Slip casting air cushion plug
Affiliated technical field
The present invention relates to a kind of building machinery, relate in particular to a kind ofly in the time of underground grout injection, for preventing that slurries from emerging, between feed pipe for mortar and hole wall, set up the slip casting air cushion plug of air cushion sealing plug.
Background technology
Often will be at underground grout injection on building site, but in ground stabilization mortar depositing construction, to inject to underground deep layer, because of Grouting Pipe and the gapped pressure relieve of hole wall, cause slurries in hole grout, can affect like this spray head cement paste the effect to bottom surrounding uniformly penetrating, especially in hardpan construction, can produce a large amount of grouts in hole, poor effect.Workpeople is also this thing headache worry, because can affect foundation quality when serious, causes serious consequence.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art part, provide a kind of in the time of underground grout injection, for preventing that slurries from emerging, between feed pipe for mortar and hole wall, set up the slip casting air cushion plug of air cushion sealing plug.
The technical solution adopted for the present invention to solve the technical problems is: a kind of slip casting air cushion plug, comprise ground and stratum, the fixing grouting pump of ground right side of face, grouting pump connects feed pipe for mortar, feed pipe for mortar is arranged in hole, hole is drilled in the middle of stratum, feed pipe for mortar bottom connects spray head, it below spray head, is cement paste, the tube wall surrounding of the junction of spray head and feed pipe for mortar is equipped with air cushion sealing plug, air cushion sealing plug end face is fixedly connected with tracheae, and tracheae is fixedly connected with air compressor machine, and air compressor machine is fixed on the ground in grouting pump left side.The inwall of air cushion sealing plug is wrapped in the surrounding of feed pipe for mortar, and the outer wall of air cushion sealing plug connects the inwall in hole.Air cushion sealing plug can be made with rubber, air cushion sealing plug be shaped as hollow column type gasbag.
The invention has the beneficial effects as follows, between Grouting Pipe and hole wall, set up air cushion sealing plug, can prevent that slurries from emerging, slip casting air cushion plug is in order to prevent due between misunderstanding each other between Grouting Pipe and hole wall, the grout causing because of pressure relieve.Between Grouting Pipe and hole wall, set up air cushion sealing plug, when Grouting Pipe stretch into underground after, seal gap to air cushion sealing plug inflation with air compressor machine, be full of air cushion sealing plug after gas and block gap and form back pressure, force slurries uniformly penetrating bottom surrounding.Complete after grouting, the venting of air cushion sealing plug is risen to half meter together with spray head, then inflate post-grouting, so repeatedly until hole makes whole grouting be divided into even reinforcing.The large palpulus of air cushion plug determines according to the size in Grouting Pipe and Dong Bi gap.Such grouting just can be guaranteed quality.
Brief description of the drawings
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is the construction sectional structure chart of embodiments of the invention one.
Fig. 2 is air cushion sealing plug and the spray head three-dimensional structure diagram of embodiments of the invention one.
Fig. 3 is that air cushion sealing plug and the spray head of embodiments of the invention one faced structure chart.
Fig. 4 is air cushion sealing plug and the spray head plan structure figure of embodiments of the invention one.
In figure: 1. grouting pump, 2. air compressor machine, 3. tracheae, 4. ground, 5. air cushion sealing plug, 6. spray head, 7. cement paste, 8. stratum, 9. hole, 10. feed pipe for mortar.
Detailed description of the invention
Fig. 1, Fig. 2, Fig. 3, embodiment illustrated in fig. 4 in, be provided with grouting pump (1), air compressor machine (2), tracheae (3), ground (4), air cushion sealing plug (5), spray head (6), cement paste (7), stratum (8), hole (9), feed pipe for mortar (10).
Implement slip casting air cushion plug of the present invention, comprise ground (4) and stratum (8), grouting pump (1) is fixed on right side, ground (4), grouting pump (1) connects feed pipe for mortar (10), feed pipe for mortar (10) is arranged in hole (9), hole (9) is placed in the middle of stratum (8), feed pipe for mortar (10) bottom connects spray head (6), spray head (6) is cement paste (7) below, spray head (6) is equipped with air cushion sealing plug (5) with the tube wall surrounding of feed pipe for mortar (10) junction, air cushion sealing plug (5) end face is fixedly connected with tracheae (3), tracheae (3) is fixedly connected with air compressor machine (2), air compressor machine (2) is fixed on the ground (4) in grouting pump (1) left side.The inwall of air cushion sealing plug (5) is wrapped in the surrounding of feed pipe for mortar (10), and the outer wall of air cushion sealing plug (5) connects the inwall in hole (9).Air cushion sealing plug (5) can be made with rubber, air cushion sealing plug (5) be shaped as hollow column type gasbag.
Implement slip casting air cushion plug of the present invention, between Grouting Pipe and hole wall, set up air cushion sealing plug, can prevent that slurries from emerging, slip casting air cushion plug is in order to prevent due between misunderstanding each other between Grouting Pipe and hole wall, the grout causing because of pressure relieve.Between Grouting Pipe and hole wall, set up air cushion sealing plug, when Grouting Pipe stretch into underground after, seal gap to air cushion sealing plug inflation with air compressor machine, be full of air cushion sealing plug after gas and block gap and form back pressure, force slurries uniformly penetrating bottom surrounding.Complete after grouting, the venting of air cushion sealing plug is risen to half meter together with spray head, then inflate post-grouting, so repeatedly until hole makes whole grouting be divided into even reinforcing.The large palpulus of air cushion plug determines according to the size in Grouting Pipe and Dong Bi gap.Such grouting just can be guaranteed quality.
Implement slip casting air cushion plug of the present invention, the similar leather bag of air cushion sealing plug, does not make cement paste up emit for sealing hole wall after inflation.Tracheae is used for filling gases at high pressure, and spray head is toward spray cement grout under bottom.The present invention can effectively prevent from producing adverse current at the cement paste of underground filling because pressure diminishes, and causes ground slurry infiltration inequality around.When use, complete backward first rice of slip casting, then running repeatedly, can make entirely layer evenly be reinforced by layering so at every turn.
Implement the present invention, effect is fine.