CN201913404U - Movable vertical electro-gas welding platform - Google Patents

Movable vertical electro-gas welding platform Download PDF

Info

Publication number
CN201913404U
CN201913404U CN2010206755178U CN201020675517U CN201913404U CN 201913404 U CN201913404 U CN 201913404U CN 2010206755178 U CN2010206755178 U CN 2010206755178U CN 201020675517 U CN201020675517 U CN 201020675517U CN 201913404 U CN201913404 U CN 201913404U
Authority
CN
China
Prior art keywords
casing
vertical gas
channel
electric welding
gas electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206755178U
Other languages
Chinese (zh)
Inventor
王玉刚
张凌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHOUSHAN COSCO-SHIPYARD GROUP CO LTD
Original Assignee
ZHOUSHAN COSCO-SHIPYARD GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHOUSHAN COSCO-SHIPYARD GROUP CO LTD filed Critical ZHOUSHAN COSCO-SHIPYARD GROUP CO LTD
Priority to CN2010206755178U priority Critical patent/CN201913404U/en
Application granted granted Critical
Publication of CN201913404U publication Critical patent/CN201913404U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Arc Welding In General (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

A movable vertical electro-gas welding platform is characterized by comprising a vertical electro-gas welding tool box and a hanging cage. The vertical electro-gas welding tool box comprises a box body, a vertical electro-gas welding machine, a head and a guide rail are arranged in the box body, the box body is detachably mounted on a deck surface, a connecting frame is fixedly mounted at the front end of the upper portion of the box body, a motor is arranged in the hanging cage, and the hanging cage can be movably arranged on the front side of the box body vertically by the aid of cables and the connecting frame. The movable vertical electro-gas welding platform is simple in structure, safe and reliable, capable of being moved conveniently and arranged stably and meeting requirements for use of vertical electro-gas welding, and can be hung to any place as needed without guide rail building, so that materials are saved, welding efficiency is increased, ship building cycle is shortened, and comprehensive benefit is increased. Accordingly, the movable vertical electro-gas welding platform is applicable to construction of large closured vertical weld joints of ships.

Description

Portable vertical gas electric welding platform
Technical field
The utility model relates to a kind of vertical gas welder equipment peculiar to vessel, especially a kind of movably vertical gas electric welding platform.
Background technology
At present, known vertical gas welder equipment peculiar to vessel is to be hung on the guide rail by cage, can realize moving of vertical direction and horizontal direction.The vertical gas electric welding can only realize the efficient welding of vertical direction weld seam, the weld seam of horizontal direction still needs manually to freeze, cage only allows two people operation in cage simultaneously, the scope of operation is narrow, overall efficiency is low, guide rail is set up length loaded down with trivial details, consuming time simultaneously, often conflicts the motor failure rate height that laterally moves on the guide rail with the deck plane Ship Structure.Though use guide tracked cage can save setting up of part scaffold, ship building period is prolonged, overall economic efficiency is low.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of portable vertical gas electric welding platform simple and reliable for structure at the above-mentioned state of the art, can conveniently move and give full play to the efficient welding performance of vertical gas electric welding.
The utility model solves the problems of the technologies described above the technical scheme that is adopted: a kind of portable vertical gas electric welding platform is characterized in that comprising:
One vertical gas welding tool case comprises casing, and casing is built-in with vertical gas electric welding machine, head and guide rail, and described casing is removably mounted on the deck plane, is mounted with the connection aggregate in the casing upper end;
One cage, in be provided with motor, by hawser be connected the front side that aggregate can be up and down vertically be arranged on casing movably.
As improvement, described connection aggregate is three channel-section steels, wherein two channel-section steels vertically are arranged on the both sides, upper end of casing, the rear end of two channel-section steels and the welding of casing upper end are fixing, another root is a transverse channel steels, laterally joint welding is provided with first hanger that is used for connecting cage at the front end of two channel-section steels at the two ends of transverse channel steels.
As improvement, the below of described transverse channel steels is provided with second hanger that is used for hanging speed difference automatic controller.
Preferably, described first hanger is four R type hangers, is weldingly fixed on the two ends, front side of transverse channel steels respectively.
Preferably, described second hanger is two C type hangers, is weldingly fixed on the below, junction of transverse channel steels and vertical two channel-section steels.
As improvement, described transverse channel steels is provided with deep bracket with the weld of two channel-section steels longitudinally, and the rear end of described two channel-section steels and the junction of casing are provided with deep bracket.
Improve, described cage is provided with control panel again, and the sidepiece of cage is provided with the roller that cooperates with guide rail.
At last, reach deck plane around the bottom of described casing and be provided with four groups of corresponding U type hangers, connect by OU orchid screw respectively, vertical gas electric welding platform is fixed on the deck plane; And be provided with the hanger that is used for the jack lift mobile box on the top of casing.
Compared with prior art, advantage of the present utility model is: the utility model is simple in structure, safe and reliable, can conveniently move and can stablize placement again, can satisfy the instructions for use of vertical gas electric welding; Need not set up guide rail, where capable of hoisting where need is, has not only saved the material of setting up of scaffold etc., and improved welding efficiency, shortened ship building period, improved comprehensive benefit, the utility model is applicable to that boats and ships close up upright construction operation to weld seam greatly.
Description of drawings
Fig. 1 is a perspective view of the present utility model;
Fig. 2 is a side view of the present utility model;
Fig. 3 is a front view of the present utility model;
Fig. 4 is a vertical view of the present utility model.
The specific embodiment
Embodiment describes in further detail the utility model below in conjunction with accompanying drawing.
As shown in the figure, a kind of portable vertical gas electric welding platform, comprise vertical gas welding tool case, cage 2 and connect aggregate, described vertical gas welding tool case comprises casing 1, casing 1 is built-in with parts such as vertical gas electric welding machine, head and guide rail, the top of described casing 1 is equipped with four hangers, by building berth jack lift this main platform body chest can be hung and need the position arbitrarily on the deck plane, around the bottom of casing 1, reach four groups of U type hangers 8 of deck plane dress weldering, connect by OU orchid screw 9, casing 1 is fixed on the deck plane; Described connection aggregate is three channel-section steels, wherein two channel-section steels 31 vertically are arranged on the both sides, upper end of casing 1, the rear end of two channel-section steels 31 and the welding of casing 1 upper end are fixing, and be provided with deep bracket 7 in the rear end of two channel-section steels 31 and the junction of lower end and casing 1, another root is a transverse channel steels 32, laterally joint welding is at the front end of two channel-section steels 31, be provided with deep bracket 7 ' at the transverse channel steels 32 and the weld of two channel-section steels 31 longitudinally, be welded with two first hangers 5 that are used for connecting the R type of cage 2 at the two ends, front side of transverse channel steels 32 respectively; Below the junction of transverse channel steels 32 and vertical two channel-section steels 31, be welded with second hanger 6 of a C type respectively, (suspension place of workmen's safety belt is when surpassing the certain speed downslide to be used for hanging speed difference automatic controller 4, can be stuck automatically, protection workmen's life security); Described cage 2 is provided with control panel, and the sidepiece of cage 2 is provided with the roller 21 that cooperates with guide rail, by motor on the cage and hawser 3, can realize moving in vertical direction, locating.
During use, adopt building berth jack lift this main platform body casing 1 winched to boats and ships close up greatly on the deck of weld seam correspondence, by OU orchid screw 9, U type hanger 8 platform is fixed on the deck plane.Through after the assay was approved, the workmen is with vertical gas electric welding head and guide rail to enter cage 2, transfer to weld seam bottom, installing the vertical gas electric welding equipment can freeze.After this section weld seam burns down, unclamp OU orchid screw 9, this platform handling to next bar is closed up the side of sewing on can begin the next round construction operation.

Claims (8)

1. portable vertical gas electric welding platform is characterized in that comprising:
One vertical gas welding tool case comprises casing, and casing is built-in with vertical gas electric welding machine, head and guide rail, and described casing is removably mounted on the deck plane, is mounted with the connection aggregate in the casing upper end;
One cage, in be provided with motor, by hawser be connected the front side that aggregate can be up and down vertically be arranged on casing movably.
2. portable vertical gas electric welding platform according to claim 1, it is characterized in that described connection aggregate is three channel-section steels, wherein two channel-section steels vertically are arranged on the both sides, upper end of casing, the rear end of two channel-section steels and the welding of casing upper end are fixing, another root is a transverse channel steels, laterally joint welding is provided with first hanger that is used for connecting cage at the front end of two channel-section steels at the two ends of transverse channel steels.
3. portable vertical gas electric welding platform according to claim 2 is characterized in that the below of described transverse channel steels is provided with second hanger that is used for hanging speed difference automatic controller.
4. portable vertical gas electric welding platform according to claim 2 is characterized in that described first hanger is four R type hangers, is weldingly fixed on the two ends, front side of transverse channel steels respectively.
5. portable vertical gas electric welding platform according to claim 3 is characterized in that described second hanger is two C type hangers, is weldingly fixed on the below, junction of transverse channel steels and vertical two channel-section steels.
6. portable vertical gas electric welding platform according to claim 2 is characterized in that the described transverse channel steels and the weld of two channel-section steels longitudinally are provided with deep bracket, and the rear end of described two channel-section steels and the junction of casing are provided with deep bracket.
7. according to claim 1 or 2 or 3 described portable vertical gas electric welding platforms, it is characterized in that described cage is provided with control panel, the sidepiece of cage is provided with the roller that cooperates with guide rail.
8. according to claim 1 or 2 or 3 described portable vertical gas electric welding platforms, the bottom that it is characterized in that described casing reaches four groups of U type hangers that deck plane is provided with correspondence all around, connect by OU orchid screw respectively, vertical gas electric welding platform is fixed on the deck plane; And be provided with the hanger that is used for the jack lift mobile box on the top of casing.
CN2010206755178U 2010-12-13 2010-12-13 Movable vertical electro-gas welding platform Expired - Fee Related CN201913404U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206755178U CN201913404U (en) 2010-12-13 2010-12-13 Movable vertical electro-gas welding platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206755178U CN201913404U (en) 2010-12-13 2010-12-13 Movable vertical electro-gas welding platform

Publications (1)

Publication Number Publication Date
CN201913404U true CN201913404U (en) 2011-08-03

Family

ID=44413220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206755178U Expired - Fee Related CN201913404U (en) 2010-12-13 2010-12-13 Movable vertical electro-gas welding platform

Country Status (1)

Country Link
CN (1) CN201913404U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111681481A (en) * 2020-05-07 2020-09-18 沪东中华造船(集团)有限公司 Vertical electrogas welding welder training device and using method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111681481A (en) * 2020-05-07 2020-09-18 沪东中华造船(集团)有限公司 Vertical electrogas welding welder training device and using method

Similar Documents

Publication Publication Date Title
CN201268938Y (en) Corner hanging cradle for working aloft
CN202925866U (en) Movable lifting work platform
CN105080016B (en) High building fire fighting rescue system Special type transportation vehicle
CN204474187U (en) A kind of wall type turning crane
CN106219420A (en) A kind of fast erecting traveling tower crane
CN201913404U (en) Movable vertical electro-gas welding platform
CN210127623U (en) Pulling-up hanging basket for construction of constructional engineering
CN203666931U (en) Wharf boarding ladder
CN107499453A (en) A kind of equipment On The Offshore Platform installation system
CN205604084U (en) Hanging flower basket device of prefabricated little case roof beam construction usefulness
CN201250058Y (en) Improved lifting trolley
CN203034370U (en) Walking car used for maintaining suspended rails
CN214935462U (en) Bridge crane capable of lifting in sectional mode
CN205382695U (en) Prop up piece concatenation formula track scaffold
CN202297055U (en) Rectangular hanging basket
CN209367327U (en) It is a kind of for coil welding and the discharging device of characteristic detecting device
CN205259564U (en) Can guidance tape track lift scaffold
CN103122607A (en) Walking trolley for maintenance of railings suspending in midair
CN205382696U (en) Concatenation formula track scaffold
CN205382698U (en) Orbital scaffold in dock area
CN205444865U (en) Prop up orbital scaffold in piece dock area
CN208226820U (en) The electric machine casing assembly or fitting table of elevator door
CN205346719U (en) Hoisting device is used in casing installation of desulphurization unit absorption tower
CN205259566U (en) Dock track scaffold
CN116290347B (en) Steel structure net rack and installation construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803