CN201963286U - Oil production pipe for reducing water content of central pipe of horizontal well - Google Patents

Oil production pipe for reducing water content of central pipe of horizontal well Download PDF

Info

Publication number
CN201963286U
CN201963286U CN2011200628760U CN201120062876U CN201963286U CN 201963286 U CN201963286 U CN 201963286U CN 2011200628760 U CN2011200628760 U CN 2011200628760U CN 201120062876 U CN201120062876 U CN 201120062876U CN 201963286 U CN201963286 U CN 201963286U
Authority
CN
China
Prior art keywords
horizontal well
pipe
oil
central tube
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200628760U
Other languages
Chinese (zh)
Inventor
韩岐清
刘琳
黄桦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN2011200628760U priority Critical patent/CN201963286U/en
Application granted granted Critical
Publication of CN201963286U publication Critical patent/CN201963286U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Extraction Or Liquid Replacement (AREA)

Abstract

The horizontal well central tube reduces the oil production pipe column containing water, and is applied to oil field horizontal well oil production. The lower part of a sleeve of the horizontal section of the horizontal well is connected with a sieve tube, and the outside of the sieve tube is provided with a sleeve outer packer; the lower end of the sieve tube is connected with a bottom plug; an oil pipe and an oil extraction pump are arranged in the straight well section of the horizontal well and in the sleeve; the method is characterized in that: the lower end of the oil extraction pump is connected with a lower pump central pipe, and the lower pump central pipe is a front-section blind pipe, a perforated central pipe and a tail-end blind pipe in the horizontal section of the horizontal well; the lower end of the front-section blind pipe is connected with a perforated central pipe, and the lower end of the perforated central pipe is connected with a tail-end blind pipe. The effect is as follows: the central pipe with a certain length is arranged below the horizontal section of the horizontal well, so that the existing flowing pressure distribution of the horizontal well is disturbed, and the liquid production capacity of the main water outlet layer section of the horizontal well is reduced by adjusting the uniformity of a liquid production section, so that the water reduction and oil increase of the horizontal well are realized.

Description

The horizontal well central tube reduces moisture flow string
Technical field
The utility model relates to oil field oil recovery professional skill field, and particularly the horizontal well production tubing string is a kind of moisture flow string of horizontal well that reduces
Background technology
In the horizontal well production later stage, crude oil water containing progressively raises.It is moisture to adopt shutoff method to reduce.Water blockoff generally adopts machinery and two kinds of methods of chemical water shutoff, the perforated pipe of oil field researcher design, the well-completing process tubing string of blind pipe fit tube external packer can effectively delay bottom water coning, but tubing string technology more complicated and be mainly used in horizontal well completion in early stage.
At present, some oil fields are in the bottom water reservoir horizontal wells high water-cut development later stage, by adding central tube method, realize reducing the moisture purpose of horizontal well.The method is primarily aimed at sieve tube completion, can't be applied to control the horizontal well of water measure.
The utility model content
The purpose of this utility model is: provide a kind of horizontal well central tube to reduce moisture flow string, be lowered to the central tube (punching oil pipe) of certain-length by horizontal segment at horizontal well, the existing flowing pressure of interference level well distributes, by adjusting the production profile uniformity liquid-producing capacity of the main water exit interval of horizontal well is lowered, thereby realize the horizontal well decreasing water cut and increasing oil.Solve the problem that the moisture rising of horizontal well bottom water reservoir is fast, later development is of poor benefits.
The technical solution adopted in the utility model is: the horizontal well central tube reduces moisture flow string, mainly by sleeve pipe, oil pipe, oil extraction pump, screen casing, external casing packer, the end, is stifled and the pump lower center tube is formed; Sleeve pipe is arranged in horizontal well, be connected with screen casing, external casing packer is arranged, screen casing is fixed in the horizontal well by external casing packer in the screen casing outside in the bottom of the sleeve pipe of the horizontal segment of horizontal well; Be connected with the end in the lower end of screen casing stifled; In the straight well section of horizontal well and oil pipe is arranged in sleeve pipe, be connected with oil extraction pump in the lower end of oil pipe, can be pumped into ground to well liquid by oil extraction pump.It is characterized in that: be connected with the pump lower center tube in the lower end of oil extraction pump, described pump lower center tube is leading portion blind pipe, porose central tube and tail end blind pipe at the horizontal segment of horizontal well; Connect porose central tube in the lower end of leading portion blind pipe, the lower end of porose central tube connects the tail end blind pipe.After the lower end of oil extraction pump connects central tube, reach the purpose of adjusting production profile by optimizing central tube length and structure, realize decreasing water cut and increasing oil.
The position of described porose central tube is in screen casing.Be that porose central tube is relative with screen casing.
Described porose central tube is that to be evenly distributed with diameter on tube wall be 8~15 millimeters through hole, and the density of through hole is every meter 10~20 hole.
The horizontal well central tube reduces moisture principle: predict by real standard well production profile, judge the higher well fragment position of production fluid influx, the section that general production fluid is high also is simultaneously the main contribution section of water, just can reach the purpose of oil increasing precipitation by the production fluid amount that reduces the high influx section of production fluid.For the horizontal well of high water-cut stage, when recovering the oil, central tube mainly considers to reduce the liquid contribution of influx upper sector, and the production profile uniformity coefficient is less important consideration; The horizontal well of the low Water-cut Period of centering promptly will consider to reduce the production fluid influx, considers each section of pit shaft flow uniformity coefficient again.Adopt central tube to recover the oil in the bottom water reservoir horizontal well development later stage, can reach the purpose of oil increasing precipitation.
The beneficial effects of the utility model: the utility model horizontal well central tube reduces moisture flow string, be lowered to the central tube (punching oil pipe) of certain-length by horizontal segment at horizontal well, the existing flowing pressure of interference level well distributes, by adjusting the production profile uniformity liquid-producing capacity of the main water exit interval of horizontal well is lowered, thereby realize the horizontal well decreasing water cut and increasing oil.Solve oil recovery bottleneck problems such as the moisture rising of horizontal well bottom water reservoir is fast, the water logging of solution horizontal well.Central tube 11 wells that recover the oil are used in test on the bottom water reservoir horizontal well of oil field, have 10 mouthfuls of wells to see comparatively significantly oil increasing precipitation effect, and average day produce oil of initial stage is brought up to 6.6 tons from 3.82 tons, and comprehensive water cut reduces to 93.46% by 96.5%.
Description of drawings
Fig. 1 is that the utility model horizontal well central tube reduces moisture flow string structural profile schematic diagram.
Among the figure, the 1-sleeve pipe, the 2-oil pipe, the 3-oil extraction pump, the 4-screen casing, the 5-external casing packer, stifled at the bottom of the 6-, 7-pump lower center tube, 8-leading portion blind pipe, the porose central tube of 9-, 10-tail end blind pipe.
The specific embodiment
Embodiment 1: reducing moisture flow string with a horizontal well central tube is example, and the utility model is described in further detail.
Consult Fig. 1.The utility model horizontal well central tube reduces moisture flow string, mainly is made up of sleeve pipe 1, oil pipe 2, oil extraction pump 3, screen casing 4, external casing packer 5, the end stifled 6 and pump lower center tube 7.Sleeve pipe 1 is arranged in horizontal well, be connected with screen casing 4, external casing packer 5 is arranged, screen casing 4 is fixed in the horizontal well by external casing packer 5 in screen casing 4 outsides in the bottom of the sleeve pipe 1 of the horizontal segment of horizontal well; Be connected with the end stifled 6 in the lower end of screen casing 4; In the straight well section of horizontal well and oil pipe 2 is arranged, be connected with oil extraction pump 3 in the lower end of oil pipe 2 in sleeve pipe 1.Oil extraction pump 3 is rod pumping pumps.
Be connected with pump lower center tube 7 in the lower end of oil extraction pump 3, central tube 7 is that internal diameter is that 62 millimeters, external diameter are 73 millimeters plain tubing.Described pump lower center tube 7 has leading portion blind pipe 8, porose central tube 9 and tail end blind pipe 10 3 parts to connect at the horizontal segment of horizontal well.Connect porose central tube 9 in the lower end of leading portion blind pipe 8, the lower end of porose central tube 9 connects tail end blind pipe 10.The length of leading portion blind pipe 8 is 112 meters, and the length of porose central tube 9 is 158 meters, and the length of tail end blind pipe 10 is 93 meters.
The position of porose central tube 9 is in screen casing 4.Be that porose central tube 9 is relative with screen casing 4.Be evenly distributed with diameter and be 13 millimeters through hole on the tube wall of porose central tube 9, the density of through hole is every meter 16 hole.

Claims (3)

1. a horizontal well central tube reduces moisture flow string, mainly is made up of sleeve pipe (1), oil pipe (2), oil extraction pump (3), screen casing (4), external casing packer (5), the end stifled (6) and pump lower center tube (7); Sleeve pipe (1) is arranged in horizontal well, be connected with screen casing (4), external casing packer (5) is arranged, screen casing (4) is fixed in the horizontal well by external casing packer (5) in screen casing (4) outside in the bottom of the sleeve pipe (1) of the horizontal segment of horizontal well; Be connected with the end stifled (6) in the lower end of screen casing (4); In the straight well section of horizontal well and oil pipe (2) is arranged, be connected with oil extraction pump (3) in the lower end of oil pipe (2) in sleeve pipe (1); It is characterized in that: be connected with pump lower center tube (7) in the lower end of oil extraction pump (3), described pump lower center tube (7) is leading portion blind pipe (8), porose central tube (9) and tail end blind pipe (10) at the horizontal segment of horizontal well; Connect porose central tube (9) in the lower end of leading portion blind pipe (8), the lower end of porose central tube (9) connects tail end blind pipe (10).
2. horizontal well central tube according to claim 1 reduces moisture flow string, and it is characterized in that: the position of described porose central tube (9) is in screen casing (4).
3. horizontal well central tube according to claim 1 reduces moisture flow string, it is characterized in that: described porose central tube (9) is that to be evenly distributed with diameter on tube wall be 8~15 millimeters through hole, and the density of through hole is every meter 10~20 hole.
CN2011200628760U 2011-03-10 2011-03-10 Oil production pipe for reducing water content of central pipe of horizontal well Expired - Lifetime CN201963286U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200628760U CN201963286U (en) 2011-03-10 2011-03-10 Oil production pipe for reducing water content of central pipe of horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200628760U CN201963286U (en) 2011-03-10 2011-03-10 Oil production pipe for reducing water content of central pipe of horizontal well

Publications (1)

Publication Number Publication Date
CN201963286U true CN201963286U (en) 2011-09-07

Family

ID=44525821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200628760U Expired - Lifetime CN201963286U (en) 2011-03-10 2011-03-10 Oil production pipe for reducing water content of central pipe of horizontal well

Country Status (1)

Country Link
CN (1) CN201963286U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625978A (en) * 2014-11-06 2016-06-01 中国石油天然气股份有限公司 Central pipe liquid control pipe column of horizontal well and liquid control pipe column process of horizontal well
CN106837262A (en) * 2017-04-14 2017-06-13 张兴 Horizontal well completion tubular pile and horizontal well
CN110821462A (en) * 2019-10-16 2020-02-21 新疆中凌工程技术有限公司 Method for drawing tail end of horizontal well group with interlayer in SAGD control well reservoir
CN111075363A (en) * 2019-11-28 2020-04-28 中国海洋石油集团有限公司 Horizontal well segmentation water control pipe post
CN113062733A (en) * 2021-04-13 2021-07-02 西南石油大学 Segmented horizontal well water control three-dimensional simulation experiment device and experiment method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625978A (en) * 2014-11-06 2016-06-01 中国石油天然气股份有限公司 Central pipe liquid control pipe column of horizontal well and liquid control pipe column process of horizontal well
CN105625978B (en) * 2014-11-06 2018-04-03 中国石油天然气股份有限公司 Central pipe liquid control pipe column of horizontal well and liquid control pipe column process of horizontal well
CN106837262A (en) * 2017-04-14 2017-06-13 张兴 Horizontal well completion tubular pile and horizontal well
CN110821462A (en) * 2019-10-16 2020-02-21 新疆中凌工程技术有限公司 Method for drawing tail end of horizontal well group with interlayer in SAGD control well reservoir
CN110821462B (en) * 2019-10-16 2022-03-25 新疆中凌工程技术有限公司 Method for drawing tail end of horizontal well group with interlayer in SAGD control well reservoir
CN111075363A (en) * 2019-11-28 2020-04-28 中国海洋石油集团有限公司 Horizontal well segmentation water control pipe post
CN113062733A (en) * 2021-04-13 2021-07-02 西南石油大学 Segmented horizontal well water control three-dimensional simulation experiment device and experiment method thereof
CN113062733B (en) * 2021-04-13 2022-04-12 西南石油大学 Segmented horizontal well water control three-dimensional simulation experiment device and experiment method thereof

Similar Documents

Publication Publication Date Title
CN201474673U (en) Oil production pipe column for sectional water control of horizontal well
CN201963286U (en) Oil production pipe for reducing water content of central pipe of horizontal well
CN206917640U (en) The steady oil system of offshore oilfield horizontal well automatic control water
CN101446281B (en) Drainage device for coal bed gas well electric submersible centrifugal pump
CN106651158B (en) Quantitative evaluation method for water injection development effectiveness degree of ultra-low permeability tight reservoir horizontal well
CN204941480U (en) The horizontal well completion sleeve pipe of segmentation exploitation and the tubing string of formation thereof can be realized
CN110761743A (en) Thick oil and thin oil mixed gas lift process pipe column and implementation method
CN112282721A (en) Optimal design method for fracturing fluid flowback system after fracturing of shale gas horizontal well
CN201810292U (en) Separated layer water injection process tubular column
CN104100237B (en) Drainage and mining method for coal-bed gas well
CN102817594B (en) Horizontal well water pumping gas production method and device
CN204126624U (en) Open-hole horizontal well fixed tubular column jetting sectional well completion fracturing string
CN113062733B (en) Segmented horizontal well water control three-dimensional simulation experiment device and experiment method thereof
CN203321507U (en) Water exploration pipe column for simultaneously monitoring subsection flow and water content of multi-section fractured horizontal well
CN201738906U (en) Thick oil dilution viscosity reduction lifting process pipe column
CN103122760B (en) Completion pipe string for suspending bottom water coning
CN203230415U (en) Staged simultaneous sampling water exploration pipe column for multi-stage fractured horizontal well
CN201517374U (en) Gas recovery well completion pipe string
CN202832453U (en) SAGD production well single oil pipe pump draws technology tubular column
CN205206799U (en) Self -cleaning embedded screen pipe of whirl
CN201144831Y (en) Coal bed gas well electric submersible centrifugal pump discharging and mining device
CN203961911U (en) The down-hole wax control instrument with sand-proof function
CN105089567B (en) Deep-well is adjustable low density flow quick fluid-discharge formation testing device and its operational method
CN208330325U (en) Oil production pipe and thickened oil exploitation device
CN101655007A (en) Well completion technique for efficiently controlling pressure and retaining water cone of horizontal well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20110907

CX01 Expiry of patent term