CN201883745U - 输电铁塔组件的调整装置 - Google Patents
输电铁塔组件的调整装置 Download PDFInfo
- Publication number
- CN201883745U CN201883745U CN2010206497212U CN201020649721U CN201883745U CN 201883745 U CN201883745 U CN 201883745U CN 2010206497212 U CN2010206497212 U CN 2010206497212U CN 201020649721 U CN201020649721 U CN 201020649721U CN 201883745 U CN201883745 U CN 201883745U
- Authority
- CN
- China
- Prior art keywords
- adjusting
- rod
- cross bar
- adjusting nut
- adjusting device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
一种输电铁塔组件的调整装置,其由横杆、滑块、连杆、调节螺母和调节螺杆,在横杆上设有两个滑块,两根长度相等的连杆的一端通过销轴与滑块相连接,该两杆连杆另一端通过销轴与调节螺杆一端连接,调节螺母设于横杆中部,调节螺母与横杆之间设有转动副,调节螺母与调节螺杆相配合,两个滑块外端固定连接有卡槽。本实用新型在输电铁塔组件的调整装置中采用两个滑块与两个连杆构成滑块结构,而两个连杆与同一根螺杆连接,当通过螺母使螺杆位置移动时,便可以使滑块移动,而且该结构具有力的放大作用,因此可以通过与两个滑块相连接的卡槽连接与铁塔的立杆上,便于调节铁塔立杆,以使其适应紧固件的安装,操作方便、省力。
Description
技术领域
本实用新型涉及电力线路铁塔安装的辅助装置,具体是一种输电铁塔组件的调整装置。
背景技术
铁塔在电力线路中应用广泛,在实际使用中经常需要在塔基的立杆之间连接紧固件,有时紧固件与铁塔立杆之间不能很好的连接,其原因是塔基立杆之间的距离不合适,这时需要适当使立杆变形即可,通常由人力扳动立杆实现其与紧固件的连接。这种方法非常费力,劳动强度大,而且效果不好,有时也不能保证紧固件的正确安装,不能确保电力铁塔的安全稳固,影响输电线路的安全运行。
发明内容
本实用新型的目的在于提供一种输电铁塔组件的调整装置,所述的这种输电铁塔组件的调整装置要解决现有技术中在安装铁塔紧固时需要人力使铁塔立杆适当调整位置,导致工作强度大、而且安装效果不好的技术问题。
本实用新型的目的是通过以下技术方案实现的:其由横杆、滑块、连杆、调节螺母和调节螺杆,在横杆上设有两个滑块,两个滑块与横杆之间设有沿其长度方向的滑动副,两根长度相等的连杆的一端通过销轴与滑块相连接,该两杆连杆另一端通过销轴与调节螺杆一端连接,调节螺母设于横杆中部,调节螺母的轴线方向与横杆轴线方向垂直,调节螺母与横杆之间设有转动副,调节螺母与调节螺杆相配合,两个滑块外端固定连接有卡槽。
滑块内设有孔与横杆相配合,滑块的孔内侧壁覆设有塑料层。
调节螺母通过两个推力轴承设于横杆上。
卡槽呈U形,卡槽与铁塔组件相配合。
本实用新型和已有技术相比,其效果是积极和明显的。本实用新型在输电铁塔组件的调整装置中采用两个滑块与两个连杆构成滑块结构,而两个连杆与同一根螺杆连接,当通过螺母使螺杆位置移动时,便可以使滑块移动,而且该结构具有力的放大作用,因此可以通过与两个滑块相连接的卡槽连接与铁塔的立杆上,便于调节铁塔立杆,以使其适应紧固件的安装,操作方便、省力。
附图说明
图1是本实用新型的输电铁塔组件的调整装置的示意图。
具体实施方式
下面结合附图通过实施例对本实用新型作进一步详细说明。
如图1所示,本实用新型输电铁塔组件的调整装置,其由横杆1、滑块2、连杆3、调节螺母4和调节螺杆5,横杆1呈中空形,在横杆1上设有两个滑块2,两个滑块2与横杆1之间设有沿其长度方向的滑动副,两根长度相等的连杆3的一端通过销轴与滑块2相连接,该两杆连杆3另一端通过销轴与调节螺杆5一端连接,调节螺母4设于横杆1中部,调节螺母4的轴线方向与横杆1轴线方向垂直,调节螺母4与横杆之间设有转动副,调节螺母4通过推力轴承6设有于横杆1上,调节螺母4与调节螺杆5相配合,两个滑块2外端固定连接有卡槽7,卡槽7呈U形,卡槽7与铁塔组件相配合。滑块2内设有孔与横杆1相配合,滑块2的孔内侧壁覆设有塑料层,以减小摩擦。为了增大该装置的承载能力,连杆、滑块与卡槽均采用高强度钢板构成。为了便于旋转调节螺母,在调节螺母一端设有呈六边形的外形。
使用时,转动调节螺母使调节螺杆移动,进而使滑块移动,将滑块上的卡槽卡接于铁塔的立杆上,再根据实际需要旋转调节螺母,将两根立杆撑开或拉近。
当然,可以更换较长的连杆和调节螺杆,以改变两个滑块之间的最大距离。
Claims (4)
1. 一种输电铁塔组件的调整装置,其特征在于:其由横杆、滑块、连杆、调节螺母和调节螺杆,在横杆上设有两个滑块,两个滑块与横杆之间设有沿其长度方向的滑动副,两根长度相等的连杆的一端通过销轴与滑块相连接,该两杆连杆另一端通过销轴与调节螺杆一端连接,调节螺母设于横杆中部,调节螺母的轴线方向与横杆轴线方向垂直,调节螺母与横杆之间设有转动副,调节螺母与调节螺杆相配合,两个滑块外端固定连接有卡槽。
2.如权利要求1所述的输电铁塔组件的调整装置,其特征在于:滑块内设有孔与横杆相配合,滑块的孔内侧壁覆设有塑料层。
3.如权利要求2所述的输电铁塔组件的调整装置,其特征在于:调节螺母通过两个推力轴承设于横杆上。
4.如权利要求3所述的输电铁塔组件的调整装置,其特征在于:卡槽呈U形,卡槽与铁塔组件相配合。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206497212U CN201883745U (zh) | 2010-12-09 | 2010-12-09 | 输电铁塔组件的调整装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206497212U CN201883745U (zh) | 2010-12-09 | 2010-12-09 | 输电铁塔组件的调整装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201883745U true CN201883745U (zh) | 2011-06-29 |
Family
ID=44181285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206497212U Expired - Fee Related CN201883745U (zh) | 2010-12-09 | 2010-12-09 | 输电铁塔组件的调整装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201883745U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015784A (zh) * | 2011-09-22 | 2013-04-03 | 河南省电力公司焦作供电公司 | 输电铁塔组件的调整装置 |
CN103114757B (zh) * | 2013-03-14 | 2015-08-19 | 安徽省城建设计研究院 | 一种三管通信塔 |
CN105370086A (zh) * | 2015-11-24 | 2016-03-02 | 江苏爱福特科技开发有限公司 | 一种高度可调节的水泥杆 |
CN105571002A (zh) * | 2016-01-29 | 2016-05-11 | 太仓东能环保设备有限公司 | 一种悬挂式空气净化器 |
CN106168079A (zh) * | 2016-08-31 | 2016-11-30 | 国网山东省电力公司龙口市供电公司 | 一种电力铁塔 |
-
2010
- 2010-12-09 CN CN2010206497212U patent/CN201883745U/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103015784A (zh) * | 2011-09-22 | 2013-04-03 | 河南省电力公司焦作供电公司 | 输电铁塔组件的调整装置 |
CN103015784B (zh) * | 2011-09-22 | 2015-07-08 | 国家电网公司 | 输电铁塔组件的调整装置 |
CN103114757B (zh) * | 2013-03-14 | 2015-08-19 | 安徽省城建设计研究院 | 一种三管通信塔 |
CN105370086A (zh) * | 2015-11-24 | 2016-03-02 | 江苏爱福特科技开发有限公司 | 一种高度可调节的水泥杆 |
CN105571002A (zh) * | 2016-01-29 | 2016-05-11 | 太仓东能环保设备有限公司 | 一种悬挂式空气净化器 |
CN106168079A (zh) * | 2016-08-31 | 2016-11-30 | 国网山东省电力公司龙口市供电公司 | 一种电力铁塔 |
CN106168079B (zh) * | 2016-08-31 | 2018-04-10 | 国网山东省电力公司龙口市供电公司 | 一种电力铁塔 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201883745U (zh) | 输电铁塔组件的调整装置 | |
CN201559061U (zh) | 大型电机、减速机安装位置快速调整装置 | |
CN206671083U (zh) | 一种检测岩石强度的装置 | |
CN206445477U (zh) | 一种轴承压装机 | |
CN104868399A (zh) | 一种绝缘操作杆万向支架 | |
CN204533112U (zh) | 支吊架连接锁扣 | |
CN202388821U (zh) | 拉杆电加热拉伸预紧装置 | |
CN203754336U (zh) | 机械式千斤顶 | |
CN203307447U (zh) | 一种跨槽母线装置 | |
CN203568503U (zh) | 一种码垛机夹砖装置 | |
CN202592314U (zh) | 一种双馈风力发电机轴承组合拆卸工装 | |
CN109365608A (zh) | 一种用于金属的冲压装置 | |
CN204558853U (zh) | 一种起重设备电源滑触线的矫直装置 | |
CN103015784B (zh) | 输电铁塔组件的调整装置 | |
CN204012454U (zh) | 一种带电更换悬垂绝缘子的工具 | |
CN203972739U (zh) | 一种锻造操作机钳头夹紧机构 | |
CN203621167U (zh) | 便于调整最大矫正力的钢构件矫正装置 | |
CN203209945U (zh) | 轴承拆卸装置 | |
CN203003799U (zh) | 一种快速拔销工具 | |
CN202894159U (zh) | 杆件外螺纹滚丝机 | |
CN202807977U (zh) | 一种钢卷小车 | |
CN201940424U (zh) | 冶金立轧机夹紧装置 | |
CN203301052U (zh) | 220kV及以上输电线路更换直线杆塔绝缘子串的卡具 | |
CN201305422Y (zh) | 便携式大力千斤顶 | |
CN204760885U (zh) | 一种绝缘操作杆万向支架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110629 Termination date: 20181209 |