CN201903448U - 动力电机试验台 - Google Patents
动力电机试验台 Download PDFInfo
- Publication number
- CN201903448U CN201903448U CN2010205968213U CN201020596821U CN201903448U CN 201903448 U CN201903448 U CN 201903448U CN 2010205968213 U CN2010205968213 U CN 2010205968213U CN 201020596821 U CN201020596821 U CN 201020596821U CN 201903448 U CN201903448 U CN 201903448U
- Authority
- CN
- China
- Prior art keywords
- dynamometer
- development
- battery simulator
- control unit
- frequency converter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
本实用新型涉及一种动力电机试验台,属于混合动力商用车和混合动力乘用车动力电机试验、开发、匹配、标定和评价研究的台架系统。测功机控制系统分别与测功机1和测功机2连接,该测功机控制系统通过以太网与仿真开发平台连接,控制单元与仿真开发平台连接,控制单元中的网络接口通过CAN总线分别与电池模拟器、变频器连接,电池模拟器与变频器连接,连接控制单元中的硬件接口与电池模拟器、加速踏板、制动踏板、换档手柄连接,控制单元中有虚拟模型。优点是结构新颖,为混合动力轿车的动力电机开发提供了系统的解决方案和验证方法,缩短了整车开发周期,降低了整车开发成本。
Description
技术领域
本实用新型涉及一种用于混合动力商用车和混合动力乘用车动力电机试验、开发、匹配、标定和评价研究的台架系统。
背景技术
随着气候的变暖,能源需求的不断增长,以及因此而导致的能源价格上扬,迫使汽车行业必须采取措施降低其产品的燃油消耗量。采用混合动力甚至全电力驱动正在成为主流发展方向,因此必须开发用于新驱动系统的动力电机系统,研发一个完整的动力电机开发及试验环境是必不可少的。
传统的动力电机试验台只能对动力电机进行简单的性能测试,只能完成一些常规的试验项目,动力电机系统与试验台之间不存在通讯联系。
发明内容
本实用新型提供一种动力电机试验台,以解决传统的动力电机试验台只能对动力电机进行简单的性能测试,只能完成一些常规的试验项目,动力电机系统与试验台之间不存在通讯联系的问题。本实用新型采取的技术方案是:测功机控制系统分别与测功机1和测功机2连接,该测功机控制系统通过以太网与仿真开发平台连接,控制单元与仿真开发平台连接,控制单元中的网络接口通过CAN总线分别与电池模拟器、变频器连接,电池模拟器与变频器连接,连接控制单元中的硬件接口与电池模拟器、加速踏板、制动踏板、换档手柄连接,控制单元中有虚拟模型;仿真开发平台包括车辆及总成开发模拟系统和远程控制。
本实用新型优点是结构新颖,为混合动力轿车的动力电机开发提供了系统的解决方案和验证方法,为整车的前期策划和方案制定及开发过程中的试验验证和后期匹配标定提供了有效的试验手段,从而大幅度降低了整车的开发风险,缩短了整车开发周期,降低了整车开发成本。
附图说明
图1是本实用新型结构示意图。
具体实施方式
测功机控制系统分别与测功机1和测功机2连接,该测功机控制系统通过以太网与仿真开发平台连接,控制单元与仿真开发平台连接,控制单元中的网络接口通过CAN总线分别与电池模拟器、变频器连接,电池模拟器与变频器连接,连接控制单元中的硬件接口与电池模拟器、加速踏板、制动踏板、换档手柄连接,控制单元中有虚拟模型;仿真开发平台包括车辆及总成开发模拟系统和远程控制。
虚拟模型包括道路模型、车辆模型、驾驶员模型、变速箱模型、动力传动模型、发动机模型、电池模型和轮胎模型。将动力电机与测功机1和测功机2连接。
Claims (1)
1.一种动力电机试验台,其特征在于:测功机控制系统分别与测功机1和测功机2连接,该测功机控制系统通过以太网与仿真开发平台连接,控制单元与仿真开发平台连接,控制单元中的网络接口通过CAN总线分别与电池模拟器、变频器连接,电池模拟器与变频器连接,连接控制单元中的硬件接口与电池模拟器、加速踏板、制动踏板、换档手柄连接,控制单元中有虚拟模型;仿真开发平台包括车辆及总成开发模拟系统和远程控制。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205968213U CN201903448U (zh) | 2010-11-09 | 2010-11-09 | 动力电机试验台 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205968213U CN201903448U (zh) | 2010-11-09 | 2010-11-09 | 动力电机试验台 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201903448U true CN201903448U (zh) | 2011-07-20 |
Family
ID=44274042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205968213U Expired - Fee Related CN201903448U (zh) | 2010-11-09 | 2010-11-09 | 动力电机试验台 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201903448U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103308036A (zh) * | 2012-03-16 | 2013-09-18 | 上海大众汽车有限公司 | 标准对中装置、发动机试验小车以及标准对中方法 |
CN105115737A (zh) * | 2015-08-27 | 2015-12-02 | 郑州日产汽车有限公司 | 电动汽车整车模拟带载试验系统 |
-
2010
- 2010-11-09 CN CN2010205968213U patent/CN201903448U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103308036A (zh) * | 2012-03-16 | 2013-09-18 | 上海大众汽车有限公司 | 标准对中装置、发动机试验小车以及标准对中方法 |
CN103308036B (zh) * | 2012-03-16 | 2015-06-17 | 上海大众汽车有限公司 | 标准对中装置、发动机试验小车以及标准对中方法 |
CN105115737A (zh) * | 2015-08-27 | 2015-12-02 | 郑州日产汽车有限公司 | 电动汽车整车模拟带载试验系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102680248B (zh) | 一种试验台架及其安装方法和测试方法 | |
CN108414244B (zh) | 一种电动汽车动力总成实车模拟试验台架及其试验方法 | |
CN203275098U (zh) | 电动汽车电驱动与驾驶员双在环模拟测试系统 | |
CN103197667B (zh) | 一种混合动力汽车整车控制器的仿真与测试方法 | |
CN107145082A (zh) | 一种插电式混合动力汽车整车控制器仿真平台 | |
CN102799743B (zh) | 一种纯电动车动力系统匹配方法 | |
CN101916519B (zh) | 一种用于电动汽车动力系统试验台架的驾驶模拟试验方法 | |
CN205002967U (zh) | 一种纯电动汽车动力总成测试平台系统 | |
CN201859056U (zh) | 自动变速器试验台 | |
CN104699070B (zh) | 一种纯电动车电气匹配半实物仿真系统 | |
CN102735303B (zh) | 一种增程式电动汽车能量消耗量实验计算方法 | |
CN102466568A (zh) | 乘用车混合动力总成试验台系统 | |
CN105446316A (zh) | 一种纯电动汽车整车控制器模型在环测试装置及其测试方法 | |
CN204405336U (zh) | 混合动力汽车整车模拟台 | |
CN104298123A (zh) | 一种整车控制器的在环仿真测试系统及测试方法 | |
CN104748981A (zh) | 一种基于人-车-路闭环控制的新能源汽车试验系统 | |
CN105372076A (zh) | 一种多功能混合动力综合试验台及其测试方法 | |
CN102692326B (zh) | 一种模拟混合动力汽车性能仿真试验装置 | |
CN201859062U (zh) | 乘用车混合动力总成试验台系统 | |
CN105115737A (zh) | 电动汽车整车模拟带载试验系统 | |
WO2022166616A1 (zh) | 软件定义混联动力总成及车辆 | |
CN110132588B (zh) | 一种用于电动轮式四驱电动车整车控制原型开发的试验台 | |
CN110780605A (zh) | 一种混合动力汽车闭环系统硬件在环仿真试验平台 | |
CN205015162U (zh) | 电动汽车整车模拟带载试验系统 | |
Chindamo et al. | Simulation tool for optimization and performance prediction of a generic hybrid electric series powertrain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110720 Termination date: 20191109 |
|
CF01 | Termination of patent right due to non-payment of annual fee |