CN201952835U - 电厂循环水进排水管沟叠合布置结构 - Google Patents
电厂循环水进排水管沟叠合布置结构 Download PDFInfo
- Publication number
- CN201952835U CN201952835U CN2010206327635U CN201020632763U CN201952835U CN 201952835 U CN201952835 U CN 201952835U CN 2010206327635 U CN2010206327635 U CN 2010206327635U CN 201020632763 U CN201020632763 U CN 201020632763U CN 201952835 U CN201952835 U CN 201952835U
- Authority
- CN
- China
- Prior art keywords
- water inlet
- pipe
- water
- water outlet
- inlet pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sewage (AREA)
Abstract
一种电厂循环水进排水管沟叠合布置结构,它包括每台机组连接的进水管和排水管,所述的进水管和排水管分别从循泵房连接于主厂房并按上下层布置,其中排水管由排水暗沟组成,所述的进水管位于所述排水暗沟的上面;所述的排水暗沟用现浇钢筋结构构成,所述的排水暗沟顶面上铺设有人工砂石,所述的进水管为进水钢管,且被布置在所述人工砂石上并在所述进水钢管外面填满有回填土;本实用新型在工程量增加不大的情况下,循环水进出水管沟采用上下层叠合布置,解决了主厂房附近管沟集中的地带平面布置困难的问题,节省了厂区用地,减少了管线走廊宽度和施工面。
Description
技术领域
本实用新型涉及的是一种电厂循环水进排水管沟叠合布置结构,以解决在电厂占地面积紧张、主厂房前布置紧凑的情况下解决电厂循环水进排水管沟布置的问题。
背景技术
大型火力发电厂主厂房前的管网平面布置很复杂,主要是:1)由于受经济利益的影响,投资商往往要求最大限度地利用现有土地面积,在厂区做总体规划时,往往更多地考虑的是在满足规范的最低要求下,如何紧凑的布置工厂建、构筑屋及设备,使得可供管线通过的空间较为狭窄;2)厂区内部管线种类较多,特别是主厂房前,通常有给水、排水、水水交换器进水管管沟,同时还有事故油坑、综合管架、主变、启备变、高压厂变等设施,这就使得管沟平面布置更加困难。
电厂循环水进排水管沟是电厂水系统的动脉,因此,如何使循环水进排水管沟的布置安全可靠地适应它所承担的任务,一直是设计人员关心的问题。管沟布置过去一直采用平面形式,这种形式在用地不紧张的情况下没有任何问题,但很多发电厂工程厂区占地面积较小、主厂房前布置紧凑,且管道交叉较多,这就迫切需要寻求在工程量增加不大的情况下更好的管沟布置方法。
实用新型内容
本实用新型技术的目的在于克服现有平面布置方法的不足,采用叠合布置的方法,解决主厂房附近管沟集中的地带平面布置困难的问题。
本实用新型的目的是通过如下技术方案来完成的:它包括每台机组连接的进水管和排水管,所述的进水管和排水管分别从循泵房连接于主厂房并按上下层布置,其中排水管由排水暗沟组成,所述的进水管位于所述排水暗沟的上面。
所述的排水暗沟用现浇钢筋结构构成,所述的排水暗沟顶面上铺设有人工砂石,所述的进水管为进水钢管,且被布置在所述人工砂石上并在所述进水钢管外面填满有回填土。
与现有技术相比,本实用新型的优点是:在工程量增加不大的情况下,节省了厂区用地,减少了管线走廊宽度和施工面。
附图说明
图1是本实用新型的结构示意图。
图2是图1的A-A剖视结构示意图。
具体实施方式
下面将结合附图对本实用新型作详细的介绍:图1、2所示,本实用新型包括每台机组连接的进水管和排水管,所述的进水管5和排水管7分别从循泵房6连接于主厂房并按上下层布置,其中排水管7由排水暗沟组成,所述的进水管5位于所述排水暗沟的上面。
所述的排水暗沟用现浇钢筋结构构成,所述的排水暗沟顶面上铺设有人工砂石,所述的进水管5为进水钢管,且被布置在所述人工砂石上并在所述进水钢管外面填满有回填土。
实施例1:本实用新型所述的电厂循环水供水管布置结构,如附图所示,它由布置在主厂房固定端西南角的循泵房6从主厂房“A”排柱前进入主厂房,每台机组的供水管管径为DN3000,设计流速2.92m/s。供水管长度,#1机1为114m;#2机2为229m;#3机3为327m;#4机4为403m。排水涵管布置,由主厂房“A”排柱前向西至排水连接井,从主厂房固定端至排水口,每台机组排水暗沟断面为3500x2600,设计流速为2.44m/s,排水暗沟长度,#1机1为72m;#2机2为161m;#3机3为264m;#4机4为335m。本工程厂区占地面积较小,主厂房前布置十分紧凑,循环水进出水管道的交叉较多,为使今后扩建预留足够的循环水压力管道管廊,在工程量增加不大的情况下,循环水进出水管道采用上下层布置。整个施工过程由以下几部分组成:
第一步:基槽开挖,开挖边坡m根据现场基岩实际情况确定,基坑开挖必须有排水措施,不得在积水中施工。基坑底部不允许出现欠挖,超挖控制在150mm以内,超挖部分石碴回填夯实。
第二步:现浇钢筋砼结构排水箱涵施工,箱涵二侧回填采用石渣分层压实回填。
第三步:在箱涵顶面上铺设人工砂基,进行进水钢管的施工,管道两侧及管顶500厚范围内的回填土应均匀回填上升。
以上实例仅为该项技术应用过程中的一个方面,本实用新型不限于以上实施例,除电力工程外,还可以广泛应用于市政建设工程中,如地铁隧道布置、城市给排水管道工程等。本领域的普通技术人员能从本实用新型公开的内容中直接导出或联想到的所有变形,均应认为是本实用新型的保护范围。
Claims (2)
1.一种电厂循环水进排水管沟叠合布置结构,它包括每台机组连接的进水管和排水管,其特征在于所述的进水管和排水管分别从循泵房连接于主厂房并按上下层布置,其中排水管由排水暗沟组成,所述的进水管位于所述排水暗沟的上面。
2.根据权利要求1所述的电厂循环水进排水管沟叠合布置结构,其特征在于所述的排水暗沟用现浇钢筋结构构成,所述的排水暗沟顶面上铺设有人工砂石,所述的进水管为进水钢管,且被布置在所述人工砂石上并在所述进水钢管外面填满有回填土。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206327635U CN201952835U (zh) | 2010-11-19 | 2010-11-19 | 电厂循环水进排水管沟叠合布置结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206327635U CN201952835U (zh) | 2010-11-19 | 2010-11-19 | 电厂循环水进排水管沟叠合布置结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201952835U true CN201952835U (zh) | 2011-08-31 |
Family
ID=44496955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206327635U Expired - Fee Related CN201952835U (zh) | 2010-11-19 | 2010-11-19 | 电厂循环水进排水管沟叠合布置结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201952835U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088790A (zh) * | 2011-10-27 | 2013-05-08 | 河南省电力勘测设计院 | 一种电厂循环水钢制排水口及施工方法 |
-
2010
- 2010-11-19 CN CN2010206327635U patent/CN201952835U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103088790A (zh) * | 2011-10-27 | 2013-05-08 | 河南省电力勘测设计院 | 一种电厂循环水钢制排水口及施工方法 |
CN103088790B (zh) * | 2011-10-27 | 2015-07-01 | 河南省电力勘测设计院 | 一种电厂循环水钢制排水口及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207348091U (zh) | 一种装配式综合管廊 | |
CN108487252A (zh) | 一种深基坑明挖顺作施工方法 | |
CN102852121B (zh) | 深厚覆盖层上修建粘土堆石坝的人工复合地基及施工方法 | |
CN102535441A (zh) | 一种地下连续墙的施工方法 | |
CN102296572B (zh) | 坝后设弃渣场的土石坝坝体渗流监测结构及其施工方法 | |
CN206538789U (zh) | 一种综合管廊 | |
CN102535519A (zh) | 地下连续墙工字钢接头结构及其施工方法 | |
US11566390B2 (en) | Construction method of reclaiming land from the sea based on basement utilization | |
CN107794942A (zh) | 一种下穿河床综合管廊结构及其施工方法 | |
CN103132539A (zh) | 地下连续墙套铣接头施工方法 | |
CN101638898B (zh) | 顶管竖井悬挂式施工方法 | |
CN111305141B (zh) | 一种地下综合管廊穿枯水期河渠的引流方法 | |
CN103882889A (zh) | 建筑物基础底板防水系统 | |
CN202577363U (zh) | 一种地下连续墙工字钢接头结构 | |
CN107268675A (zh) | 一种组合式多仓地下综合管廊的铺设方法及结构 | |
CN201952835U (zh) | 电厂循环水进排水管沟叠合布置结构 | |
CN110939139B (zh) | 基于桩后异型挡墙刚性接触的桩板墙结构及其构建方法 | |
CN102071721A (zh) | 电厂循环水进排水管沟叠合布置结构 | |
CN215410517U (zh) | 单井双线顶管井 | |
CN205804404U (zh) | 一种用于综合管廊的新型预制箱涵 | |
CN204570718U (zh) | 一种带有液体管道通路的筏板基础 | |
CN204690730U (zh) | 地下连续墙骨架 | |
CN204691255U (zh) | 地下连续墙 | |
CN205000290U (zh) | 库底沥青混凝面板和库坡混凝土面板连接结构 | |
CN103967033A (zh) | 一种水电站厂房地基处理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110831 Termination date: 20161119 |