CN201867078U - Preheating furnace for heating materials of arc furnace - Google Patents

Preheating furnace for heating materials of arc furnace Download PDF

Info

Publication number
CN201867078U
CN201867078U CN2010206179027U CN201020617902U CN201867078U CN 201867078 U CN201867078 U CN 201867078U CN 2010206179027 U CN2010206179027 U CN 2010206179027U CN 201020617902 U CN201020617902 U CN 201020617902U CN 201867078 U CN201867078 U CN 201867078U
Authority
CN
China
Prior art keywords
flue
combustion chamber
preheating furnace
air outlet
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206179027U
Other languages
Chinese (zh)
Inventor
王洪仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010206179027U priority Critical patent/CN201867078U/en
Application granted granted Critical
Publication of CN201867078U publication Critical patent/CN201867078U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses a preheating furnace for heating materials of an arc furnace. The preheating furnace comprises a combustion chamber with an air outlet, and a flue communicated with the air outlet of the combustion chamber, wherein the flue is arranged vertically upwards; a blanking hopper is arranged in the upper part of the flue; a plurality of material guide plates are arranged in the flue below the blanking hopper; a material outlet is arranged at the bottom of the flue; and a discharge valve is arranged on the material outlet. The preheating furnace has the advantages that the air outlet of the combustion chamber is communicated with the air inlet of the flue, and a material guide passage is arranged therein; accordingly, mineral materials from the upper blanking hopper can be preheated to 1200 DEG C in a short time when dropping from the material outlet at the bottom through the material guide passage, and then the preheated materials reaching the smelting temperature are fed to the arc furnace; and the preheating furnace can lower the smelting cost in comparison to the electric heating, and is more environment-friendly without generating coal slag and waste gas by using cokes instead of coals.

Description

The preheating furnace that is used for the electric arc furnaces raw material
Technical field
The utility model relates to a kind of preheating furnace, especially relates to the preheating furnace that is used for the electric arc furnaces raw material.
Background technology
The raw mineral materials that need smelt such as bauxite etc. are thrown at normal temperatures to be warmed up in the electric arc furnaces more than 2000 ℃ and are smelted production at present.Above-mentioned production overall process all is electrical heating, and this is with regard to making that the production process power consumption is higher and improved smelting cost.In order to reduce smelting cost, usually raw mineral materials was carried out preheating earlier with cheap coal before smelting, but this causes serious pollution to environment again.
Summary of the invention
The purpose of the utility model is to provide little, the pre-thermal efficiency of a kind of environmental pollution the high preheating furnace that is used for the electric arc furnaces raw material.
For achieving the above object, the utility model can be achieved through the following technical solutions:
The preheating furnace that is used for the electric arc furnaces raw material described in the utility model, it comprises combustion chamber that has air outlet and the flue that is connected with described combustion chamber air outlet; Described flue is provided with hopper for being provided with vertically upward in the superposed flue, is provided with a plurality of stock guides in the flue below described hopper; Be provided with discharging opening in described flue bottom, it is provided with discharge valve.
Described stock guide is crisscross arranged and all downward-sloping formation guide passage about in flue.
Air outlet is provided with protection network in described combustion chamber.
Advantage of the present utility model is the air outlet of combustion chamber is connected with the flue air inlet, built-in guide passage, material falls through the discharging opening of guide passage from the bottom from the hopper on top and falls, so just can carry out preheating to raw mineral materials at short notice, make it to reach the high temperature of 1200 degree, drop into again and make it to reach smelting temperature in the electric arc furnaces.Reduced smelting cost than electrical heating, coke does not have cinder and waste gas, environmental protection more again than fire coal.Stock guide is crisscross arranged and all downward-sloping formation guide passage about in flue, has increased the time of being heated when material falls, and has increased the utilization of heat energy greatly.Air outlet is provided with protection network in the combustion chamber, falls in the combustion chamber when preventing the solid accumulation heating.
Description of drawings:
Fig. 1 is a structural representation of the present utility model.
The specific embodiment:
As shown in the figure, the preheating furnace that is used for the electric arc furnaces raw material described in the utility model, it comprises combustion chamber 1 that has air outlet and the flue 2 that is connected with described combustion chamber 1 air outlet; Described flue 2 is provided with hopper 3 for being provided with vertically upward in the superposed flue 2, is provided with a plurality of stock guides 4 in the flue 2 below described hopper 3; Be provided with discharging opening 5 in described flue 2 bottoms, it is provided with discharge valve 6; Described stock guide 4 is crisscross arranged and all downward-sloping formation guide passage about in flue 2, and 1 air outlet is provided with protection network 7 in described combustion chamber.

Claims (3)

1. preheating furnace that is used for the electric arc furnaces raw material, it comprises combustion chamber (1) that has air outlet and the flue (2) that is connected with described combustion chamber (1) air outlet; It is characterized in that: described flue (2) is provided with hopper (3) for being provided with vertically upward in the superposed flue (2), is provided with a plurality of stock guides (4) in the flue (2) of described hopper (3) below; Be provided with discharging opening (5) in described flue (2) bottom, it is provided with discharge valve (6).
2. the preheating furnace that is used for the electric arc furnaces raw material according to claim 1 is characterized in that: described stock guide (4) is crisscross arranged and all downward-sloping formation guide passage about in flue (2).
3. the preheating furnace that is used for the electric arc furnaces raw material according to claim 1 is characterized in that: air outlet is provided with protection network (7) in described combustion chamber (1).
CN2010206179027U 2010-11-22 2010-11-22 Preheating furnace for heating materials of arc furnace Expired - Fee Related CN201867078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206179027U CN201867078U (en) 2010-11-22 2010-11-22 Preheating furnace for heating materials of arc furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206179027U CN201867078U (en) 2010-11-22 2010-11-22 Preheating furnace for heating materials of arc furnace

Publications (1)

Publication Number Publication Date
CN201867078U true CN201867078U (en) 2011-06-15

Family

ID=44138230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206179027U Expired - Fee Related CN201867078U (en) 2010-11-22 2010-11-22 Preheating furnace for heating materials of arc furnace

Country Status (1)

Country Link
CN (1) CN201867078U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102815731A (en) * 2012-09-12 2012-12-12 王洪仁 Smelting technique of brown corundum
CN108950123A (en) * 2018-08-13 2018-12-07 东北大学 A kind of steel-making material on-line mixing preheating device and method
CN114394821A (en) * 2022-01-18 2022-04-26 山西吕梁山矿产品有限公司 Process for producing brown corundum by combining rotary kiln and electric arc furnace

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102815731A (en) * 2012-09-12 2012-12-12 王洪仁 Smelting technique of brown corundum
CN108950123A (en) * 2018-08-13 2018-12-07 东北大学 A kind of steel-making material on-line mixing preheating device and method
CN108950123B (en) * 2018-08-13 2020-03-31 东北大学 Online mixing and preheating device and method for steelmaking materials
CN114394821A (en) * 2022-01-18 2022-04-26 山西吕梁山矿产品有限公司 Process for producing brown corundum by combining rotary kiln and electric arc furnace

Similar Documents

Publication Publication Date Title
CN103496702B (en) Production device for coproduction of calcium carbide by electrothermal method and oxygen thermal method
CN101649214B (en) Externally-fired oil shale distillation process and device
CN105668568B (en) Produce the system and method for calcium carbide
CN105164284B (en) Method and apparatus for producing titanium slag by ilmenite
JP2013511618A (en) All-oxygen-hydrogen-rich coal gas iron making method and apparatus (METHODANDAPPARATUSFORIRONMAKINGINGFULL-OXYGENHYDROGEN-RICHGAS)
CN105039627A (en) Coal-based direct reduction-melt separation furnace smelting reduction iron-making process using external heating mode
CN100451133C (en) Method and apparatus for producing directly reduced iron with coke oven gas
CN201867078U (en) Preheating furnace for heating materials of arc furnace
CN103303900A (en) Production device of semi-coke and lime co-produced calcium carbide
CN101805811B (en) Method and device for smelting iron by using pure-oxygen and hydrogen-rich gas
CN102944110A (en) Smelting furnace for recovering lead from waste lead-acid storage battery
CN100362119C (en) Multiple heat resources-electric warming magnesium smelting apparatus and process
CN101963455A (en) Metallurgy steel heating furnace system using biomass gas
CN102079982B (en) Production method of formed coke
CN103205584A (en) Production device and production method of manganese monoxide mineral powder
WO2009030064A1 (en) A process for non-coke smelting iron and steel
CN1810929A (en) Coal gas-recovering economizing clean coking process
CN106010610A (en) Low-order pulverized coal hydrogenated and pressurized fast low-temperature carbonization process and device
CN102559978A (en) Method for producing sponge iron by electric heating and system thereof
CN201313882Y (en) Oil shale gas full-cycling gas retort furnace with daily processing capacity of 300 tons
CN101845529B (en) Preheating reduction furnace for iron making through smelting reduction
CN103710550A (en) Method for poly-generation and large-scale coupling production based on semi coke and magnesium
CN203443337U (en) Aluminum, zinc, copper and magnesium smelting furnace using bio-particles
CN210103844U (en) Combined retort furnace
CN103060502B (en) Process for one-time reduction melting of ferric silicate by using waste copper residue

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110615

Termination date: 20121122