CN106837262A - Horizontal well completion tubular pile and horizontal well - Google Patents

Horizontal well completion tubular pile and horizontal well Download PDF

Info

Publication number
CN106837262A
CN106837262A CN201710244809.2A CN201710244809A CN106837262A CN 106837262 A CN106837262 A CN 106837262A CN 201710244809 A CN201710244809 A CN 201710244809A CN 106837262 A CN106837262 A CN 106837262A
Authority
CN
China
Prior art keywords
horizontal well
tubular pile
completion tubular
horizontal
well completion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710244809.2A
Other languages
Chinese (zh)
Inventor
张兴
赵新军
万学鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710244809.2A priority Critical patent/CN106837262A/en
Publication of CN106837262A publication Critical patent/CN106837262A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/02Subsoil filtering
    • E21B43/08Screens or liners
    • E21B43/086Screens with preformed openings, e.g. slotted liners
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/12Packers; Plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/128Adaptation of pump systems with down-hole electric drives

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The present invention provides a kind of horizontal well completion tubular pile and horizontal well, horizontal well completion tubular pile include positioned at net horizontal section screen casing (4) and be connected with the upper end of the screen casing (4) keep away water pipe (5) positioned at net horizontal section heel, it is described to keep away the pipeline section that water pipe (5) is less than the hole on the screen casing (4) for imporosity on perisporium or the hole on perisporium.The present invention provide horizontal well completion tubular pile and horizontal well, can equilibrium water horizontal well seepage field, be thus prevented effectively from the formation of local water cone, so as to delay the water breakthrough cycle of horizontal well, improve the development effectiveness of horizontal well.

Description

Horizontal well completion tubular pile and horizontal well
Technical field
The present invention relates to horizontal well completion technology, more particularly to a kind of horizontal well completion tubular pile and horizontal well.
Background technology
Application of the horizontal well development technology in modern oil gas field tends to normalization, by the drilling of net horizontal section, greatly Enhance the drainage area of single-well reservoir production unit, change the seepage flow mode of near wellbore fluid so that horizontal well is whole The producing pressure differential of body tends to relatively low and also can guarantee that normal production, and usual individual well drilling cost horizontal well is 1~3 times of straight well, and Well yield is 3~10 times of straight well yield.
But, in the horizontal well using electric submersible pump as artificial lifting way, because the suction force of electric submersible pump generation is in level Well section heel (namely straight well section and horizontal segment joint portion) is maximum, that is, producing pressure differential is maximum so that net horizontal section heel oozes Intensity of flow is higher than other net horizontal sections, also just because of the imbalance of its seepage field, it is easy to herein because producing pressure differential is larger Edge-bottom water is easily produced to advance by leaps and bounds or coning effect.Once water breakthrough, the product liquid of horizontal well will mainly thus break-through point supply, other Even if well section still has a large amount of remaining oils, but in view of the huge permeability contrast of water-oil phase, former in the case of high yield water Oil is difficult to continue output, causes horizontal well to rapidly enter the High water cut production phase, or even thoroughly by water logging.
The content of the invention
The present invention provides a kind of horizontal well completion tubular pile and horizontal well, to solve in the prior art using electric submersible pump as act Caused by the mode of liter Horizontal Well Flow it is uneven and easily produce side bottom advance by leaps and bounds or coning effect problem.
To achieve these goals, one aspect of the present invention provides a kind of horizontal well completion tubular pile, including positioned at net horizontal section Screen casing and the water pipe of keeping away positioned at net horizontal section heel that is connected with the upper end of the screen casing, the water pipe of keeping away is nothing on perisporium Pipeline section of the hole less than the hole on the screen casing on hole or perisporium.
Preferably, the horizontal well completion tubular pile also includes the first oil pipe, and water is kept away in one end of first oil pipe with described The upper end connection of pipe, the other end is connected with the production casing in vertical well section.
Preferably, first oil pipe is connected on the hanger set on the production casing.
Preferably, first oil pipe and described keeping away between water pipe are provided with the first packer.
Preferably, the horizontal well completion tubular pile also includes the second oil pipe of the lower end for being connected to the screen casing.
Preferably, the lower end of second oil pipe is connected with casing shoe.
Preferably, it is provided with the second packer on the outside of second oil pipe.
Preferably, the screen casing is wire-wrapped screen.
The horizontal well completion tubular pile that the present invention is provided, keeps away water pipe, it is possible to decrease due to electricity by being set in net horizontal section heel The excessive producing pressure differential of part produced by the suction force of latent pump, balances the seepage field of horizontal well.Thus office can be prevented effectively from The formation of portion's water cone, so as to delay the water breakthrough cycle of horizontal well, improves the development effectiveness of horizontal well.
According to another aspect of the present invention, a kind of horizontal well is also provided, water as described above is provided with the horizontal well Horizontal well completion tubular column.
Preferably, the straight well top of the horizontal well is provided with electric submersible pump.
Brief description of the drawings
Fig. 1 shows the structure that horizontal well completion tubular pile in an implementation method of the invention is set in horizontal well Schematic diagram;
Fig. 2 shows the signal of horizontal well seepage field in the case where the horizontal well completion tubular pile of present invention offer is provided with Figure.
Description of reference numerals:
1- casing shoes;The packers of 2- second;
The oil pipes of 3- second;4- screen casings;
5- keeps away water pipe;The packers of 6- first;
The oil pipes of 7- first;8- hangers;
9- immersible pumps;10- production casings.
Specific embodiment
In the present invention, in the case where opposite explanation is not made, the noun of locality for using is typically according to well such as " upper and lower " For depth, orientate as in the relatively shallow position of well " on ", and relatively deep position orientates D score as.For example, pipe " under End " is one end of the locations deep positioned at well of pipe, and " lower end " is positioned at the one end at the relatively shallow position of well.
The present invention provides a kind of horizontal well completion tubular pile, and the horizontal well completion tubular pile includes the screen casing 4 positioned at net horizontal section And be connected with the upper end of the screen casing 4 keep away water pipe 5 positioned at net horizontal section heel, the water pipe 5 of keeping away is for non-porous on perisporium Pipeline section of the hole less than the hole on the screen casing 4 in gap or perisporium.Wherein, the net horizontal section heel be straight well section and The junction of net horizontal section.
The horizontal well completion tubular pile that the application is provided is preferably applied to hypertonic as the mesopore of artificial lifting way using electric submersible pump 9 In reservoir-level well.By the heel section of horizontal well set keep away water pipe 5, it is possible to decrease due to electric submersible pump 9 suction force produced by The excessive producing pressure differential of part, balance the seepage field of horizontal well.Thus the formation of local water cone can be prevented effectively from, so as to prolong Delay the water breakthrough cycle of horizontal well, improve the development effectiveness of horizontal well.
The premise of this technology application is that horizontal well drilling has reached Drilling Design purpose in itself, that is, bore meet purpose reservoir and away from There is appropriate distance from oil-water interfaces.If individual well has been drilled into oil-water interfaces nearby or even has reached water layer section, the control to water cone System is invalid.
The technical scheme that the application is provided is described in detail below according to specific embodiment and with reference to accompanying drawing.
In the horizontal well completion tubular pile that present embodiment is provided is applicable to the hypertonic reservoir-level well completion of mesopore, when So, however it is not limited to the hypertonic reservoir-level well completion of mesopore.Using electric submersible pump 9 as the lifting side for producing in the horizontal well completion Formula.As shown in figure 1, being provided with electric submersible pump 9 on horizontal well vertical section top, electric submersible pump 9 is given rise to fluid by Smoking regime Ground.The application is provided with net horizontal section heel and keeps away water pipe 5, can be avoided by keeping away the physical barrier of water pipe 5 because electricity is latent The swabbing action of pump 9 and cause stratum liquid to be produced in the maximum horizontal well heel of producing pressure differential, but be expanded to whole level Well section, so that the seepage field balance of horizontal well.As shown in Fig. 2 the position of water pipe 5 is being kept away, the seepage field kept away near water pipe 5 Spread to other positions, the seepage flow intensity that can avoid net horizontal section heel is higher than other net horizontal sections.
In present embodiment, it is preferable that keep away water pipe 5 using pipeline seamless on perisporium, certainly, can also use than level The few pipeline of the hole on screen casing 4 in well section so that less fluid is penetrated into be kept away in water pipe 5, may also function as balancing seepage flow The effect of field.
The horizontal well completion tubular pile also includes the first oil pipe 7, and one end of the first oil pipe 7 connects with the upper end for keeping away water pipe 5 Connect, the other end is connected with the production casing 10 in vertical well section.Normally, the first oil pipe 7 is connected on production casing 10 and sets Hanger 8 on.First oil pipe 7 and the diameter and length for keeping away water pipe 5 can determine according to the actual conditions of pit shaft.
The first packer 6 is provided with the first oil pipe 7 and between keeping away water pipe 5, the first packer 6 is used for two kinds of different pipes First oil pipe 7 in footpath and keep away water pipe 5 and be tightly connected.Here, the first oil pipe 7, the first packer 6 and keeping away water pipe 5 and can play jointly The effect of the producing pressure differential of equilibrium water horizontal well heel.
Be provided with screen casing 4 in net horizontal section, crude oil enters screen casing 4 from after bottom outflow, then via screen casing 4, keep away water Pipe 5 enters the first oil pipe 7, and gives rise to ground by electric submersible pump 9.
The screen casing 4 preferably uses wire-wrapped screen, and the upper end of the screen casing 4 is connected to be kept away on water pipe 5, in the lower end of the screen casing 4 The second oil pipe 3 is connected with, the second oil pipe 3 is set herein, its effect is also to balance the seepage field of whole net horizontal section, delaying water The water breakthrough cycle of horizontal well, to improve the ability of bosom about oil-producing to greatest extent.
Can be attached using connector between the oil pipe 3 of screen casing 4 and second.Sleeve pipe is connected with the lower end of the second oil pipe 3 Footwear 1.
Oil pipe (such as the first oil pipe 7 and the second oil pipe 5) wherein described in the present invention is imporous pipeline on perisporium.
Preferably, the outside of the second oil pipe 3 is provided with the second packer 2.
According to another aspect of the present invention, a kind of horizontal well is also provided, water as described above is provided with the horizontal well Horizontal well completion tubular column.
The horizontal well includes straight well section and net horizontal section, and the top of straight well section is provided with the electric submersible pump 9 of lifting crude oil.
The specific implementation process of the horizontal well is:
Before horizontal well probing, the depth design well track according to target reservoir.In real brill, especially to thin sand, bottom The oil reservoir of the oil reservoir oil-containing finite thickness such as water oil reservoir, need to increase the Tracking Recognition of field geology series of strata, determine the layer of formation at target locations Position and depth.
By from the method met at the top of purpose series of strata is directly bored, most directly verifying reservoir accurate depth, afterwards reservoir top The complete production casing of subordinate, after confirming cementing quality, carries out net horizontal section deflecting and horizontal segment drilling again.Horizontal segment drilling process In, use with imaging logging is bored with good time observation determination net horizontal section track position and the difference of planned well track, especially weigh Promise horizontal well path creeps into close proximity to reservoir top.
After finishing drilling, the supporting data such as geophysical log are enrolled by logging while drilling technology such as LWD, determine net horizontal section Reservoir position and thickness, individual well liquid-producing capacity is determined according to well-log information and reservoir characteristics;Enter level as described above under supporting The completion tubular column of well:Including casing shoe 1, the second oil pipe 3, the second packer 2, screen casing 4, water pipe 5 is kept away, its position is according to horizontal well The length of section and its heel position of drilling well net horizontal section determine;Then order completes the first packer of net horizontal section upper position 6th, completion tool sequence such as the first oil pipe 7 and production casing 10 etc..Thus the shaft bottom tubing string configuration of horizontal well production is completed.
After the completion tool installation of underground, according to the individual well liquid-producing capacity having determined, matched electricity is chosen to install Latent pump group is closed, and is completed the installation of artificial lifting way and is tested production.
The preferred embodiment of the present invention is described in detail above in association with accompanying drawing, but, the present invention is not limited thereto.At this In the range of the technology design of invention, various simple variants, including each particular technique can be carried out to technical scheme Feature is combined in any suitable manner.In order to avoid unnecessary repetition, the present invention is to various possible combinations No longer separately illustrate.But these simple variants and combination should equally be considered as content disclosed in this invention, belong to the present invention Protection domain.

Claims (10)

1. a kind of horizontal well completion tubular pile, it is characterised in that including the screen casing (4) positioned at net horizontal section and with the screen casing (4) what upper end connected keeps away water pipe (5) positioned at net horizontal section heel, and the water pipe (5) of keeping away is imporosity or week on perisporium Pipeline section of the hole less than the hole on the screen casing (4) on wall.
2. horizontal well completion tubular pile according to claim 1, it is characterised in that the horizontal well completion tubular pile also includes the One oil pipe (7), one end of first oil pipe (7) is connected with the upper end for keeping away water pipe (5), the other end with vertical well section Production casing (10) is connected.
3. horizontal well completion tubular pile according to claim 2, it is characterised in that first oil pipe (7) is connected to described On the hanger (8) set on production casing (10).
4. horizontal well completion tubular pile according to claim 1, it is characterised in that first oil pipe (7) keeps away water with described The first packer (6) is provided between pipe (5).
5. the horizontal well completion tubular pile according to any one in claim 1-4, it is characterised in that the horizontal well completion Tubing string also includes second oil pipe (3) of the lower end for being connected to the screen casing (4).
6. horizontal well completion tubular pile according to claim 5, it is characterised in that the lower end connection of second oil pipe (3) There is casing shoe (1).
7. horizontal well completion tubular pile according to claim 5, it is characterised in that the outside of second oil pipe (3) is set There is the second packer (2).
8. the horizontal well completion tubular pile according to any one in claim 1-4, it is characterised in that the screen casing (4) is Wire-wrapped screen.
9. a kind of horizontal well, it is characterised in that be provided with the horizontal well according to any one in claim 1-8 Horizontal well completion tubular pile.
10. horizontal well according to claim 9, it is characterised in that the straight well top of the horizontal well is provided with electric submersible pump (9)。
CN201710244809.2A 2017-04-14 2017-04-14 Horizontal well completion tubular pile and horizontal well Pending CN106837262A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710244809.2A CN106837262A (en) 2017-04-14 2017-04-14 Horizontal well completion tubular pile and horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710244809.2A CN106837262A (en) 2017-04-14 2017-04-14 Horizontal well completion tubular pile and horizontal well

Publications (1)

Publication Number Publication Date
CN106837262A true CN106837262A (en) 2017-06-13

Family

ID=59148020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710244809.2A Pending CN106837262A (en) 2017-04-14 2017-04-14 Horizontal well completion tubular pile and horizontal well

Country Status (1)

Country Link
CN (1) CN106837262A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119787A (en) * 2019-11-28 2020-05-08 中国海洋石油集团有限公司 Horizontal well stratum anti-channeling water control well completion structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4640359A (en) * 1985-11-12 1987-02-03 Texaco Canada Resources Ltd. Bitumen production through a horizontal well
CA2135348A1 (en) * 1993-11-15 1995-05-16 Alfred Roy Jennings, Jr. Method for completing a horizontal well
CN201254976Y (en) * 2008-09-04 2009-06-10 安东石油技术(集团)有限公司 New horizontal well sand prevention well completion structure
CN201963286U (en) * 2011-03-10 2011-09-07 中国石油天然气股份有限公司 Flow string for reducing containing water of central pipe of horizontal well
CN204041030U (en) * 2014-05-15 2014-12-24 成都北方石油勘探开发技术有限公司 With the horizontal well in segments completion tubular column of the close screen casing of variable orifice
CN204252928U (en) * 2014-11-06 2015-04-08 中国石油天然气股份有限公司 The center management and control liquid tubing string of horizontal well
CN105863578A (en) * 2016-05-11 2016-08-17 四川行之智汇知识产权运营有限公司 Horizontal well completion string capable of achieving subsection exploiting
CN105952388A (en) * 2016-05-11 2016-09-21 四川行之智汇知识产权运营有限公司 Heavy oil horizontal well completion pipe string realizing subsection mining

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4640359A (en) * 1985-11-12 1987-02-03 Texaco Canada Resources Ltd. Bitumen production through a horizontal well
CA2135348A1 (en) * 1993-11-15 1995-05-16 Alfred Roy Jennings, Jr. Method for completing a horizontal well
CN201254976Y (en) * 2008-09-04 2009-06-10 安东石油技术(集团)有限公司 New horizontal well sand prevention well completion structure
CN201963286U (en) * 2011-03-10 2011-09-07 中国石油天然气股份有限公司 Flow string for reducing containing water of central pipe of horizontal well
CN204041030U (en) * 2014-05-15 2014-12-24 成都北方石油勘探开发技术有限公司 With the horizontal well in segments completion tubular column of the close screen casing of variable orifice
CN204252928U (en) * 2014-11-06 2015-04-08 中国石油天然气股份有限公司 The center management and control liquid tubing string of horizontal well
CN105863578A (en) * 2016-05-11 2016-08-17 四川行之智汇知识产权运营有限公司 Horizontal well completion string capable of achieving subsection exploiting
CN105952388A (en) * 2016-05-11 2016-09-21 四川行之智汇知识产权运营有限公司 Heavy oil horizontal well completion pipe string realizing subsection mining

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119787A (en) * 2019-11-28 2020-05-08 中国海洋石油集团有限公司 Horizontal well stratum anti-channeling water control well completion structure

Similar Documents

Publication Publication Date Title
CN103857872B (en) A kind of method for the hydraulically created fracture geometry for determining reservoir or target area
CN106948795B (en) A kind of method of multi-branched horizontal well closed cycle exploitation hot water type underground heat
CN104011326B (en) Hydraulic fracturing seismic events are monitored and sent in real time using the pilot hole of processing well as monitoring well to the system on surface
CN103184859B (en) For quarrying apparatus and the method for single-well injection-production
Glandt Reservoir management employing smart wells: a review
US20090038792A1 (en) System and method for producing fluids from a subterranean formation
CN104265242B (en) The ground thermal extraction method of geothermal well
RU2007148901A (en) CAVITY DRILLING SYSTEM
CN104100254A (en) Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof
US20150096748A1 (en) Systems and methods for enhancing steam distribution and production in sagd operations
CN105952378A (en) Tree-shape structure well drilling and completion and yield increasing method
GB2549832A (en) Geothermal power system
US20170247990A1 (en) Method for drilling and fracture treating multiple wellbores
Torvund et al. First installation of multilateral drilling stimulation technology in tight sandstone formation
CN106837262A (en) Horizontal well completion tubular pile and horizontal well
CN203321507U (en) Sectional flow rate and water content synchronous monitoring and water detection tubular column for multi-stage fractured horizontal well
US4359092A (en) Method and apparatus for natural gas and thermal energy production from aquifers
US20170058646A1 (en) Deepwater extended reach hardrock completions
Quintero et al. Dynamics of Multiphase Flow Regimes in Toe-Up and Toe-Down Horizontal Wells
CN109723424A (en) A kind of down-hole drilling waterdrainage amount prediction technique
CN107605485A (en) A kind of directional well is combined with subduction electric pump adopts salt method
CN104040107A (en) Method and system for drilling with reduced surface pressure
CN206220933U (en) Oil recovery process units
CN103122760A (en) Completion pipe string for suspending bottom water coning
Phillips Enhanced thermal recovery and reservoir characterization

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170613

WD01 Invention patent application deemed withdrawn after publication