CN201737611U - Lifting device for power capacitor tower - Google Patents
Lifting device for power capacitor tower Download PDFInfo
- Publication number
- CN201737611U CN201737611U CN2010202511564U CN201020251156U CN201737611U CN 201737611 U CN201737611 U CN 201737611U CN 2010202511564 U CN2010202511564 U CN 2010202511564U CN 201020251156 U CN201020251156 U CN 201020251156U CN 201737611 U CN201737611 U CN 201737611U
- Authority
- CN
- China
- Prior art keywords
- hoisting device
- guide rail
- fixed guide
- capacitor
- capacitor tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000003990 capacitor Substances 0.000 title claims abstract description 45
- 238000009434 installation Methods 0.000 claims description 4
- 239000000725 suspension Substances 0.000 claims 1
- 229910000831 Steel Inorganic materials 0.000 abstract description 3
- 239000010959 steel Substances 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种电力电容塔吊装装置,属于起重装置,现有起重设备不便或难以对电容器进行吊装,本实用新型包括可固定安装在电容器塔梁架上的固定导轨和置于地面上的卷扬装置,其特征是:所述的固定导轨上安装一活动吊杆并在该活动吊杆与固定导轨上设置定位结构,在所述的活动吊杆上安装手扳葫芦和滑轮,所述手扳葫芦的钢丝绳绕过相应的滑轮连接吊钩,所述卷扬装置的钢丝绳绕过相应的滑轮连接吊具,所述的吊具上具有与所述的吊钩配合的吊挂部。结构轻巧,工作时可方便的安装在电容器塔梁架上,用手扳葫芦辅助卷扬装置实现对电容器的吊装,操作简易;用后便于拆卸。
The utility model discloses a hoisting device for a power capacitor tower, which belongs to a hoisting device. The existing hoisting equipment is inconvenient or difficult to hoist the capacitor. The hoisting device on the ground is characterized in that: a movable suspender is installed on the fixed guide rail and a positioning structure is arranged on the movable suspender and the fixed guide rail, and a lever hoist and a pulley are installed on the movable suspender , the steel wire rope of the lever block goes around the corresponding pulley to connect the hook, the steel wire rope of the hoisting device goes around the corresponding pulley to connect the sling, and the sling has a hanging hook that matches the hook. department. The structure is light and handy, and it can be conveniently installed on the capacitor tower beam frame during work, and the hoisting of the capacitor can be realized with the auxiliary hoisting device of the lever hoist, which is easy to operate and easy to disassemble after use.
Description
技术领域technical field
本实用新型属于起重装置,具体是用于向电网输变电系统中的电容器塔上吊装电容器的吊装装置。The utility model belongs to a hoisting device, in particular to a hoisting device for hoisting a capacitor on a capacitor tower in a power transmission and transformation system of a power grid.
背景技术Background technique
在电网输变电系统中,电网的高压电经过电容器装置才能供电,由于电力输送新技术的发展,电网电压等级越来越高,因此安装电容器的塔的高度也越来越高。由于电容器成密集状布置,相邻电容器之间的空隙很小,而单个电容器的重量仅靠人力搬运又非常困难,因此在维修吊装中需要机械设备或机械装置才能完成,而通用的起重设备无法进入狭小的空间进行作业,专门的电力电容塔检修用升降工作平台虽然使用方便、效率高、适用性强,但由于价格昂贵,因此需要一种简易的电容器的吊装装置。In the power transmission and transformation system of the power grid, the high-voltage power of the power grid can only be powered by the capacitor device. Due to the development of new power transmission technologies, the voltage level of the power grid is getting higher and higher, so the height of the tower where the capacitor is installed is also getting higher and higher. Because the capacitors are densely arranged, the gaps between adjacent capacitors are very small, and it is very difficult to carry the weight of a single capacitor only by manpower. Therefore, mechanical equipment or mechanical devices are required for maintenance and hoisting, and general-purpose lifting equipment It is impossible to enter a narrow space for operations. Although the special lifting work platform for the maintenance of electric capacitor towers is convenient to use, high in efficiency and strong in applicability, it is expensive, so a simple capacitor hoisting device is needed.
实用新型内容Utility model content
本实用新型要解决的技术问题和提出的技术任务是克服现有起重设备不便或难以对电容器进行吊装的缺陷,提供一种电力电容塔吊装装置。为此,本实用新型采用以下技术方案。The technical problem to be solved and the technical task proposed by the utility model are to overcome the defects of inconvenient or difficult hoisting of capacitors in existing lifting equipment, and provide a hoisting device for a power capacitor tower. For this reason, the utility model adopts the following technical solutions.
电力电容塔吊装装置,包括可固定安装在电容器塔梁架上的固定导轨和置于地面上的卷扬装置,其特征是:所述的固定导轨上安装一活动吊杆并在该活动吊杆与固定导轨上设置定位结构,在所述的活动吊杆上安装手扳葫芦和滑轮,所述手扳葫芦的钢丝绳绕过相应的滑轮连接吊钩,所述卷扬装置的钢丝绳绕过相应的滑轮连接吊具,所述的吊具上具有与所述的吊钩配合的吊挂部。The power capacitor tower hoisting device includes a fixed guide rail that can be fixedly installed on the capacitor tower girder frame and a hoisting device placed on the ground, and is characterized in that: a movable suspender is installed on the fixed guide rail and A positioning structure is set on the fixed guide rail, and a lever block and a pulley are installed on the movable suspender. The wire rope of the lever block goes around the corresponding pulley to connect the hook, and the wire rope of the winch device goes around the corresponding The pulley is connected with a sling, and the sling has a hanging part matched with the hook.
作为优选技术措施,所述的活动吊杆通过安装在其上的滚轮与所述的固定导轨配合实现所述活动吊杆在固定导轨上的安装。As a preferred technical measure, the movable suspender is mounted on the fixed guide rail by cooperating with the fixed guide rail through the rollers installed thereon.
作为优选技术措施,所述的定位结构为对应设在所述活动吊杆与固定导轨上的定位孔以及可插装在该定位孔内的定位销。As a preferred technical measure, the positioning structure is a positioning hole corresponding to the movable suspender and the fixed guide rail and a positioning pin that can be inserted into the positioning hole.
作为优选技术措施,为所述的固定导轨配置有压紧块。As a preferred technical measure, a pressing block is configured for the fixed guide rail.
作为优选技术措施,所述卷扬装置置放在一小车上。As a preferred technical measure, the hoisting device is placed on a trolley.
本实用新型结构轻巧,工作时可方便的安装在电容器塔梁架上,用手扳葫芦辅助卷扬装置实现对电容器的吊装,操作简易;用后便于拆卸。The utility model has a light and handy structure, and can be conveniently installed on the capacitor tower beam frame during work, and the hoisting of the capacitor can be realized with the auxiliary hoisting device of the lever hoist, which is easy to operate and easy to disassemble after use.
附图说明Description of drawings
图1是本实用新型的电力电容塔吊装装置在吊装电容器的示意图。Fig. 1 is a schematic diagram of a power capacitor tower hoisting device of the present invention hoisting a capacitor.
图2是图1的俯视图。FIG. 2 is a top view of FIG. 1 .
图3是图1的左视图。Fig. 3 is a left side view of Fig. 1 .
图4是本实用新型吊具的结构示意图。Fig. 4 is a structural schematic diagram of the sling of the utility model.
图5是图4的左视图。Fig. 5 is a left side view of Fig. 4 .
图6是图4的俯视图。FIG. 6 is a top view of FIG. 4 .
图7是本实用新型活动吊杆的结构示意图。Fig. 7 is a schematic structural view of the movable boom of the present invention.
图8是图7的俯视图。FIG. 8 is a top view of FIG. 7 .
图9是图7的左视放大图。FIG. 9 is an enlarged left view of FIG. 7 .
图10是图8中A部放大图。Fig. 10 is an enlarged view of part A in Fig. 8 .
图11是图8中B部放大图。Fig. 11 is an enlarged view of part B in Fig. 8 .
图中标号说明:1-电容器塔梁架,2-固定导轨,3-卷扬装置,4-活动吊杆,5-手扳葫芦,61、62-滑轮,7-吊钩,8-吊具,9-吊挂部,10-滚轮,11-定位孔,12-小车,13-电容器。Explanation of symbols in the figure: 1-capacitor tower beam frame, 2-fixed guide rail, 3-hoisting device, 4-movable boom, 5-hand lever block, 61, 62-pulley, 7-hook, 8-sling , 9-hanging part, 10-roller, 11-positioning hole, 12-car, 13-capacitor.
具体实施方式Detailed ways
以下结合说明书附图对本实用新型做进一步说明。Below in conjunction with accompanying drawing, the utility model is further described.
本实用新型的电力电容塔吊装装置,如图1-3所示,其包括可固定安装在电容器塔梁架1上的固定导轨2和置于地面上的卷扬装置3,特点是:固定导轨2上安装一活动吊杆4而使活动吊杆4可相对固定导轨2移动,并在该活动吊杆4与固定导轨2上设置定位结构,在活动吊杆4上安装手扳葫芦5和滑轮61、62(参见图9-11),手扳葫芦5的钢丝绳绕过相应的滑轮61(图9所示滑轮61位于活动吊杆4内侧)连接吊钩7,卷扬装置3的钢丝绳绕过相应的滑轮62(图10-11所示滑轮62位于活动吊杆4外侧)连接吊具8(如用螺栓通过吊具中间孔连接),吊具8上具有与吊钩7配合的吊挂部9(如吊具上的圆柱销)。The power capacitor tower hoisting device of the present utility model, as shown in Figure 1-3, includes a fixed guide rail 2 that can be fixedly installed on the capacitor tower beam frame 1 and a hoisting device 3 placed on the ground, and is characterized by: the fixed guide rail Install a
工作时,将固定导轨2安装在电容器塔梁架1上,活动吊杆4安装在固定导轨2上,手扳葫芦5安装在活动吊杆4上,卷扬装置3的钢丝绳绕过滑轮62连接吊具。起吊电容器13时,将电容器13结合(如捆绑)在吊具8上,启动卷扬装置3将电容器13吊至电容器塔梁架1的合适高度并停止卷扬装置,再用吊钩7钩挂在吊具8的吊挂部9,启动手扳葫芦5将吊具8和电容器13吊起至高于安装位置后停止,卷扬装置3的钢丝绳松弛,移动活动吊杆4将吊具8和电容器13移至需要安装的位置后通过定位结构定位,再次启动手扳葫芦5将吊具8和电容器13置放在安装位置,将电容器13固定并从吊具8上分离,最后将吊钩7从吊挂部9上取下;启动卷扬装置3将吊具8放下即可起吊另一电容器。当从电容器塔梁架上拆卸电容器时,可按照上述操作的逆序进行。During work, the fixed guide rail 2 is installed on the capacitor tower beam frame 1, the
作为对上述技术方案的进一步完善和补充,本实用新型还包括以下附加的技术特征,虽然可将这些附加的技术特征全部应用在图1-3所示的电力电容塔吊装装置上构成本实用新型的较佳实施例,但是本实用新型并不限于该情形,在实施本实用新型时根据具体作用将它们选用在上段所述的技术方案上:活动吊杆4通过安装在其上的滚轮10(参见图7-9)与固定导轨2配合实现活动吊杆4在固定导轨2上的安装。As a further improvement and supplement to the above-mentioned technical solution, the utility model also includes the following additional technical features, although all these additional technical features can be applied to the power capacitor tower hoisting device shown in Figures 1-3 to form the utility model preferred embodiment, but the utility model is not limited to this situation, they are selected on the technical scheme described in the previous paragraph according to the specific effect when implementing the utility model: the
定位结构为对应设在活动吊杆4与固定导轨2上的定位孔(参见图7)以及可插装在该定位孔内的定位销,通过定位销插装在对应的定位孔内实现对活动吊杆的定位。The positioning structure is a positioning hole corresponding to the
为固定导轨2配置有压紧块,便于通过该压紧块和螺栓将固定导轨安装固定在电容器塔梁架上。A compression block is configured for the fixed guide rail 2, so that the fixed guide rail can be installed and fixed on the capacitor tower beam frame through the compression block and bolts.
卷扬装置3置放在一小车12上,便于移动。Hoisting device 3 is placed on the
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202511564U CN201737611U (en) | 2010-07-07 | 2010-07-07 | Lifting device for power capacitor tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202511564U CN201737611U (en) | 2010-07-07 | 2010-07-07 | Lifting device for power capacitor tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201737611U true CN201737611U (en) | 2011-02-09 |
Family
ID=43552894
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010202511564U Expired - Lifetime CN201737611U (en) | 2010-07-07 | 2010-07-07 | Lifting device for power capacitor tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201737611U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102180423A (en) * | 2011-05-07 | 2011-09-14 | 山东电力集团公司超高压公司 | Special hoisting tool for replacing capacitor bank |
| CN105048322A (en) * | 2015-08-14 | 2015-11-11 | 中国南方电网有限责任公司超高压输电公司昆明局 | Replacement system of capacitor on tower |
| CN105540435A (en) * | 2015-12-28 | 2016-05-04 | 上海市机械施工集团有限公司 | Jacking-extending system and tower crane dismantling method |
-
2010
- 2010-07-07 CN CN2010202511564U patent/CN201737611U/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102180423A (en) * | 2011-05-07 | 2011-09-14 | 山东电力集团公司超高压公司 | Special hoisting tool for replacing capacitor bank |
| CN102180423B (en) * | 2011-05-07 | 2013-06-05 | 山东电力集团公司超高压公司 | Special hoisting tool for replacing capacitor bank |
| CN105048322A (en) * | 2015-08-14 | 2015-11-11 | 中国南方电网有限责任公司超高压输电公司昆明局 | Replacement system of capacitor on tower |
| CN105048322B (en) * | 2015-08-14 | 2017-04-26 | 中国南方电网有限责任公司超高压输电公司昆明局 | Replacement system of capacitor on tower |
| CN105540435A (en) * | 2015-12-28 | 2016-05-04 | 上海市机械施工集团有限公司 | Jacking-extending system and tower crane dismantling method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103303807A (en) | Self-lifting type crane for wind generating set | |
| CN206278864U (en) | A kind of simple machine hoisting device safeguarded for power equipment | |
| CN104192735B (en) | A kind of minor crane | |
| CN201323398Y (en) | Small-sized electric power equipment landing gear | |
| CN201737611U (en) | Lifting device for power capacitor tower | |
| CN202545121U (en) | Wind generating set with crane | |
| CN202729645U (en) | Tower crane with elevator | |
| CN203976254U (en) | A kind of emergency first-aid repair nacelle device | |
| CN203728474U (en) | Substation special elevator | |
| CN203728448U (en) | Light mounting and dismounting frame for tower crane | |
| CN202744961U (en) | Hoisting mechanism of anti-falling beam stop block | |
| CN207158647U (en) | A kind of Lift-on/Lift-off System for sound barrier panel | |
| CN203143964U (en) | Device for quickly changing blast furnace air-tight box | |
| CN201722079U (en) | Hoisting equipment for lifting and sliding steel beam units or steel trusses | |
| CN201665483U (en) | a hanging rack | |
| CN204384733U (en) | Bus plug-in strip Lift-on/Lift-off System | |
| CN104860212B (en) | A kind of micro lifter | |
| CN206538112U (en) | One kind can self-locking province force lifting apparatus | |
| CN204958265U (en) | Hoist electric block fixing device | |
| CN108726371A (en) | A kind of substation's GIS device hanging apparatus | |
| CN203976242U (en) | A kind of generator unit stator associating hanging apparatus | |
| CN103738860A (en) | Small interval dual-purpose hoisting device | |
| CN203306950U (en) | Detachable heavy portal frame | |
| CN203079643U (en) | High-altitude hoisting apparatus | |
| CN208401377U (en) | A kind of inspection platform for power station high voltage switchyard |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C56 | Change in the name or address of the patentee |
Owner name: HANGZHOU SAIQI MACHINERY CO., LTD. Free format text: FORMER NAME: HANGZHOU SIVGE AERIAL WORK MACHINERY CO., LTD. |
|
| CP01 | Change in the name or title of a patent holder |
Address after: Hangzhou City, Zhejiang province 310015 Gongshu District Kang Yin Road No. 15 Patentee after: HANGZHOU SAIQI MACHINERY CO., LTD. Address before: Hangzhou City, Zhejiang province 310015 Gongshu District Kang Yin Road No. 15 Patentee before: Hangzhou Sivge Aerial Work Machinery Co., Ltd. |
|
| CX01 | Expiry of patent term |
Granted publication date: 20110209 |
|
| CX01 | Expiry of patent term |