CN201952803U CN2011200096773U CN201120009677U CN201952803U CN 201952803 U CN201952803 U CN 201952803U CN 2011200096773 U CN2011200096773 U CN 2011200096773U CN 201120009677 U CN201120009677 U CN 201120009677U CN 201952803 U CN201952803 U CN 201952803U
Authority
CN
China
Prior art keywords
locating rack
steel post
positioning frame
support steel
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200096773U
Other languages
Chinese (zh)
Inventor
夏峰海
全有维
胡占东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN2011200096773U priority Critical patent/CN201952803U/en
Application granted granted Critical
Publication of CN201952803U publication Critical patent/CN201952803U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a positioning frame for an underground overlong support steel upright post. The positioning frame is mainly formed by welding four pieces of angle steel and a batten plate, wherein the inner side edge of the positioning frame is 2-10 millimeters larger than the outer side edge of the support steel upright post; the lower part of the positioning frame is sleeved on the outer side of the support steel upright post, and is connected through a detachably bolt; and the upper part of the positioning frame is higher than a pile orifice, and is fixedly hoisted on the pile orifice after being corrected. The positioning frame has the advantages of simple and reasonable structure, convenience in assembly, disassembly and correction, and the like, the post top elevation of the support steel upright post can be reduced from the allowable deviation of +/-100 millimeters to be less than +/-15 millimeters, and the deviation value between the central lines and the vertical lines of the support steel upright post and a reinforcement cage is adjusted from the allowable deviation of not less than 100 millimeters to be less than 20 millimeters. The positioning frame can be taken out for repeated use without earth cutting, the construction quality of a deep foundation pit can be remarkably enhanced, the labor intensity is lowered, and the working efficiency is improved.

Description

Underground overlength supports the steel post locating rack
Technical field
The utility model relates to a kind of locating rack, and the locating rack of the underground overlength support steel post of unique vertical supporting member in the vertical support system belongs to the realm of building construction in particularly a kind of deep foundation pit construction.
Background technology
It is unique vertical supporting member in the vertical support system in the deep foundation pit construction that underground overlength supports steel post, and the deviation of its installation quality can cause eccentric compression, can directly have influence on the security and stability of entirely going along with sb. to guard him deep foundation ditch down; Not only long but also heavy because of the support steel post in the deep foundation ditch, its top is at below the natural terrace about two meters and be in vacant state in the stake hole, and degree of freedom is big, brings sizable trouble to correction work, can't control the installation quality with conventional method.
Summary of the invention
The purpose of this utility model is in order to solve the problem of above-mentioned support steel post vertical installation quality in deep foundation pit construction, improve to support the verticality of steel post and reinforcing cage, design a kind of simple and reasonable, easy to loading and unloading, capital absolute altitude of being convenient to proofread and correct, can conveniently adjust and dwindle the support steel post in the deep foundation ditch and and the center line of reinforcing cage and the underground overlength of the departure between the vertical line support the steel post locating rack.
Underground overlength of the present utility model supports the steel post locating rack, it is characterized in that locating rack comprises that 4 angle steel and batten plate are welded, the inner side edge of described locating rack is than the big 2~10mm of outer side edges that supports steel post, the locating rack bottom is sleeved on to be supported the steel post outside and uses the easy unloading type latch to connect, and locating rack top exceeds an aperture and calibrated back fixedly is lifted on the aperture.
In order to take out locating rack under the situation of not cutting the earth, described easy unloading type latch comprises plug housing and 2 bolt rods, and described 2 bolt rod rear ends are contained in plug housing below and rotation down vertically through turning cylinder respectively, and plug housing is provided with draw ring.
In order to prevent that the easy unloading type latch from skidding off from connection holes, can on 2 bolt rods, be respectively equipped with anti-play boss, rotate in connection holes in order to prevent the easy unloading type latch, bolt rod can be selected for use waist shape bar.
For the ease of adjusting the capital absolute altitude that supports steel post, described locating rack is provided with length mark.
In order to improve the coaxial performance of locating rack and support steel post, the locating rack bottom is nested into support steel post top should be not less than 500mm, and for the ease of the capital absolute altitude of measuring and calculating support steel post, the locating rack upper end can exceed an aperture 500 mm.
Underground overlength of the present utility model supports the steel post locating rack, because will be embedded in underground overlength support steel post with locating rack extends to more than the ground, can accurately calculate and control the capital absolute altitude of support steel post by the length mark on the locating rack, again since locating rack to be sleeved on the distance that supports steel post longer, ignored in the suit gap, locating rack cover axis and the coaxial performance that supports between the steel post axis have been improved, also because the connector between locating rack and the support steel post uses the easy unloading type connector, particularly use the easy unloading type latch, after the concrete pouring that can be in finishing foundation ditch, upwards draw plug housing latch can be taken out in locating rack with drag hook or stay cord.Overcome with bolt and connected and after need excavating very dark soil layer, after finding and unloading positioning bolt, the defective that could will guide locating rack to hang out with loop wheel machine.Have simple and reasonable, easy to loading and unloading, be convenient to advantages such as correction, can with the capital absolute altitude that supports steel post by allowable variation ± 100mm be reduced to ± 15mm in, the center line and the departure between the vertical line that support steel post and reinforcing cage are adjusted in the 20mm for being no more than 100mm by allowable variation, can also under the situation that does not need to cut the earth, take out locating rack and reuse, can obviously improve the construction quality of deep foundation ditch, reduce labour intensity and increase work efficiency.
Description of drawings
Fig. 1 is a kind of structural representation of the present utility model;
Fig. 2 be among Fig. 1 A-A to structural representation;
Fig. 3 is a kind of structural representation of easy unloading type latch.
The specific embodiment
Referring to accompanying drawing, 1 among the figure is locating rack, and 1-1 is the angle steel of locating rack, 1-2 is the batten plate of locating rack, and 1-3 is the connection holes of locating rack bottom, the 2nd, and the easy unloading type latch, 2-1 is a bolt rod, and 2-2 is a plug housing, and 2-3 is a turning cylinder, 2-4 is a draw ring, and 2-5 is anti-play boss, the 3rd, support steel post, 3-1 is the angle steel that supports steel post, and 3-2 is the batten plate that supports steel post, and 3-3 is the connection holes that supports steel post top, the 4th, reinforcing cage, the 5th, a hole.
Underground overlength of the present utility model supports the steel post locating rack, its locating rack 1 is welded by 4 angle steel 1-1 and batten plate 1-2, the inner side edge of described locating rack 1 is than the big 2~10mm of outer side edges that supports steel post 3, locating rack 1 bottom is sleeved on to be supported steel post 3 outsides and uses easy unloading type latch 2 to connect, and locating rack 1 top exceeds an aperture and calibrated back fixedly is lifted on the mouth in a hole 5.Its structure as depicted in figs. 1 and 2.
In order under the situation of not cutting the earth, to take out locating rack 1, described easy unloading type latch 2 comprises plug housing 2-2 and 2 bolt rod 2-1, described 2 bolt rod 2-1 rear ends are contained in the plug housing below through turning cylinder 2-3 respectively and also can rotate along turning cylinder 2-3, and plug housing 2-2 is provided with draw ring 2-4.Its structure as shown in Figure 3.
In order to prevent that the easy unloading type latch from skidding off from connection holes, can on 2 bolt rod 2-1, be respectively equipped with anti-play boss 2-5, in order to prevent that the easy unloading type latch from rotating in connection holes, bolt rod 2-1 can be designed to the waist shape bar of anti-rotation or cross section and be square, strip etc., the shape of connection holes is corresponding with bolt rod to get final product.
For the ease of adjusting the capital absolute altitude that supports steel post, described locating rack is provided with length mark.
In order to improve the coaxial performance of locating rack 1 and support steel post 3, locating rack 1 bottom is nested into support steel post top should be not less than 500mm, and for the ease of the capital absolute altitude of measuring and calculating support steel post 3, locating rack 1 upper end can exceed about 500 mm in an aperture.
During operation, behind pouring pile hole and clear hole, carry out laying of reinforcing cage 4 earlier, should guarantee when transferring reinforcing cage that it is concentric with stake hole 5, vertically transfer.When treating that reinforcing cage 4 tops are transferred apart from ground 2m, be fixed on the board.To support steel post 3 integral lifting with the 50t crawler crane again, when supporting steel post 3 and hang in the reinforcing cage 4 3m, it is integrally welded to support steel post 3 and reinforcing cage 4, will support steel post then and reinforcing cage together descends.When are disembarked in 1 meter left and right sides of platform at support steel post top, steel post is fixed on the board, then locating rack 1 bottom is sleeved on and supports steel post 3 outsides and use easy unloading type latch 2 to connect, after should noting inserting 2 bolt rods in the connection holes respectively when easy unloading type latch 2 connects, plug housing 2-2 need be pressed into 2 bolt rod 2-1 and become in-line, as shown in Figure 3, and then with locating rack 1 with support steel post 3 and together continues decline with reinforcing cage 4, fixedly be lifted on the mouth in a hole 5, as shown in Figure 1 near stake aperture and calibrated back up to locating rack 1 top.At this moment, because of supporting the pulling force that downward gravity of steel post 3 and locating rack 1 make progress, make plug-in mounting support bolt rod among the connection holes 1-3 of the connection holes 3-3 on steel post top and locating rack bottom and bear a kind of front end power that the rear end rotates that makes progress, but the power that 2 bolt rod 2-1 rear ends rotate respectively can't be rotated because of the effect of plug housing 2-2, and locating rack 1 can firmly be sling supporting steel post 3 and following reinforcing cage 4 thereof etc.Because easy unloading type latch 2 is contained in the dual-side that supports in the steel post 3, do not influence again the concrete construction of carrying out in the foundation ditch.After the concrete pouring in finishing foundation ditch, support steel post etc. all is fixed motionless, locating rack is become flexible to end earlier, can upwards draw plug housing 2-2 with drag hook or stay cord through draw ring 2-4 from locating rack is suitable for reading, in locating rack 1, take out easily after 2 bolt rod 2-1 can being extracted out from connection holes 1-3 and 3-3.Can under the situation that does not need to cut the earth, take out locating rack at last and reuse.

Claims (4)

1. a underground overlength supports the steel post locating rack, it is characterized in that locating rack is welded by 4 angle steel and batten plate, the inner side edge of described locating rack is than the big 2~10mm of outer side edges that supports steel post, the locating rack bottom is sleeved on to be supported the steel post outside and uses the easy unloading type latch to connect, and locating rack top exceeds an aperture and calibrated back fixedly is lifted on the aperture.
2. underground according to claim 1 overlength supports the steel post locating rack, it is characterized in that described easy unloading type latch comprises plug housing and 2 bolt rods, described 2 bolt rod rear ends are contained in plug housing below and rotation down vertically through turning cylinder respectively, and plug housing is provided with draw ring.
3. support the steel post locating rack as underground overlength as described in the claim 2, it is characterized in that being respectively equipped with on described 2 bolt rods anti-play boss, bolt rod is designed to the waist shape bar of anti-rotation.
4. support the steel post locating rack as underground overlength as described in claim 1 or 2 or 3, it is characterized in that locating rack is provided with length mark.
CN2011200096773U 2011-01-13 2011-01-13 Positioning frame for underground overlong support steel upright post Expired - Lifetime CN201952803U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200096773U CN201952803U (en) 2011-01-13 2011-01-13 Positioning frame for underground overlong support steel upright post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200096773U CN201952803U (en) 2011-01-13 2011-01-13 Positioning frame for underground overlong support steel upright post

Publications (1)

Publication Number Publication Date
CN201952803U true CN201952803U (en) 2011-08-31

Family

ID=44496923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200096773U Expired - Lifetime CN201952803U (en) 2011-01-13 2011-01-13 Positioning frame for underground overlong support steel upright post

Country Status (1)

Country Link
CN (1) CN201952803U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121247A (en) * 2011-01-13 2011-07-13 中建八局第三建设有限公司 Locating frame of underground ultra-long support steel upright
CN103952971A (en) * 2014-05-22 2014-07-30 浙江金筑交通建设有限公司 Reinforced concrete structure hollow thin wall pier type steel frame column and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102121247A (en) * 2011-01-13 2011-07-13 中建八局第三建设有限公司 Locating frame of underground ultra-long support steel upright
CN102121247B (en) * 2011-01-13 2012-07-11 中建八局第三建设有限公司 Locating frame of underground ultra-long support steel upright
CN103952971A (en) * 2014-05-22 2014-07-30 浙江金筑交通建设有限公司 Reinforced concrete structure hollow thin wall pier type steel frame column and construction method thereof
CN103952971B (en) * 2014-05-22 2015-11-04 浙江金筑交通建设有限公司 A kind of construction method of steel and concrete structure hollow thin-walled high pier type steel skeleton post

Similar Documents

Publication Publication Date Title
CN102121247B (en) Locating frame of underground ultra-long support steel upright
CN204675673U (en) To construct between a kind of building block layer material vertical transferring apparatus
CN213834278U (en) Dig a major diameter overlength steel reinforcement cage hoist and mount auxiliary device soon
CN205474844U (en) Straddle type beiLei beam support
CN201952803U (en) Positioning frame for underground overlong support steel upright post
CN208415013U (en) track fast dismounting device
CN102587377B (en) Drop hammer type pile sinking device and pile sinking method thereof
CN102777050A (en) Assembly type jig frame for longspan pipe truss roof girder
CN105951683B (en) Gate pier bracket Joint Re-bar Construction
CN209038882U (en) A kind of moveable suspended bracket for lifting pipeline in piping lane
CN212612488U (en) Movable underwater concrete pouring guide pipe trolley
CN203022409U (en) Iron tower support assembly
CN112030996B (en) A construction platform for foundation ditch crown beam upper portion
CN208996026U (en) Pile structure under a kind of intectate geological conditions
CN208072382U (en) A kind of inverse inhalation type steel buttress
CN207633804U (en) A kind of middle-size and small-size full assembling activity formula reinforcing steel processing shed
CN202492846U (en) Drop hammer pile-sinking device
CN201975727U (en) Adjustable payoff stand
CN102756988A (en) Movable sling for mounting expansion joint of comb plate
CN102251668B (en) Shoal swampy zone wind power construction method, bearing buoyancy tank and tower barrel fixing device
CN214883636U (en) Fixing device of tubular pile body
CN214273509U (en) Standing type deep water torrent light-weight type circulating drilling machine for forming holes on pile foundation in bridge water
CN216034422U (en) Docking block moving machine
CN202829430U (en) Movable type lifting appliance for comb plate expansion joint installation
CN213741066U (en) Portable pile extractor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110831

Effective date of abandoning: 20120711