CN201963315U - Mold-bagged grouting device for fast and uniformly reinforcing soft stratum - Google Patents

Mold-bagged grouting device for fast and uniformly reinforcing soft stratum Download PDF

Info

Publication number
CN201963315U
CN201963315U CN 201020667957 CN201020667957U CN201963315U CN 201963315 U CN201963315 U CN 201963315U CN 201020667957 CN201020667957 CN 201020667957 CN 201020667957 U CN201020667957 U CN 201020667957U CN 201963315 U CN201963315 U CN 201963315U
Authority
CN
China
Prior art keywords
grouting
pipe
unit
grouting unit
once
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201020667957
Other languages
Chinese (zh)
Inventor
杨毅
干昆蓉
李治国
邹翀
尹龙
任彦超
陈飞
牟松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technology Research of China Railway Tunnel Group Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN 201020667957 priority Critical patent/CN201963315U/en
Application granted granted Critical
Publication of CN201963315U publication Critical patent/CN201963315U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model provides a mold-bagged grouting device for fast and uniformly reinforcing a soft stratum, which belongs to the soft wall rock reinforcement and improvement technology in a tunnel and underground engineering, and comprises a primary grouting unit and a secondary grouting unit, wherein a plurality of grout outlet holes (2) are formed on the pipe wall of a grouting pipe (1) of the secondary grouting unit, a mold bag (3) is sheathed on the grouting pipe (1) of the secondary grouting unit, and in addition, both ends of the mold bag are tightly hooped on the grouting pipe; a pre-tightening unit consisting of a pad plate (7) and a screw nut (8) is sheathed on the grouting pipe (1) of the secondary grouting unit in a hole opening position, and the other end of the grouting pipe (1) of the secondary grouting unit is connected with a secondary grouting pipeline through two ball valves; and the primary grouting unit is provided with a grouting device consisting of a double-bag grouting bolt plug (14), a primary grouting unit grout conveying steel pipe (17) and a manual pump. The mold-bagged grouting device has the advantages that the fast and uniform reinforcement of soft wall rock can be realized, the physical mechanic index of the soft wall rock is improved, the stability of the soft wall rock is improved, simultaneously, the control region grouting is realized, and the grout loss is avoided.

Description

A kind of mould bag grouting device of evenly reinforcing soft stratum fast
Technical field
The utility model belongs to the reinforcing and the improving technology of tunnel and underground construction weak surrounding rock, mainly proposes a kind of mould bag grouting device of evenly reinforcing soft stratum fast.
Background technology
Carry out tunnel and underground engineering construction at soft stratum especially soil layer, often cause the stratum loss because of excavation construction, the country rock large deformation takes place or cave in, seriously jeopardize constructor and device security, and because of the stratum loss causes that ground settlement is excessive, cause surrounding enviroment to damage, bring for resident's normal production and living and have a strong impact on.For guaranteeing construction safety, reduce the influence of Construction on Environment as far as possible, the at present both at home and abroad normal grouting and reinforcing method that adopts comprises that modes such as rotary jet grouting, tube shed grouting, grouting with small pipe reinforce in advance to the stratum.In traditional grouting and reinforcing, the diffusion of slurries in the stratum has randomness, dispersiveness, be difficult to realize control territory slip casting, the waste of slurries is bigger, therefore can't realize the even reinforcing to the stratum, in addition, because grouting and reinforcing long construction period, less economical, have a strong impact on and restricting the construction period, be unfavorable for the stable of surrounding enviroment.
Summary of the invention
The purpose of this utility model promptly is to propose a kind of mould bag grouting device of evenly reinforcing soft stratum fast, make its quick, evenly reinforcing that can realize soft stratum, improve the mechanics index of physics of country rock, increase its stability, simultaneously can realize controlling territory slip casting, avoid the loss of slurries.
The utility model is finished its invention task by the following technical solutions:
A kind of mould bag grouting device of evenly reinforcing soft stratum fast has once grouting unit and secondary grouting unit; Described secondary grouting unit has the more piece Grouting Pipe; Have some apertures as a slurry outlet on the tube wall of described secondary grouting unit Grouting Pipe, described slurry outlet is step-like, and little hole area 3/4 adopt the mode of album leave round iron sheet to cover, make it have non-return valve function; On the Grouting Pipe of secondary grouting unit, be nested with the mould bag, make the two ends of described mould bag and Grouting Pipe paste tight and be nested with high-strength rubber ring, with mould bag two ends banding on Grouting Pipe; To constitute the secondary grouting unit by connecting between secondary grouting unit Grouting Pipe and the formed a plurality of base units of mould bag; Has the secondary slurry outlet on the secondary grouting unit Grouting Pipe between adjacent two mould bags; The front end of described secondary grouting unit is the pyramidal structure of sealing, be nested with the preload unit of being made up of backing plate and nut on the secondary grouting unit of position, aperture Grouting Pipe, the other end of described secondary grouting unit Grouting Pipe is connected with the secondary grouting pipeline by two ball valves; Described once grouting unit has the grouting device that two capsule slip casting embolisms, once grouting unit defeated slurry steel pipe and handlance constitute; Described once grouting unit defeated slurry steel pipe is made of more piece, at once grouting unit front end is outlet pipe, have a plurality of bar shaped slurry outlets along circumference on the middle part tube wall of described outlet pipe, two rubber bag tanks of described pair of capsule slip casting embolism lay respectively at the two ends of outlet pipe; The front end grout outlet of once grouting unit defeated slurry steel pipe is positioned at outlet pipe, and the rear end is connected with the once grouting pipeline; Described handlance connects water-supply-pipe and the front end of water-supply-pipe is communicated with two rubber bag tanks of two capsule slip casting embolisms.
The utility model proposes a kind of mould bag grouting device of evenly reinforcing soft stratum fast, during slip casting rear slurry enter and filling mould bag make its expansion, compacted stratum, because of slurries all are positioned at the mould bag, so can avoid slurries directly to enter the stratum, realization slip casting process does not have slurries loss and control territory, reaches fast, evenly reinforces soft stratum, increases its stable requirement.
Description of drawings
Fig. 1 is a scheme of installation of the present utility model;
Fig. 2 is the slurry outlet schematic diagram;
Fig. 3 is high-strength rubber ring sectional drawing;
Fig. 4 is the vertical view of Fig. 3;
Fig. 5 is fastening locating part sectional drawing;
Fig. 6 is the vertical view of Fig. 5;
Fig. 7 is the backing plate sectional drawing;
Fig. 8 is the vertical view of Fig. 7;
Fig. 9 is two capsule slip casting embolism structure schematic diagrames.
Among the figure: 1, secondary grouting unit Grouting Pipe, 2, slurry outlets, 3, the mould bag, 4, high-strength rubber ring, 5, fastening locating part, 6, joint, 7, backing plate, 8, nut, 9, first ball valve, 10, tee piece, 11, second ball valve, 12, the rapid setting cement volume, 13, concrete, 14, two capsule slip casting embolism, 15, rubber bag tank, 16, water-supply-pipe, 17, the defeated slurry in once grouting unit steel pipe, 18, grout outlet, 19, pressure-relief valve, 20, be communicated with steel pipe, 21, thin round iron sheet, 22, the secondary slurry outlet.
The specific embodiment
In conjunction with the accompanying drawings the utility model embodiment is illustrated:
As shown in Figure 1, a kind of mould bag grouting device of evenly reinforcing soft stratum fast has once grouting unit and secondary grouting unit; Described secondary grouting unit has the more piece Grouting Pipe; Have some apertures as a slurry outlet 2 on the tube wall of described secondary grouting unit Grouting Pipe 1, a described slurry outlet 2 is step-like, and 3/4 album leave round iron sheet 21 of little hole area, makes it have non-return valve function; On secondary grouting unit Grouting Pipe 1, be nested with mould bag 3, make the two ends of described mould bag and Grouting Pipe paste tight and be nested with high-strength rubber ring 4, by fastening locating part 5 with mould bag two ends banding on secondary grouting unit Grouting Pipe 1; To constitute the secondary grouting unit by connecting by joint 6 between once grouting unit Grouting Pipe and the formed a plurality of base units of mould bag; Has secondary slurry outlet 22 on the secondary grouting unit Grouting Pipe between adjacent two mould bags; The front end of described secondary grouting unit is the pyramidal structure of sealing, be nested with the preload unit of being made up of backing plate 7 and nut 8 on the secondary grouting unit of position, aperture Grouting Pipe 1, the other end of described secondary grouting unit Grouting Pipe 1 is connected with the secondary grouting pipeline by first ball valve 9, second ball valve 11; Described once grouting unit has the grouting device that two capsule slip casting embolisms 14, once grouting unit defeated slurry steel pipe 17 and handlance constitute; Described once grouting unit defeated slurry steel pipe 17 is made of more piece, at once grouting unit front end is outlet pipe, have a plurality of bar shaped slurry outlets along circumference on the middle part tube wall of described outlet pipe, two rubber bag tanks 15 of described pair of capsule slip casting embolism 17 lay respectively at the two ends of outlet pipe; The front end grout outlet 18 of once grouting unit defeated slurry steel pipe 17 is positioned at outlet pipe, and the rear end is connected with the once grouting pipeline; Described handlance connects water-supply-pipe 16 and the front end of water-supply-pipe is communicated with two rubber bag tanks 15 of two capsule slip casting embolisms.
The concrete operations step of the utility model device is:
1) measures and writes down the distance of the point midway of each slurry outlet 2 length range on the secondary grouting unit Grouting Pipe 1 apart from the secondary grouting unit Grouting Pipe mouth of pipe; Rapid setting cement volume 12 after utilizing tamper with some immersions is sent into the boring end and is made certain hour firm by ramming by propping up, secondary grouting unit Grouting Pipe 1 is placed boring, make secondary grouting unit Grouting Pipe front end by the rapid setting cement volume and hole wall stratum anchoring of the boring end after making firm by ramming, the place, aperture of boring adopts concrete 13 to fill, backing plate 7 closed orifices of preload unit are also tightened nut 8 on the preload unit to design torque, and the soil body is applied pretightning force;
2) by from the bottom of the hole to the aperture successively to each mould bag slip casting: stretch in the secondary grouting unit Grouting Pipe 1 length that also measurement is stretched into after two capsule slip casting embolisms 14 and some once grouting unit defeated slurry steel pipe 17 is connected, make the middle part of once grouting unit front end outlet pipe corresponding with a slurry outlet 2 of secondary grouting unit Grouting Pipe, it is closely connected to utilize handlance that two rubber bag tanks 15 of two capsule slip casting embolisms are expanded to secondary grouting unit Grouting Pipe inwall, realizes ending the slurry effect; The rear end of once grouting unit defeated slurry steel pipe 17 connects the once grouting pipeline and carries out the slip casting of mould bag, slurries are flowed out by a plurality of bar shaped slurry outlets of once grouting unit front end outlet pipe, and flow out filling mould bags 3 by the slurry outlet 2 of secondary grouting unit Grouting Pipe the mould bag is expanded, compacted stratum stops slip casting when filling the design grouting amount; By the pressure-relief valve 19 removal grouting pipeline internal pressures that are provided with on the once grouting unit defeated slurry steel pipe, utilize the pressure-relief valve of handlance to make two capsule slip casting embolism releases again, two rubber bag tanks 15 of two capsule slip casting embolisms and secondary grouting unit Grouting Pipe inwall are broken away from; Successively all the other each mould bags are carried out slip casting by said process, after all mould bag slip castings finish, withdraw from the grouting device of two capsule slip casting embolisms 14, once grouting unit defeated slurry steel pipe 17 and handlance formation and finish once grouting;
3) Grouting Pipe 1 rear end, secondary grouting unit being connected behind first ball valve 9 is connected with the secondary grouting pipeline with second ball valve 11 respectively by tee piece 10 again; Open first ball valve 9, second ball valve 11 carries out secondary grouting, slurries are flowed out by the secondary slurry outlet on the secondary grouting unit Grouting Pipe between adjacent two mould bags 22, the boring between the filling mould bag; When second ball valve 11 of slurries from Grouting Pipe rear end, secondary grouting unit flows out, close this ball valve, continue slip casting and behind the design grouting pressure, close first ball valve 9; Open second ball valve, the 11 removal grouting pipeline internal pressures of Grouting Pipe rear end, secondary grouting unit, remove grouting pipeline, promptly finish whole slip casting process.

Claims (1)

1. a mould bag grouting device of evenly reinforcing soft stratum fast is characterized in that: have once grouting unit and secondary grouting unit; Described secondary grouting unit has the more piece Grouting Pipe; Have some apertures as a slurry outlet (2) on the tube wall of the Grouting Pipe (1) of described secondary grouting unit, described slurry outlet is step-like, and the mode of 3/4 employing album leave round iron sheet of little hole area covers; On the Grouting Pipe (1) of secondary grouting unit, be nested with mould bag (3), make the two ends of described mould bag and Grouting Pipe paste tight and be nested with high-strength rubber ring (4), with mould bag two ends banding on Grouting Pipe; To constitute the secondary grouting unit by connecting between secondary grouting unit Grouting Pipe and the formed a plurality of base units of mould bag; Has secondary slurry outlet (22) on the secondary grouting unit Grouting Pipe (1) between adjacent two mould bags; The front end of described secondary grouting unit is the pyramidal structure of sealing, be nested with the preload unit of being made up of backing plate (7) and nut (8) on the secondary grouting unit of position, aperture Grouting Pipe (1), the other end of described secondary grouting unit Grouting Pipe (1) is connected with the secondary grouting pipeline by first ball valve (9), second ball valve (11); Described once grouting unit has the grouting device that two capsule slip casting embolisms (14), once grouting unit defeated slurry steel pipe (17) and handlance constitute; Described once grouting unit defeated slurry steel pipe (17) is made of more piece, at once grouting unit front end is outlet pipe, have a plurality of bar shaped slurry outlets along circumference on the middle part tube wall of described outlet pipe, two rubber bag tanks (15) of described pair of capsule slip casting embolism lay respectively at the two ends of outlet pipe; The front end grout outlet of once grouting unit defeated slurry steel pipe (17) is positioned at outlet pipe, and the rear end is connected with the once grouting pipeline; Described handlance connects water-supply-pipe (16) and the front end of water-supply-pipe is communicated with two rubber bag tanks (15) of two capsule slip casting embolisms.
CN 201020667957 2010-12-20 2010-12-20 Mold-bagged grouting device for fast and uniformly reinforcing soft stratum Expired - Fee Related CN201963315U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020667957 CN201963315U (en) 2010-12-20 2010-12-20 Mold-bagged grouting device for fast and uniformly reinforcing soft stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020667957 CN201963315U (en) 2010-12-20 2010-12-20 Mold-bagged grouting device for fast and uniformly reinforcing soft stratum

Publications (1)

Publication Number Publication Date
CN201963315U true CN201963315U (en) 2011-09-07

Family

ID=44525850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020667957 Expired - Fee Related CN201963315U (en) 2010-12-20 2010-12-20 Mold-bagged grouting device for fast and uniformly reinforcing soft stratum

Country Status (1)

Country Link
CN (1) CN201963315U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003189A (en) * 2010-12-20 2011-04-06 中铁隧道集团有限公司 Mold bag grouting method and device for quickly and uniformly reinforcing soft stratum
CN102409664A (en) * 2011-12-10 2012-04-11 中国建筑西南勘察设计研究院有限公司 Multi-pore parallel and synchronous grouting device
CN104164865A (en) * 2014-07-31 2014-11-26 沈嘉艳 Grouting air cushion plug
CN109162722A (en) * 2018-10-11 2019-01-08 中国石油大学(华东) It is applicable in the advanced compacting grouting and reinforcing method in loose weak stratum of shallow-depth-excavation tunnel

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102003189A (en) * 2010-12-20 2011-04-06 中铁隧道集团有限公司 Mold bag grouting method and device for quickly and uniformly reinforcing soft stratum
CN102409664A (en) * 2011-12-10 2012-04-11 中国建筑西南勘察设计研究院有限公司 Multi-pore parallel and synchronous grouting device
CN104164865A (en) * 2014-07-31 2014-11-26 沈嘉艳 Grouting air cushion plug
CN104164865B (en) * 2014-07-31 2019-07-19 沈嘉艳 Slip casting air cushion plug
CN109162722A (en) * 2018-10-11 2019-01-08 中国石油大学(华东) It is applicable in the advanced compacting grouting and reinforcing method in loose weak stratum of shallow-depth-excavation tunnel

Similar Documents

Publication Publication Date Title
CN102003189A (en) Mold bag grouting method and device for quickly and uniformly reinforcing soft stratum
CN201172828Y (en) Well-covering device for dewatering well
CN104389314B (en) A kind of shallow clay grouting and reinforcing device and method
CN105200978B (en) A kind of protrusive localization two-liquid grouting device and construction method
CN201133248Y (en) Orifice sealed double tube back type grouting device
CN201963315U (en) Mold-bagged grouting device for fast and uniformly reinforcing soft stratum
CN101761345A (en) Reinforcement device for tunnel top soil and construction method thereof
CN205918368U (en) Bore notes an organic whole and retreat formula slip casting drilling rod
CN204662431U (en) A kind of filling pile ' s after grouting control valve with backstop structure
CN106703010B (en) A kind of no sheath body bed of material sleeve valve barrel grouting rapid constructing method
CN105064280A (en) Tunnel underground river water burst blockage construction method
CN108868827A (en) Km deep-well high-ground stress combination of steel rope injection hole sealing device and method for sealing
CN201129184Y (en) Tubule external valve one-way type subsection back grouting apparatus
CN201165660Y (en) Steel pipe hole bottom grouting apparatus
CN207647512U (en) A kind of push pipe export & import antipriming
CN201401178Y (en) Grouting device for mine and underground water plugging
CN104895086A (en) Manual grouting layer method pile toe three-dimensional post-pressure grouting structure and pouring method
CN103174135B (en) Repair method of unqualified post-grouting bored concrete pile
CN207111120U (en) A kind of pre-embedded device for TBM synchronization lining chassis grout holes and osculum
CN103867221A (en) Advanced supporting and protecting radial grouting anchoring rod and construction method of advanced supporting and protecting radial grouting anchoring rod
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN204252139U (en) Be applied to the two-layer equation film bagging apparatus of Grouting Pipe sealing in water burst sandy soils
CN205475198U (en) Karst area solution cavity coats soil layer slip casting reinforcing apparatus
CN210483732U (en) Shield constructs to receive with pre-buried steel ring slip casting sealing device
CN214940308U (en) Device for plugging structural bottom plate precipitation well pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY TUNNEL GROUP TECHNOLOGY RESEARCH CO.

Free format text: FORMER OWNER: ZHONGTIE TUNNEL GROUP CO., LTD.

Effective date: 20140603

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140603

Address after: 471009 Luoyang City, the old town of Henan champion Red Road, No. 3

Patentee after: China Railway Tunnel Group Technology Research Co., Ltd.

Address before: 471009 Henan province Luoyang Xigong Cemetery Road No. 3 in group

Patentee before: Zhongtie Tunnel Group Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110907

Termination date: 20181220