CN201937205U - Special vehicle-mounted delivery and operation system for bypass live-wire operation equipment - Google Patents

Special vehicle-mounted delivery and operation system for bypass live-wire operation equipment Download PDF

Info

Publication number
CN201937205U
CN201937205U CN201020686538XU CN201020686538U CN201937205U CN 201937205 U CN201937205 U CN 201937205U CN 201020686538X U CN201020686538X U CN 201020686538XU CN 201020686538 U CN201020686538 U CN 201020686538U CN 201937205 U CN201937205 U CN 201937205U
Authority
CN
China
Prior art keywords
bypass
cable
car
tool
vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020686538XU
Other languages
Chinese (zh)
Inventor
马超
张秀伟
宋树军
袁玉柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Handler Special Vehicle Co Ltd
Original Assignee
Xuzhou Handler Special Vehicle Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Handler Special Vehicle Co Ltd filed Critical Xuzhou Handler Special Vehicle Co Ltd
Priority to CN201020686538XU priority Critical patent/CN201937205U/en
Application granted granted Critical
Publication of CN201937205U publication Critical patent/CN201937205U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to a special vehicle-mounted delivery and operation system for bypass live-wire operation equipment. The system comprises a cable twisting and releasing vehicle, two load switch vehicles, an insulating tool warehouse vehicle and a bypass tool warehouse vehicle, wherein a plurality of groups of reeling devices capable of automatically twisting and releasing cables are mounted in the cable twisting and releasing vehicle, and an intermediate bypass cable is stored on the reeling devices; load switches and terminal cable reels thereof are fixedly mounted in the load switch vehicles, and terminal down-leading bypass cables are arranged on the terminal cable reels; a quick mechanism including storage racks, drawers or platforms is arranged in the insulating tool warehouse vehicle, an insulating bucket-boom vehicle live-wire operation and protection tool is stored in the quick mechanism, and a constant temperature dehumidification system is arranged in a carriage of the insulating tool warehouse vehicle; and a quick mechanism including storage racks, drawers or platforms is arranged in the bypass tool warehouse vehicle, logos are arranged on the quick mechanism, and bypass operation tools including bypass cable accessories and supporting and tensioning tools are orderly stored according to the logos.

Description

The special-purpose vehicle-mountedization delivery and the operating system of bypass live line working equipment
Technical field
The utility model relates to the distribution field, relates to the vehicle-mountedization delivery and the operating system of power distribution network aerial cable bypass hotline maintenance job execution, especially bypass live line working equipment.
Background technology
Component devices such as the aerial cable of distribution network system and gold utensil all need carry out a large amount of maintenance every year; At present, the mode of interruption maintenance is mainly adopted in such overhaul of the equipments, along with the raising that social development requires power supply reliability, does not carry out the overhaul of the equipments construction under the power-off condition in proof load, has become pressing for of a kind of power distribution network upkeep operation.
At present,, once in some upkeep operations, attempted using, still as the method for interim power supply with diesel-oil electric generator wagon to terminal use's power supply; Shortcomings such as the power that this way exists is little, noise is big, air pollution is big have limited it to apply; And bypass live line working method has overcome above-mentioned shortcoming, is applied.
Bypass live line working basic principle: at the normal aerial cable tip side bypass cable that inserts in parallel, substitute the aerial cable power supply by bypass cable temporarily, thereby the user is being carried out under the condition of uninterrupted power supply, realization is changed or maintenance not having a power failure of aerial cable and annex thereof, recovers former aerial cable normal power supply again and removes the receipts bypass cable after finishing maintenance.
China's distribution aerial cable adopts three-phase three-wire system, and the about 300m of general every distance is provided with a place's tension force shaft tower and a breakpoint of cable, so that the cable tensioning is changed with maintenance; Therefore, change or overhaul 1 section aerial cable, need the about 900m of bypass cable total length above (general disjunction is every 50m, adopts the cable reel storage, operates so that construction is transported and launched).The equipment of bypass live line working process need mainly comprises aerial lift device with insulated arm, bypass cable, electric cable accessories, on-load switch and switch bracket, supporting and tightener, insulation operation and safety device etc.
At present, the equipment of above-mentioned bypass live line working process need, except aerial lift device with insulated arm can be from walking, the transfer of other implement, all adopt the method for many common cargo vehicle deliveries, other establishes lifting and cooperates with handbarrow, each delivery with the operation set-up procedure is: above-mentioned various implements are taken out from storehouse, lift and be transported on many cargo vehicles, after arriving operating location, above-mentioned various implements are lifted and be transported to ground, two on-load switches are fixedly mounted on two shaft towers of the about 300m in interval, by root the bypass cable pull-up is connected on two on-load switch joints by erecting tools.
Implements such as bypass cable belong to big ticket item, in transportation and operation process, easily are damaged; Because operation time is long, so operating efficiency is also very low, personnel labor intensity is also bigger; The problems referred to above have influenced applying fast of bypass live line working method.
Summary of the invention
The purpose of this utility model, provide a kind of delivery and operating system of special-purpose vehicle-mountedization of bypass live line working equipment, this system is with the equipment of above-mentioned bypass live line working process need, by performance characteristics need with construction separately, carry out special-purpose vehicle-mountedization installation respectively and deposit, utilize vehicle-mountedization structure after reaching the spot to simplify operation process; The utility model will obviously improve operating efficiency, improves personnel labor intensity, improve service life of equipment.
The technical scheme that realizes the utility model purpose is:
The special-purpose vehicle-mountedization delivery and the operating system of bypass live line working equipment, this system comprise twisted and released of the cable Che Yitai, two in on-load switch car, insulating tool storehouse Che Yitai and bypass tool storage room Che Yitai; But the reel device of many group automatic deploying and retracting cables is installed, bypass cable in the middle of depositing on the reel device in the described twisted and released of the cable car; Described on-load switch car internal fixation is installed on-load switch and terminal cable reel thereof, and terminal cable reel is provided with terminal and draws bypass cable down; Described insulating tool Ku Chenei is provided with the quick mechanism that comprises shelf, drawer or platform, and the quick mechanism internal memory is placed with aerial lift device with insulated arm live line working and safety device, and the constant temperature dehumidification system is set in the compartment; Be provided with the quick mechanism that comprises shelf, drawer or platform in the described bypass tool storage room car, quick mechanism is provided with sign, and deposits the bypass power tool that comprises bypass cable annex and supporting and tightener in order by sign.
During the utility model is constructed at the scene, the twisted and released of the cable car can utilize vehicle to move the cable of dispensing automatically along the line, the on-load switch car is parked in job position, as interim switch-box station, directly be connected and get final product with aerial cable, the insulation Work tool takes out and needn't on-the-spot dehumidification treatments can begin to be used for live line working in car, and charged installation exercise can carry out on-the-spot dehumidification treatments after finishing immediately.Promptly at the construction field (site), two described on-load switches interconnect by connector in the middle of middle bypass cable and the bypass cable, and drawing down by terminal again, bypass cable is connected with the aerial cable tip side at two ends respectively.
As further improvement of the utility model, above-mentioned insulating tool storehouse car and bypass tool car two cars in the occasion that trafficability is allowed, can be improved to two cars unification scheme.
As further improvement of the utility model, above-mentioned bypass tool storage room car in the occasion that trafficability is allowed, also can be improved to the bypass power tool is equipped in the twisted and released of the cable car, thereby be unworthy of special bypass tool storage room car.
As further improvement of the utility model, above-mentioned on-load switch car two car schemes in the occasion that trafficability and job site are allowed, also can be improved to a cover on-load switch wherein is installed in the twisted and released of the cable car, thereby only join an on-load switch car.
The beneficial effects of the utility model are, various bypass live line working equipment are deposited delivery with special special-purpose vehicle, reduce as far as possible and loading and unloading, in-situ processing and the on-the-spot installation exercise of simplifying various device, the efficient of whole bypass operation set-up procedure can be improved more than 10 times, and personnel labor intensity is little, equipment uses the damage possibility little.
Description of drawings
Fig. 1 is the on-the-spot schematic diagram of bypass job execution of the present utility model.
Among Fig. 1: the 1.10KV aerial cable, 2. tension force shaft tower, 3. terminal is drawn bypass cable, 4. on-load switch down, 5. middle bypass cable, 6. connector, 7. insulating tool storehouse car, 8. on-load switch car in the middle of the bypass cable, 9. twisted and released of the cable car, 10. bypass tool storage room car, 11. aerial lift device with insulated arm.
Embodiment
Below in conjunction with drawings and Examples the utility model is further specified
Among Fig. 1, the special-purpose vehicle-mountedization delivery and the operating system of bypass live line working equipment comprise a twisted and released of the cable car 9, two on-load switch cars 8, an insulating tool storehouse car 7 and a bypass tool storage room car 10.But the reel device of many group automatic deploying and retracting cables is installed in the twisted and released of the cable car 9, is deposited the above middle bypass cable 5 of 900m on the reel device; On-load switch car internal fixation is installed on-load switch 4 and terminal cable reel thereof, and terminal cable reel is provided with terminal and draws bypass cable 3 down; Be provided with the quick mechanism that comprises shelf, drawer or platform in 7 cars of insulating tool storehouse, the quick mechanism internal memory is placed with aerial lift device with insulated arm live line working and safety device, and the constant temperature dehumidification system is set in the compartment; Be provided with the quick mechanism that comprises shelf, drawer or platform in the bypass tool storage room car 10, quick mechanism is provided with sign, and deposit the bypass power tool that comprises bypass cable annex and supporting and tightener in order by sign, comprise bypass cable centre connector 6 in the bypass cable annex.
Among Fig. 1,10KV aerial cable 1 breaks down needs interruption maintenance, and insulating tool storehouse car 7, two on-load switch cars 8, twisted and released of the cable car 9, bypass tool storage room cars 10 are on the scene for one group with aerial lift device with insulated arm 11 6 cars; Two on-load switch cars 8 are parked in the two ends tension force shaft tower of waiting to repair cable 2 times, and extracting terminal respectively out in two cars draws bypass cable 3 down; Take out the insulation Work tool from insulating tool storehouse car 7, the operating personnel carries the insulation Work tool and enters aerial lift device with insulated arm 11, and platform is raised to tension force shaft tower 2 tip positions, chargedly draws two locking terminals down that bypass cable 3 is connected with tension force shaft tower 2 place's cable joints; Twisted and released of the cable car 9 roads along the line will need the middle bypass cable 5 of quantity to emit automatically, with what take out in the bypass tool storage room car 10. in the middle of the bypass cable connector 6 with attach, bypass cable in the middle of each section 5 is connected and protection; On-load switch in two on-load switch cars 84 is closed a floodgate, and bypass cable begins parallel powering, disconnects the on-pole switch at two tension force shaft tower 2 places, and 1 outage of 10KV aerial cable enters inspecting state, recovers normal power supply by reverse sequence after maintenance finishes.

Claims (5)

1. the special-purpose vehicle-mountedization delivery and the operating system of bypass live line working equipment is characterized in that, this system comprises twisted and released of the cable Che Yitai, two in on-load switch car, insulating tool storehouse Che Yitai and bypass tool storage room Che Yitai; But the reel device of many group automatic deploying and retracting cables is installed, bypass cable in the middle of depositing on the reel device in the described twisted and released of the cable car; Described on-load switch car internal fixation is installed on-load switch and terminal cable reel thereof, and terminal cable reel is provided with terminal and draws bypass cable down; Described insulating tool Ku Chenei is provided with the quick mechanism that comprises shelf, drawer or platform, and the quick mechanism internal memory is placed with aerial lift device with insulated arm live line working and safety device, and the constant temperature dehumidification system is set in the compartment; Be provided with the quick mechanism that comprises shelf, drawer or platform in the described bypass tool storage room car, quick mechanism is provided with sign, and deposits the bypass power tool that comprises bypass cable annex and supporting and tightener in order by sign.
2. the special-purpose vehicle-mountedization delivery and the operating system of bypass live line working equipment according to claim 1, it is characterized in that, two described on-load switches interconnect by connector in the middle of middle bypass cable and the bypass cable, and drawing down by terminal again, bypass cable is connected with the aerial cable tip side at two ends respectively.
3. the special-purpose vehicle-mountedization delivery and the operating system of bypass live line working equipment according to claim 1 is characterized in that, above-mentioned insulating tool storehouse car and the unification of bypass tool car two cars.
4. the special-purpose vehicle-mountedization delivery and the operating system of bypass live line working equipment according to claim 1, it is characterized in that, above-mentioned twisted and released of the cable car and the unification of bypass tool car two cars, the bypass power tool in the above-mentioned bypass tool storage room car is equipped in the twisted and released of the cable car.
5. the special-purpose vehicle-mountedization delivery and the operating system of bypass live line working equipment according to claim 1, it is characterized in that, on-load switch car in above-mentioned two on-load switch cars and the unification of twisted and released of the cable car two cars, a cover on-load switch is installed in the twisted and released of the cable car.
CN201020686538XU 2010-12-28 2010-12-28 Special vehicle-mounted delivery and operation system for bypass live-wire operation equipment Expired - Lifetime CN201937205U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020686538XU CN201937205U (en) 2010-12-28 2010-12-28 Special vehicle-mounted delivery and operation system for bypass live-wire operation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020686538XU CN201937205U (en) 2010-12-28 2010-12-28 Special vehicle-mounted delivery and operation system for bypass live-wire operation equipment

Publications (1)

Publication Number Publication Date
CN201937205U true CN201937205U (en) 2011-08-17

Family

ID=44448714

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020686538XU Expired - Lifetime CN201937205U (en) 2010-12-28 2010-12-28 Special vehicle-mounted delivery and operation system for bypass live-wire operation equipment

Country Status (1)

Country Link
CN (1) CN201937205U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102122805A (en) * 2010-12-28 2011-07-13 徐州海伦哲专用车辆股份有限公司 Vehicular carrying and working system special for bypass live working device
CN102522714A (en) * 2011-11-22 2012-06-27 嘉兴电力局 Special counter used for electric power network distribution bypass operation
CN103015306A (en) * 2012-12-20 2013-04-03 徐州海伦哲专用车辆股份有限公司 Operation method for high-altitude emergency erection of highway passing linear facilities
CN104466788A (en) * 2013-09-23 2015-03-25 国家电网公司 Method and device for detecting power distribution overhead line
CN114094487A (en) * 2021-11-19 2022-02-25 长缆电工科技股份有限公司 Mobile cable emergency repair equipment, system and method

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102122805A (en) * 2010-12-28 2011-07-13 徐州海伦哲专用车辆股份有限公司 Vehicular carrying and working system special for bypass live working device
CN102122805B (en) * 2010-12-28 2015-11-25 徐州海伦哲专用车辆股份有限公司 The Special vehicle-mounted delivery of bypass live line working equipment and operating system
CN102522714A (en) * 2011-11-22 2012-06-27 嘉兴电力局 Special counter used for electric power network distribution bypass operation
CN102522714B (en) * 2011-11-22 2014-06-04 嘉兴电力局 Special counter used for electric power network distribution bypass operation
CN103015306A (en) * 2012-12-20 2013-04-03 徐州海伦哲专用车辆股份有限公司 Operation method for high-altitude emergency erection of highway passing linear facilities
CN103015306B (en) * 2012-12-20 2016-03-09 徐州海伦哲专用车辆股份有限公司 The operational method of High Altitude Emergency erection highway crossing wire facility
CN104466788A (en) * 2013-09-23 2015-03-25 国家电网公司 Method and device for detecting power distribution overhead line
CN104466788B (en) * 2013-09-23 2018-05-08 国家电网公司 The detection method and device of distribution overhead line
CN114094487A (en) * 2021-11-19 2022-02-25 长缆电工科技股份有限公司 Mobile cable emergency repair equipment, system and method

Similar Documents

Publication Publication Date Title
CN201937205U (en) Special vehicle-mounted delivery and operation system for bypass live-wire operation equipment
CN102122805A (en) Vehicular carrying and working system special for bypass live working device
CN201930940U (en) Special comprehensive water flushing vehicle for electric power high-altitude operation
CN203888836U (en) Multifunctional relay protection test vehicle
CN108128195A (en) A kind of overhead track posture intelligent movable charging system
WO2019064188A1 (en) A mobile power storage, transport and distribution system
CN203450972U (en) Portable mobile cable reel
EP2070861B1 (en) Power supplying equipment from electric supply network for rubber-tired crane in port
CN201810010U (en) Cross sliding carriers and track thereof, plane mobile parking equipment and garage
CN106882214A (en) A kind of novel electric power industry multi-functional operation car
CN205713333U (en) A kind of Super High parking tower is quickly picked up the car system
CN202413555U (en) Automatic load and unload equipment for generators
CN201102867Y (en) Hybrid power tire type gantry crane
CN203623405U (en) Intelligent mobile overhead line system device for storeroom door
CN105470838B (en) Application method of intelligent comprehensive power supply vehicle with mobile distribution network
CN210312964U (en) Two-way retractable movable cable drum device for wharf shore power system
CN104442519A (en) Movable type overhauling working table
CN202059095U (en) High-speed rail power cable climbing frame
CN102315608A (en) Self-propelled transmission line outgoing overhaul flying car
CN205754889U (en) The non-maintaining base station of integration, a kind of field
CN202768316U (en) Flow limiting oil pump with mutual inductor
CN201737611U (en) Lifting device for power capacitor tower
CN200974480Y (en) Rigid movable contacting grid
CN204211288U (en) Portable grounding jumper draw off gear
CN106219175A (en) A kind of pickling automated production line control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20110817

Effective date of abandoning: 20151125

C25 Abandonment of patent right or utility model to avoid double patenting