CN201908578U - Hydraulic drill frame for drilling holes on anti-impact walls - Google Patents
Hydraulic drill frame for drilling holes on anti-impact walls Download PDFInfo
- Publication number
- CN201908578U CN201908578U CN2010206908582U CN201020690858U CN201908578U CN 201908578 U CN201908578 U CN 201908578U CN 2010206908582 U CN2010206908582 U CN 2010206908582U CN 201020690858 U CN201020690858 U CN 201020690858U CN 201908578 U CN201908578 U CN 201908578U
- Authority
- CN
- China
- Prior art keywords
- hydraulic drill
- door
- clamping
- holding frame
- rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Processing Of Stones Or Stones Resemblance Materials (AREA)
- Earth Drilling (AREA)
- Drilling And Boring (AREA)
Abstract
The utility model belongs to the field of auxiliary tools of positioning machinery for drill machines, and particularly relates to a hydraulic drill frame for drilling holes on anti-impact walls, which is used for positioning a handheld hydraulic drill. The hydraulic drill frame comprises a base, a door-shaped rack is fixed on the base, a movable wall hook is disposed on the door-shaped rack, clamping racks capable of sliding vertically are penetratingly arranged on two side columns of the door-shaped rack, a bracket is disposed on one side of each clamping rack, a hydraulic drill fixing clamp is arranged in the middle of each bracket, an ejecting rod is penetratingly arranged on the outer edge of each bracket, a clamping rack lifting rod is penetrating arranged at the upper end of the door-shaped rack, and the lower end of the clamping rack is connected with the clamping racks. The hydraulic drill frame can be easily fixed on an anti-impact wall, and the height of a hydraulic drill can be adjusted vertically so as to meet the standard of construction process. The hydraulic drill frame is simple in structure, easy to be used, convenient in carrying, high in drilling precision and attractive in appearances of drilled holes, and can reduce physical consumption of constructors to the great extent.
Description
Technical field
The utility model belongs to rig and locatees mechanical aid field, specifically is a kind of crashproof wall drill hole water brill drilling cramp that hand-held water is crept into the row location.
Background technology
Domestic Line for Passenger Transportation develops rapidly, and visitor specially railway both sides is equipped with wide to be 10 centimeters steel concrete barricade, to have another name called retaining Zha Qiang, crashproof wall.Horizontal through hole between installing zone during the ZPW2000 relevant device, need bore on the wall in unit in charge of construction on crashproof wall.If use hand-held water boring (having another name called the diamond boring machine), because of the reinforcing bar of one centimeter of diameter is arranged within the walls, difficulty of construction is very big; Rig rocks seriously, causes personal damage easily; The jewel hole precision is very low, and the wall eye is not attractive in appearance, and constructor's physical demands is excessive, is difficult to carry out a large amount of jewel hole constructions.
Summary of the invention
The utility model provides a kind of simple and easy portable crashproof wall drill hole water to bore drilling cramp in order to solve hand drill and to locate the technical problem of work temporarily.
The technical scheme that addresses the above problem is: a kind of crashproof wall drill hole water bores drilling cramp, structure comprises base, on base, be fixed with portal, be provided with movable body of wall and collude on portal, the portal two side columns is equipped with the holding frame that can slide up and down, and holding frame one side is provided with carriage, the carriage middle part is provided with water and bores fixing card, be equipped with the jacking bar on the carriage outer rim, the portal upper end is equipped with the holding frame elevating lever, and holding frame elevating lever lower end connects holding frame.
During construction, drilling cramp is vertically stood on crashproof wall one side, base is pressed close to the corner, and body of wall colludes the opposite side of wall, and water bores and is fixed on the fixing card, and the compass of rotation and lifting bar is to regulate the height of holding frame.Behind the water drill bit position alignment bore position, slowly rotate the compass in the pushing ram outside, inboard compass just advances water to bore to body of wall, and rotation outside compass is until drilling through.After construction finishes, the water that accompanies fixing card can be bored and unload down, put separately, prevent to damage in the transportation water and bore.
After adopting technical scheme described in the utility model, drilling cramp can be easily fixed on the crashproof wall, and can adjust water up and down and bore height, to satisfy the construction technology standard.The constructor can free from strong physical work.Every water bores takes turns flow operation by 3 people, can be changed into 1 people's easy manipulation.Drill bit rocks very little, and penetration rate is accelerated greatly, and the hole deviation that gets out is little and attractive in appearance, and more bit change is convenient.The drilling cramp light and flexible, convenient carrying and transportation.
Description of drawings
Fig. 1 is a structural representation of the present utility model
Among the figure: the 1-base, the 2-portal, 3-holding frame, 4-holding frame elevating lever, 5-jacking bar, 6-body of wall collude, 7-water bores fixing card, 8-bolt, 9-carriage.
The specific embodiment
As schematically shown in Figure 1, a kind of crashproof wall drill hole water bores drilling cramp, structure comprises base 1, is fixed with portal 2 on base 1, is provided with body of wall and colludes 6 on portal 2, portal 2 two side columns are equipped with holding frame 3, holding frame 3 one sides are provided with carriage 9, and carriage 9 middle parts are provided with water and bore fixing card 7, are equipped with jacking bar 5 on carriage 9 outer rims, portal 2 upper ends are equipped with holding frame elevating lever 4, and holding frame elevating lever 4 lower ends connect holding frame 3.
Water described in the utility model bores drilling cramp and cooperates practical with hand-held water brill, base 1 adopts the angle steel welding, portal 2 adopts two long steel pipes and angle cleat welding, holding frame 3 is that 3 channel-section steels process, holding frame elevating lever 4 is that the compass of cover tape splicing spiral shell button on the screw rod is formed, and jacking bar 5 is for big or small two compass and long bolt are welded, and body of wall colludes 6 usefulness angle steel and welds, water bores fixing card 7 usefulness bar steel plates and processes anchor ear, and a bearing is respectively welded at the anchor ear two ends.Body of wall collude 6 and holding frame 3 adopt the big steel pipe socket with portal 2 coupling parts.
Claims (1)
1. a crashproof wall drill hole water bores drilling cramp, it is characterized in that: structure comprises base (1), on base (1), be fixed with portal (2), on portal (2), be provided with body of wall and collude (6), portal (2) two side columns is equipped with holding frame (3), holding frame (3) one sides are provided with carriage (9), carriage (9) middle part is provided with water and bores fixing card (7), be equipped with jacking bar (5) on carriage (9) outer rim, portal (2) upper end is equipped with holding frame elevating lever (4), and holding frame elevating lever (4) lower end connects holding frame (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206908582U CN201908578U (en) | 2010-12-30 | 2010-12-30 | Hydraulic drill frame for drilling holes on anti-impact walls |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206908582U CN201908578U (en) | 2010-12-30 | 2010-12-30 | Hydraulic drill frame for drilling holes on anti-impact walls |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201908578U true CN201908578U (en) | 2011-07-27 |
Family
ID=44300781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206908582U Expired - Lifetime CN201908578U (en) | 2010-12-30 | 2010-12-30 | Hydraulic drill frame for drilling holes on anti-impact walls |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201908578U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816970A (en) * | 2017-12-04 | 2018-03-20 | 三洋电梯(珠海)有限公司 | The built-in fitting divergence component and method of a kind of exterior wall elevator |
CN108031899A (en) * | 2017-12-18 | 2018-05-15 | 郑州默尔电子信息技术有限公司 | A kind of construction site wall efficient drilling device |
CN108802846A (en) * | 2018-07-21 | 2018-11-13 | 东莞市联洲知识产权运营管理有限公司 | A kind of Photoelectric Detection portal frame that height can limit |
CN113119317A (en) * | 2021-03-26 | 2021-07-16 | 中铁建电气化局集团南方工程有限公司 | Integrated drilling equipment for mounting high-speed railway signal box and operation method |
-
2010
- 2010-12-30 CN CN2010206908582U patent/CN201908578U/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816970A (en) * | 2017-12-04 | 2018-03-20 | 三洋电梯(珠海)有限公司 | The built-in fitting divergence component and method of a kind of exterior wall elevator |
CN108031899A (en) * | 2017-12-18 | 2018-05-15 | 郑州默尔电子信息技术有限公司 | A kind of construction site wall efficient drilling device |
CN108802846A (en) * | 2018-07-21 | 2018-11-13 | 东莞市联洲知识产权运营管理有限公司 | A kind of Photoelectric Detection portal frame that height can limit |
CN113119317A (en) * | 2021-03-26 | 2021-07-16 | 中铁建电气化局集团南方工程有限公司 | Integrated drilling equipment for mounting high-speed railway signal box and operation method |
CN113119317B (en) * | 2021-03-26 | 2021-11-05 | 中铁建电气化局集团南方工程有限公司 | Integrated drilling equipment for mounting high-speed railway signal box and operation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201908578U (en) | Hydraulic drill frame for drilling holes on anti-impact walls | |
CN202560096U (en) | Telescopic boom open rock drilling wagon with drill rod changing device | |
CN101812967B (en) | Deep hole drilling machine for mining | |
CN206625782U (en) | A kind of colliery automatic liquid drilol press | |
CN201671540U (en) | Mining deep hole drill rig | |
CN101392629B (en) | Portable all-hydraulic core drilling rig | |
CN104075903A (en) | Hydraulic support test device | |
CN206554795U (en) | A kind of convertible multi-angle coal mine drilling machine of crawler travel | |
CN108071339B (en) | Full-automatic tunnel drilling machine | |
CN214424100U (en) | Movable constructional column beam bottom bar planting device | |
CN203655172U (en) | Support for drilling machine for mining | |
CN201747267U (en) | Operation mechanism of mine deep-hole drilling carriage | |
CN201265354Y (en) | Light full-hydraulic core drilling rig | |
CN213359989U (en) | Efficient crawler-type drilling machine | |
CN212296225U (en) | Integrated horizontal rotating mechanical arm | |
CN211144368U (en) | Geological detection drilling equipment | |
CN202239770U (en) | Auxiliary drilling tool | |
CN212602255U (en) | Powerful belt large aperture punching machine | |
CN101769128B (en) | Connecting mechanism for dual shaft drilling machine | |
CN215718729U (en) | Large-torque drilling machine device for coal mine | |
CN213730262U (en) | Supporting auxiliary device for welding large-diameter oil and gas pipelines | |
CN206205786U (en) | Perforation drills through device in a kind of vertical drilling | |
CN210622705U (en) | Mining drilling machine | |
CN217270041U (en) | A secret water pressure detecting device for engineering geology reconnaissance | |
JPH0352879Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110727 |