electric submersible pump unit 8 is centrifugal multistage pump multiple centrifugal pump comprising:Submersible motor, protector and electric submersible pump.Sand washing connector 7 can make drainpipe 5 In hydraulic shock sand setting, promote mulling liquid to return out ground 3 upwards from the central tube inside sand washing connector 7, cooperation drainpipe 5 can With the feature of activity, to realize the horizontal segment sand washing operation of high quality.Electric submersible pump unit 8 is a kind of centrifugal multistage pump multiple centrifugal pump, with row Water pipe 5 puts into underground work together, drives multistage centrifugal impeller of pump to generate rotation by motor, constantly that down-hole liquid is upward It is lifted to ground 3.
The upper end of the protective casing 2 is connected with produced water treatment equipment 9 and land drainage pipeline 10.The air collecting pipe 4 Upper end be connected with ground gas-liquid separator 11, wind turbine 12, ground steam line 13 in turn.After down-hole liquid is lifted to ground 3, Through produced water treatment equipment 9, land drainage pipeline 10 is transported to.It is carried out further into ground gas-liquid separator 11 after gas extraction Dehydration.The exhaust pipe of gas-liquid separator wind turbine 12 in succession, the free gas of underground is pumped out rapidly by wind turbine 12, right Underground is depressured, and improves flowing velocity of the gas in air collecting pipe 4, enhances its fluid-carrying capability.Treated, and natural gas is defeated Toward steam line.
In the present embodiment, space out predetermined elevation is provided with the first detecting liquid level part and the second liquid on the drainpipe 5 Face detection part.Specifically, the first detecting liquid level part or the second detecting liquid level part can be the form of level sensor, use Whether there is liquid in detection precalculated position.The first detecting liquid level part, the second detecting liquid level part specific installation position can be with It carries out according to the actual needs, the application does not make specific limit herein.For example, superposed first detecting liquid level part can To be determined according to stable outlet point in well;The second detecting liquid level part positioned at lower part can be arranged in the position of hole stability.Its In, it is not in position phenomena such as caving in, miss that the position of the hole stability, which refers specifically to the wellbore in gas production process,.
When specific works, lower two detecting liquid level parts, the first detecting liquid level part are installed in 5 certain position of drainpipe It is drained when detecting liquid level, drainpipe 5 can carry out up and down at this time, make shaking out in well that can be pumped.It takes out Terminate to draw water (when i.e. the second detecting liquid level part detects lower liquid level) when water drops to the producing pressure differential maximum value of control to liquid level, into Row gas generation.So alternately produce.
In one embodiment, which further includes controller, which can set It sets on ground 3.The controller and the first detecting liquid level part, the second detecting liquid level part, electric submersible pump unit 8, ground gas Liquid/gas separator 11, wind turbine 12 are electrically connected, and the controller can open the electric submersible pump unit 8 according to first liquid level signal It is drained;The electric submersible pump unit 8 is closed according to second liquid level signal and stops draining, and starts the ground gas-liquid point From device 11, wind turbine 12, gas generation is carried out.
Horizontal well water pumping gas production completion tubular column provided herein, by the way that the technology set in horizontal well vertical well section is arranged Pipe 2;Slotted liner 1 in horizontal well net horizontal section is set, and the slotted liner 1 is suspended on the protective casing 2, the water Horizontal well section is for being arranged in combustible ice payzone 6;The air collecting pipe 4 being arranged in the protective casing 2, under the air collecting pipe 4 End is located at 6 top of the combustible ice payzone, and the upper end of the air collecting pipe 4 is for being fixed on ground 3;It is arranged in the horizontal well The lower end of interior mobilizable drainpipe 5, the drainpipe 5 is located in the horizontal segment, and predetermined height is spaced on the drainpipe 5 Degree is provided with the first detecting liquid level part and the second detecting liquid level part, in use, the first detecting liquid level part detects liquid level Shi Jinhang is drained, and drainpipe 5 can carry out up and down at this time, make shaking out in well that can be pumped.Second detecting liquid level part When detecting lower liquid level, terminate to draw water, carries out gas generation.It so alternately produces, has started the level of combustible ice exploitation The new technology of well water pumping gas production can be carried out efficiently combustible ice exploitation.
Referring to Fig. 2, for the horizontal well water pumping gas production completion tubular column that the above embodiment provides, the application embodiment In correspondingly provide a kind of production method, this method may include steps of:
Step S10:Obtain the first liquid level signal of the first detecting liquid level part;According to first liquid level signal unlatching Electric submersible pump unit 8 is drained, the up and down drainpipe 5 in draining;
Step S12:Obtain the second liquid level signal of the second detecting liquid level part;According to second liquid level signal closing Electric submersible pump unit 8 stops draining, carries out gas generation.
In the present embodiment, the concrete structure of horizontal well water pumping gas production completion tubular column and composition please refer to horizontal well draining The specific descriptions of gas production completion tubular column embodiment, specifically, details are not described herein by the application.
When being produced using the horizontal well water pumping gas production completion tubular column, two liquid up and down being arranged on drainpipe 5 is utilized Face detection part, the first detecting liquid level part are drained when detecting liquid level, and drainpipe 5 can carry out work up and down at this time It is dynamic, make shaking out in well that can be pumped.(i.e. the second detecting liquid level when the producing pressure differential maximum value for dropping to control of drawing water to liquid level When part detects lower liquid level) terminate to draw water, carry out gas generation.It so alternately produces, has started the water of combustible ice exploitation The new technology of horizontal well water pumping gas production can be carried out efficiently combustible ice exploitation.
Herein cited any digital value all include between lower limiting value to upper limit value with the lower value of an incremented and The all values of upper value, there are the intervals of at least two units between any lower value and any much higher value.For example, such as Fruit elaborates that the quantity of component or the value of process variable (such as temperature, pressure, time etc.) are from 1 to 90, preferably from 20 To 80, more preferably from 30 to 70, then purpose is arrived in order to illustrate also clearly listing such as 15 to 85,22 in the specification 68,43 to 51,30 to 32 is equivalent.For the value less than 1, suitably think that a unit is 0.0001,0.001,0.01,0.1. These are only intended to the example clearly expressed, it is believed that the numerical value enumerated between minimum and peak is possible to Combination is all expressly set forth in the specification in a similar manner.
Unless otherwise indicated, all ranges all include all numbers between endpoint and endpoint.It is used together with range " about " or " approximation " be suitable for two endpoints of the range.Thus, " about 20 to 30 " are intended to covering " about 20 to about 30 ", including at least the endpoint indicated.
All articles and reference disclosed herein, including patent application and publication, for various purposes by helping Draw and is hereby incorporated by.Describe combination term " substantially by ... constitutes " should including identified element, ingredient, component or step with And other elements, ingredient, component or step essentially without the basic novel feature for influencing the combination.Use term "comprising" Or " comprising " describes the combination of element here, ingredient, component or step it is also contemplated that substantially by these elements, ingredient, portion The embodiment that part or step are constituted.Here by using term " can with ", it is intended to illustrate described that " can with " includes What attribute is all optional.
Multiple element, ingredient, component or step can be provided by single integrated component, ingredient, component or step.Optionally Ground, single integrated component, ingredient, component or step can be divided into multiple element, ingredient, component or the step of separation.It is used for The open "a" or "an" for describing element, ingredient, component or step is not said to exclude other elements, ingredient, component Or step.
Above-mentioned each embodiment in this specification is described in a progressive manner, identical between each embodiment Similar portion is cross-referenced, and what each embodiment stressed is and other embodiment difference.
The foregoing is merely several embodiments of the invention, although disclosed herein embodiment it is as above, institute Content is stated only to facilitate the embodiment for understanding the present invention and using, is not intended to limit the present invention.Any institute of the present invention Belong to those skilled in the art, do not depart from disclosed herein spirit and scope under the premise of, can be in embodiment Formal and details on make any modification and variation, but the scope of patent protection of the present invention still must be with appended claims Subject to the range that book is defined.

Claims (10)

1. a kind of horizontal well water pumping gas production completion tubular column, which is characterized in that
Protective casing in horizontal well vertical well section is set;
Slotted liner in horizontal well net horizontal section is set, and the slotted liner is suspended on the protective casing, the level Well section is for being arranged in combustible ice payzone;
Air collecting pipe in the protective casing is set, and the lower end of the air collecting pipe is located above the combustible ice payzone, described The upper end of air collecting pipe is for fixing on the ground;
The lower end of the mobilizable drainpipe being arranged in the horizontal well, the drainpipe is located in the horizontal segment, described Space out predetermined elevation is provided with the first detecting liquid level part and the second detecting liquid level part on drainpipe.
2. horizontal well water pumping gas production completion tubular column as described in claim 1, which is characterized in that the drainpipe is by continuously managing Manufactured movable pipe.
3. horizontal well water pumping gas production completion tubular column as claimed in claim 2, which is characterized in that the lower end of the drainpipe is successively It is provided with sand washing connector, electric submersible pump unit.
4. horizontal well water pumping gas production completion tubular column as claimed in claim 3, which is characterized in that the electric submersible pump unit is multistage Centrifugal pump comprising:Submersible motor, protector and electric submersible pump.
5. horizontal well water pumping gas production completion tubular column as described in claim 1, which is characterized in that the slotted liner passes through packing Device is suspended on the protective casing.
6. horizontal well water pumping gas production completion tubular column as claimed in claim 4, which is characterized in that the upper end of the protective casing connects It is connected to produced water treatment equipment and land drainage pipeline.
7. horizontal well water pumping gas production completion tubular column as described in claim 1, which is characterized in that the upper end of the air collecting pipe is successively It is connected with ground gas-liquid separator, wind turbine, ground steam line.
8. horizontal well water pumping gas production completion tubular column as claimed in claim 7, which is characterized in that further include controller, the control Device processed electrically connects with the first detecting liquid level part, the second detecting liquid level part, electric submersible pump unit, ground gas-liquid separator, wind turbine It connects, the controller can open the electric submersible pump unit according to first liquid level signal and be drained;According to second liquid Electric submersible pump unit described in the signal-off of face stops draining, and starts the ground gas-liquid separator, wind turbine, carries out gas generation.
9. a kind of production method based on horizontal well water pumping gas production completion tubular column according to any one of claims 8, which is characterized in that packet It includes:
Obtain the first liquid level signal of the first detecting liquid level part;According to first liquid level signal open the electric submersible pump unit into Row draining, the up and down drainpipe in draining;
Obtain the second liquid level signal of the second detecting liquid level part;The electric submersible pump unit is closed according to second liquid level signal to stop It only drains, carries out gas generation.
10. production method as claimed in claim 9, which is characterized in that the first level detection part is located at second liquid The top of face detection part.
CN201810101692.7A 2018-02-01 2018-02-01 Horizontal well water pumping gas production completion tubular column and production method Pending CN108386167A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810101692.7A CN108386167A (en) 2018-02-01 2018-02-01 Horizontal well water pumping gas production completion tubular column and production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810101692.7A CN108386167A (en) 2018-02-01 2018-02-01 Horizontal well water pumping gas production completion tubular column and production method

Publications (1)

Publication Number Publication Date
CN108386167A true CN108386167A (en) 2018-08-10

Family

ID=63074912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810101692.7A Pending CN108386167A (en) 2018-02-01 2018-02-01 Horizontal well water pumping gas production completion tubular column and production method

Country Status (1)

Country Link
CN (1) CN108386167A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109798078A (en) * 2019-03-06 2019-05-24 中联煤层气有限责任公司 Coal bed gas horizontal well cave sand buries workover process
CN110593822A (en) * 2019-09-27 2019-12-20 西南石油大学 Method for removing accumulated liquid at bottom of water-gas-producing well
CN112832702A (en) * 2021-02-04 2021-05-25 西南石油大学 Foam drainage gas production-sand washing integrated device and process thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2431182B (en) * 2005-10-12 2010-09-29 Weatherford Lamb Gas operated pump for hydrocarbon wells
CN201963266U (en) * 2010-12-22 2011-09-07 中国石油天然气集团公司 Underground double-pipe technological pipe column
CN205036364U (en) * 2015-08-06 2016-02-17 北京都市鼎点科技股份有限公司 Intelligent gas well row adopts raising output device and system
CN106150450A (en) * 2016-07-13 2016-11-23 西南石油大学 A kind of horizontal gas well machine water-pumping/draining gas production system
CN106437654A (en) * 2015-08-06 2017-02-22 迪瑞普技术(北京)有限公司 Intelligent gas well discharge and recovery production-increasing device
CN107120099A (en) * 2017-06-02 2017-09-01 四川瑞晟石油设备开发有限公司 A kind of Full-automatic drainage gas recovery facility

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2431182B (en) * 2005-10-12 2010-09-29 Weatherford Lamb Gas operated pump for hydrocarbon wells
CN201963266U (en) * 2010-12-22 2011-09-07 中国石油天然气集团公司 Underground double-pipe technological pipe column
CN205036364U (en) * 2015-08-06 2016-02-17 北京都市鼎点科技股份有限公司 Intelligent gas well row adopts raising output device and system
CN106437654A (en) * 2015-08-06 2017-02-22 迪瑞普技术(北京)有限公司 Intelligent gas well discharge and recovery production-increasing device
CN106150450A (en) * 2016-07-13 2016-11-23 西南石油大学 A kind of horizontal gas well machine water-pumping/draining gas production system
CN107120099A (en) * 2017-06-02 2017-09-01 四川瑞晟石油设备开发有限公司 A kind of Full-automatic drainage gas recovery facility

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何艳青等(课题负责人): "《世界石油工业关键技术专题研究》", 31 December 2003, 中国石油集团经济技术研究中心 *
曲占庆、薛建泉主编: "《深井泵采油》", 31 March 2012, 中国石油大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109798078A (en) * 2019-03-06 2019-05-24 中联煤层气有限责任公司 Coal bed gas horizontal well cave sand buries workover process
CN109798078B (en) * 2019-03-06 2020-08-11 中联煤层气有限责任公司 Coal bed gas horizontal well cave sand-buried well repairing process
CN110593822A (en) * 2019-09-27 2019-12-20 西南石油大学 Method for removing accumulated liquid at bottom of water-gas-producing well
CN112832702A (en) * 2021-02-04 2021-05-25 西南石油大学 Foam drainage gas production-sand washing integrated device and process thereof
CN112832702B (en) * 2021-02-04 2022-04-08 西南石油大学 Foam drainage gas production-sand washing integrated device and process thereof

Similar Documents

Publication Publication Date Title
US11053927B2 (en) Underground energy generating method
CN204252967U (en) Hot dry rock multi cycle heating system
CN110644963B (en) Method for exploiting hydrate based on multilateral well
CN103306643B (en) A kind of water drainage gas production device and method
CN102720453B (en) Method and device for mechanically removing sand and draining liquid from pit shaft of oil/gas well in underbalanced state
CN105625993B (en) Hot dry rock multi-cycle heating system and its production method
CN108386167A (en) Horizontal well water pumping gas production completion tubular column and production method
RU2334867C1 (en) Method of simultaneous-separate operation of several payout beds and installation of well for implementation of this method
CN103388466A (en) Concentric pipe hydraulic jet coal dust washing downhole device
RU2296213C2 (en) Packer pumping plant for well formations operation
CN112267854A (en) Device and process for exploiting deep sea combustible ice by adopting decompression method
CN201874543U (en) Underground boosting water injection process pipe string
CN109915082A (en) A kind of device and method for exploiting Offshore Heavy Oil Field oil reservoir
US4359092A (en) Method and apparatus for natural gas and thermal energy production from aquifers
CN210033856U (en) Automatic desilting silt pump and rig
CN105089562A (en) Preheating variable-frequency injection unblocking process system for water injection well
CN111911117A (en) Combustible ice exploitation pipe column heated by stratum energy and operation method thereof
CN201972681U (en) Heat injection and mechanical oil extraction integrated device
US20090044952A1 (en) Stationary slick line pumping method
CN203905910U (en) Ground-flow-free water injection string
RU2004126073A (en) METHOD FOR DEVELOPING DEPOSITS OF BITUMEN AND HIGH VISCOUS OILS AND THE COMPLEX SYSTEM OF EQUIPMENT, THEIR EQUIPMENT FOR ITS IMPLEMENTATION (OPTIONS)
CN113846968A (en) Lateral drilling branch well heat taking device and method suitable for hot dry rock development
RU105938U1 (en) DEVICE FOR FLUID PUMPING INTO A WELL
CN208950558U (en) Improve time dynamic layer flow string of the dynamic layer recovery ratio of oil reservoir time
CN201582226U (en) Centralizing pumping turbine pump for underground annuluses

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180810